首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Large dam construction for irrigation, hydropower, water supply, and flood control in tropical to sub-tropical areas increased markedly after 1950. Many of the dams built during this period have filled with sediment and no longer perform to their original design specifications; in many cases, forecast dam life was greatly overestimated. This study investigates the useful life of Burdekin Falls Dam (BFD), northeastern Australia and compares the findings with other tropical reservoirs. Using two independent methods it is estimated that between 61 and 65 million m3 of sediment has been deposited in the reservoir over the 24 years of operation through 2011. This sediment volume equates to an average of 0.15% of capacity lost per year since construction was completed. If current sediment loads/climate regimes persist, reservoir capacity will be reduced by 50% after 345 years. However, the useful life of the BFD reduces to just 276 years when drawdown data are considered; these data show reservoir use would be affected once 40% of storage was filled with sediment, with a 60% drawdown return period of 1 in 15 years. When compared to similar large tropical to sub-tropical reservoirs, the BFD has a slightly longer reservoir useful life than dams in India and a much longer half-life than for both similar-sized and larger dams in China, Brazil, and Iran. Properties of the BFD that promote a longer useful life include a lower trap efficiency, relatively low annual sediment load delivered to the reservoir, limited sediment deposition behind the dam wall (and uniform distribution of deposited sediment), and the export of highly turbid annual floodwaters before settling and deposition of any remaining sediment within the reservoir.  相似文献   

2.
Abstract

Reservoir silting is one of the principal problems affecting the performance of dams in Algeria from the standpoint of reservoir capacity for storage. Foum El Kherza Reservoir (also known as Foum El Gherza), near Biskra Town, Algeria, is subject to dredging operations with the intent of recovering 70% of its initial storage capacity of 47 hm3 (million cubic metres). The forecasting of sediment volume trapped in the reservoir is essential to plan the future use of this resource and to sustain irrigation for the palm groves characteristic of the region. However, there are currently no sediment data, nor a sediment rating curve, for predicting sediment inflow based on hydrological data. This paper describes the optimization of a cumulative trapped sediment curve for Foum El Kherza Reservoir based on 44 years of daily inflows, by using a spreadsheet optimization tool, Microsoft Excel® Solver to calibrate the cumulative sediment load against the cumulative sediment inflow as documented by eight bathymetric surveys since the dam construction.

Editor D. Koutsoyiannis; Associate editor A. Montanari

Citation Tebbi, F.Z., Dridi, H., and Morris, G.L., 2012. Optimization of cumulative trapped sediment curve for an arid zone reservoir: Foum El Kherza (Biskra, Algeria). Hydrological Sciences Journal, 57 (7), 1368–1377.  相似文献   

3.
Reservoir construction can lead to much more water stored in front of the dam and significantly increase heat storage capacity of the reservoir waters, thus resulting in different distribution pattern of water temperature in reservoir area compared to river. Especially for large reservoir, the obvious stratification of water temperature will appear in the reservoir with deeper water levels. Meanwhile, the low water temperature will be observed in the downstream river due to the operation of the reservoir. The vertical numerical simulation model for reservoir from MIKE 11 was used to predict the changes of water temperature of Wuxikou Reservoir to check the effects of the reservoir construction on water temperature. The water temperature prediction model was developed to simulate the water temperature of the reservoir and the discharged outflow water. The predicted results can contribute to assessing the feasibility of the pre‐constructed project based on the environmental influence of water temperature.  相似文献   

4.
Abstract

A real-time operational methodology has been developed for multipurpose reservoir operation for irrigation and hydropower generation with application to the Bhadra reservoir system in the state of Karnataka, India. The methodology consists of three phases of computer modelling. In the first phase, the optimal release policy for a given initial storage and inflow is determined using a stochastic dynamic programming (SDP) model. Streamflow forecasting using an adaptive AutoRegressive Integrated Moving Average (ARIMA) model constitutes the second phase. A real-time simulation model is developed in the third phase using the forecast inflows of phase 2 and the operating policy of phase 1. A comparison of the optimal monthly real-time operation with the historical operation demonstrates the relevance, applicability and the relative advantage of the proposed methodology.  相似文献   

5.
This paper presents a chance-constrained programming model for optimal control of a multipurpose reservoir and its modification to a model for single reservoir design. An algorithm is developed for solving complex stochastic problems of multipurpose reservoir planning and design. The complexity of the problem is resolved by a two-step algorithm: (1) transformation of chance constraints on the state and control variables is performed at the first step; and (2) the choice of optimum control or optimal reservoir storage is carried out in the second step. The method of iterative convolution is chosen for the first step, while linear programming is selected for the second step. The algorithm allows the use of random inflows and random demands together with other deterministic demands. The reservoir design problem is presented as a modified optimal control problem. The procedure is illustrated with an example of a hypothetical reservoir design problem with three different types of downstream releases (hydropower production, municipal water supply, and irrigation).  相似文献   

6.
The Karama Dam, with a capacity of 55 Mio m3, was constructed in 1995 on Wadi Mallaha in the Jordan Valley area in order to store water for irrigational uses. The dam was constructed in spite of experts' warnings that this dam geologically, hydrogeologically, seismically, and from the points of view of salinity of its water, its management and the water resources to fill it is totally irrelevant, and that the dam will fail to fulfill its purposes. Now after 9 years of its construction the dam fails to collect water because there are no sources available to fill it. The water the farmers were deprived of to partially fill the dam to demonstrate its success became in the dam reservoir highly saline (20 000 μS/cm). Reservoir bottom collapses due to dissolution of salts took place and large water amounts were lost to the underground. Not a single drop of water from the dam has been of any use for any purpose until now. Equipment to pump water for irrigational uses has been corroding, and the government is paying the depreciation, capital, and running cost of a fiasco project.  相似文献   

7.
This paper presents optimization and uncertainty analysis of operation policies for Hirakud reservoir system in Orissa state, India. The Hirakud reservoir project serves multiple purposes such as flood control, irrigation and power generation in that order of priority. A 10-daily reservoir operation model is formulated to maximize annual hydropower production subjected to satisfying flood control restrictions, irrigation requirements, and various other physical and technical constraints. The reservoir operational model is solved by using elitist-mutated particle swarm optimization (EMPSO) method, and the uncertainty in release decisions and end-storages are analyzed. On comparing the annual hydropower production obtained by EMPSO method with historical annual hydropower, it is found that there is a greater chance of improving the system performance by optimally operating the reservoir system. The analysis also reveals that the inflow into reservoir is highly uncertain variable, which significantly influences the operational decisions for reservoir system. Hence, in order to account uncertainty in inflow, the reservoir operation model is solved for different exceedance probabilities of inflows. The uncertainty in inflows is represented through probability distributions such as normal, lognormal, exponential and generalized extreme value distributions; and the best fit model is selected to obtain inflows for different exceedance probabilities. Then the reservoir operation model is solved using EMPSO method to arrive at suitable operational policies corresponding to various inflow scenarios. The results show that the amount of annual hydropower generated decreases as the value of inflow exceedance probability increases. The obtained operational polices provides confidence in release decisions, therefore these could be useful for reservoir operation.  相似文献   

8.
《水文科学杂志》2013,58(2):434-447
Abstract

The behaviour of statistical performance indices, namely, reliability, resilience and vulnerability for a multipurpose storage reservoir is examined. Monte Carlo simulations were carried using data of the Dharoi Reservoir (India) and the inflows to the reservoir were generated by following two approaches: long-memory models and short-memory models. Statistical behaviour of three indices were examined for two cases: (i) municipal and industrial water supply; and (ii) irrigation, thus making a total of six indices for the analysis. To interpret the behaviour of these indices, a probabilistic approach was followed. It was noted that when inflows generated using long-memory models were input in simulation, there were large variations in reliability, resilience and vulnerability among the runs. In contrast, when data from short-memory models were used, the indices were confined to a narrow band. Average values of reliabilities and their variance for both the demands were much higher when the data generated using short-memory models were used. Since natural geophysical hydrological data series display persistence, the results pertaining to long-memory model are closer to reality. It was also shown that the framework of analysis presented can be very useful for multicriteria analysis and interpretation of trade-offs in the reliability space.  相似文献   

9.
《国际泥沙研究》2022,37(5):576-588
Numerous irrigation schemes in sub-Saharan Africa (SSA) exhibit excessive sedimentation, resulting in underperformance and high maintenance costs. In the current study, a participatory monitoring program was used to investigate sediment causes and sources, measure the annual sediment load, and monitor desilting campaigns in two small scale irrigation schemes in Ethiopia, Arata-Chufa (100 ha) and Ketar (430 ha), for three years (2016–2018). Sedimentation quantities were huge, where the annual river sediment influx ranged from 220 m3 for the Arata-Chufa scheme to 1,741 m3 for the Ketar scheme. On average 0.3 m3/m of sediment were removed from the main canal for Arata-Chufa costing 794 days of labor per year. In Ketar, sediment quantities were even greater: 1.1 m3/m was removed requiring 3,118 days of labor per year. The sediment influx from the river source amounts to up to 95% for Arata-Chufa and moderately reaches 46% for Ketar, with the remainder of the sediment entering with overland erosion flows. Farmers reported increased sedimentation over time and difficulty paying operation and maintenance fees instead preferring to contribute labor for the desilting campaigns. Sedimentation management is fragile and mainly involves frequent desilting campaigns and unharmonized efforts to reduce overland sediment inflows. Factors contributing to sediment deposition include mild longitudinal bed slopes, the location of the intake, canal layout, and lack of canal banks for protection against surface water inflow in addition to sub-optimal canal operations. Excessive sedimentation is a major challenge resulting in underperformance of numerous irrigation schemes in SSA, and the stakeholders’ lack of awareness of the sources of sedimentation is an underlying factor aggravating sedimentation problems. It is concluded that investigating the sources, extent, and types of sedimentation entering a small-scale irrigation scheme is the basis for reducing maintenance costs and for effective management of sedimentation problems.  相似文献   

10.
The Three Gorges Project is the world's largest water conservancy project. According to the design standards for the 1,000‐year flood, flood diversion areas in the Jingjiang reach of the Yangtze River must be utilized to ensure the safety of the Jingjiang area and the city of Wuhan. However, once these areas are used, the economic and life loss in these areas may be very great. Therefore, it is vital to reduce this loss by developing a scheme that reduces the use of the flood diversion areas through flood regulation by the Three Gorges Reservoir (TGR), under the premise of ensuring the safety of the Three Gorges Dam. For a 1,000‐year flood on the basis of a highly destructive flood in 1954, this paper evaluates scheduling schemes in which flood diversion areas are or are not used. The schemes are simulated based on 2.5‐m resolution reservoir topography and an optimized model of dynamic capacity flood regulation. The simulation results show the following. (a) In accord with the normal flood‐control regulation discharge, the maximum water level above the dam should be not more than 175 m, which ensures the safety of the dam and reservoir area. However, it is necessary to utilize the flood diversion areas within the Jingjiang area, and flood discharge can reach 2.81 billion m3. (b) In the case of relying on the TGR to impound floodwaters independently rather than using the flood diversion areas, the maximum water level above the dam reaches 177.35 m, which is less than the flood check level of 180.4 m to ensure the safety of the Three Gorges Dam. The average increase of the TGR water level in the Chongqing area is not more than 0.11 m, which indicates no significant effect on the upstream reservoir area. Comparing the various scheduling schemes, when the flood diversion areas are not used, it is believed that the TGR can execute safe flood control for a 1,000‐year flood, thereby greatly reducing flood damage.  相似文献   

11.
The Cerro Prieto dam, a relatively small water reservoir in NE Mexico, is one of the main resources of potable water for Monterrey, a city with a population of about four million inhabitants. A high resolution seismic study using non-linear parametric sub-bottom echo-sounder SES-2000 was carried out in this water reservoir. High resolution acoustic data interpretation shows that the thickness of recent sediments due to siltation of the reservoir reaches 3.5-4.0 m. It shows a high recent sedimentation rate (1-2 up to 14 cm/ year). Based on the echo-sounder data, the first bathymetric map and a digital model of recent sediment thickness were designed. A significant (5-12%) difference between the volume capacity value used by National Commission of Water (CNA) and acoustic survey results was revealed. Differences between the CNA and acoustic data indicate storage losses from 12-17 up to 30 million cubic meters. The results obtained through study such as this one, could be useful to improve a water resources management.  相似文献   

12.
The advantage of an irrigation system is that experiments of varying precipitation duration and intensity can be performed in a controlled situation. An effective portable irrigation system is described for use in experimental plot hillslope and wetland runoff studies. The system consists of four parts:(1) a water pump; (2) a tracer reservoir; (3) a chemical feed pump; and (4) distribution hoses. Relatively uniform water application is achieved by a series of manual valves controlling water flow from the main carrier hose to the distribution hoses. The irrigation system materials are inexpensive and installation and operation costs are minor. The system was used to study runoff generation from a small‐saturated area in a spring‐fed swamp for a range of precipitation intensities and durations. The irrigation system applied a maximum intensity of 14·0mm h?1, for a maximum duration of 180 min, to a 190m2 area. This range of application incorporated all storms up to a one in three year event. The variance of the tracer load was almost three times greater for natural (60%) than with the irrigation system (22%). The irrigation system reduced the uncertainty in the pre‐event water fraction (using a two‐component hydrograph separation) from 3·4% in natural events to only 0·7%. The irrigation system design, operation, calibration and cost are presented. Copyright © 2001 John Wiley & Sons, Ltd.  相似文献   

13.
李祖忠  张旭东  江聪  杜涛  曾凌 《湖泊科学》2023,35(5):1822-1831
三峡水库蓄水引起库区水位抬升,水面面积显著增加,对区域水文循环过程产生了一定影响。为揭示三峡水库蓄水前后水面面积及蒸发损失变化规律,选取三峡库区坝前至寸滩区间作为研究区,利用Landsat影像数据提取1982—2021年水面面积,分区建立水位与面积关系曲线,进而推求库区逐日水面面积。在估计三峡库区水面面积的基础上,结合站点潜在蒸发资料推求水面蒸发损失量。研究结果表明:2010年三峡水库全面运行后,坝前至寸滩库区平均水面面积由蓄水前的372.96km2,增加到761.31km2,较蓄水前增加了1.04倍。同时,三峡水库的蓄泄调节改变了库区河段原有的水文节律,使得库区水面面积的季节性变化特征较蓄水前发生了显著变化。蓄水后,冬季水面面积最大,平均为843.81km2,较蓄水前增加了1.89倍;秋季、春季次之,水面面积分别为818.73和735.28km2,较蓄水前分别增加了97.17%和1.28倍;夏季水面面积最小,为653.03km2,较蓄水前仅增加了39.06%。水库全面运行后,...  相似文献   

14.
Forced vibration field tests and finite-element studies were conducted on the Shahid Rajaee concrete arch dam in Northern Iran to determine the dynamic properties of the dam–reservoir–foundation system. The first forced vibration tests on the dam were performed with two different types of exciter units, with a limited maximum force, bolted on the dam crest for alternative in-phase and out-of-phase sequencing. Because of an insufficient number of recording sensors, two arrangements of sensors were used to cover sufficient points on the dam crest and one gallery during tests. Two kinds of vibration tests, on–off and frequency sweeping, were carried out on the dam. The primary natural frequencies of the coupled system for both symmetric and anti-symmetric vibration modes were approximated during on–off tests in two types of sequencing of exciters, in phase and out-of-phase, with a maximum frequency of 14 Hz. The principal forced vibration tests were performed at precise resonant frequencies based on the results of the on–off tests in which sweeping around the approximated frequencies at 0.1 Hz increments was performed. Baseline correction and suitable bandpass filtering were applied to the test records and then signal processing was carried out to compute the auto power, cross power and coherence spectra. Nine middle modes of vibration of the coupled system and corresponding damping ratios were estimated. The empirical results are compared against the results from calibrated finite-element modeling of the system using former ambient vibration tests, considering the dam–reservoir–foundation interaction effects. Good agreement is obtained between experimental and numerical results for eight middle modes of the dam–reservoir–foundation system.  相似文献   

15.
Among the difficulties that influence future dam operations,reservoir sedimentation is the most problematic for engineers.This study predicted the amount and pattern of sedimentation for use in estimation of the useful lifespan of reservoirs and identification of optimal locations for outlets and intakes at the initial stages of dam design.Hydrographic surveys of different dams can provide better insight into this phenomenon.Latian Dam in Iran has conducted hydrographic surveys during 7 time periods.The amount and process of sedimentation in this reservoir were determined,and predictions of distribution of sediments were validated by well-known,common methods.The formation of a delta in the reservoir was investigated for different time periods after operation.Future problems due to the impacts of sedimentation on dam operation and the useful lifespan of the reservoir were predicted.In addition,the study results may be used for developing empirical methods to predict sedimentation patterns in other reservoirs.  相似文献   

16.
Construction of dams and the resulting water impoundments are one of the most common engineering procedures implemented on river systems globally; yet simulating reservoir operation at the regional and global scales remains a challenge in human–earth system interactions studies. Developing a general reservoir operating scheme suitable for use in large-scale hydrological models can improve our understanding of the broad impacts of dams operation. Here we present a novel use of artificial neural networks to map the general input/output relationships in actual operating rules of real world dams. We developed a new general reservoir operation scheme (GROS) which may be added to daily hydrologic routing models for simulating the releases from dams, in regional and global-scale studies. We show the advantage of our model in distinguishing between dams with various storage capacities by demonstrating how it modifies the reservoir operation in respond to changes in capacity of dams. Embedding GROS in a water balance model, we analyze the hydrological impact of dam size as well as their distribution pattern within a drainage basin and conclude that for large-scale studies it is generally acceptable to aggregate the capacity of smaller dams and instead model a hypothetical larger dam with the same total storage capacity; however we suggest limiting the aggregation area to HUC 8 sub-basins (approximately equal to the area of a 60 km or a 30 arc minute grid cell) to avoid exaggerated results.  相似文献   

17.
PREDICTINGRESERVOIRSEDIMENTATIONWITH2DMODELFLOODSIMW.BECHTELER1andM.NUJIC2ABSTRACTPredictionofsedimentationisveryimportantbef...  相似文献   

18.
金沙江下游4个梯级水电站总装机容量相当于两座三峡水库,是“西电东送”中部地区的源头工程,工程效益发挥对经济社会发展意义重大。2012年以来,向家坝、溪洛渡、乌东德和白鹤滩电站等陆续蓄水运行,层层拦截金沙江的泥沙,2013—2020年向家坝出库年输沙量均值下降至152万t,减幅超过99%。大量泥沙淤积在梯级水库内,同时向家坝以下河道发生长距离冲刷。本文以自金沙江下游工程筹建以来的观测资料为基础,针对梯级水库的泥沙淤积和坝下游河道冲刷规律开展研究,结果表明:金沙江下游四个梯级电站自建成运行至2020年底,累计淤积泥沙约5.98亿m3,其中溪洛渡库区淤积量占比达92.5%,2013-2020年溪洛渡和向家坝水库排沙比分别为2.64%和22.2%,其水库泥沙主要淤积在常年回水区的干流河道内,以死库容内淤积为主,侵占有效库容的比例小于1.3%。金沙江下游库区干流河道的峡谷特征明显,淤积多表现为主河槽的平铺式淤高。溪洛渡和向家坝库区淤积的泥沙沿程分选特征明显,越靠近坝前,中数粒径减小、细颗粒泥沙沙量百分数增加,极细颗粒泥沙会在库区一定范围内大量沉积。向家坝下游河床普遍冲刷,但...  相似文献   

19.
The reservoir of Fierza on the Drini River, Northern Albania, is Albania's largest reservoir and it is one of the world's largest reservoirs of high dams (reservoir volume at maximum water level, 2.8 * 109 m3; dam height, 167 m and dam capacity 8 * 106 m3). We compare pre-and postimpounding seismicity of the area surrounding the Fierza reservoir. An increase of seismic microactivity was observed after the impounding of the reservoir. More than 300 microearthquakes, occurred in the immediate vicinity of the main body of the reservoir, with local magnitude ranging between 1.3 and 3.6. A significant change of theb value in the magnitude-frequency relationship was observed. One swarm of microtremors occurred in the northern part of the reservoir on April 4–5, 1981, where an alteration of the tensor of natural tectonic stresses is revealed. The theoretical additional stress and displacement induced by water-load in the bank of the reservoir were estimated for four cross-profiles of the reservoir area and the maximum values resulted near the location of the above swarm.  相似文献   

20.
Owing to the devastating M7.6 earthquake of 20 June 1990 that occurred in the northern province of Iran, Sefid‐rud concrete buttress dam located near the epicenter was severely shaken. The crack penetrated throughout the dam thickness near slope discontinuity, causing severe leakage, but with no general failure. In this study, nonlinear seismic response of the highest monolith with empty reservoir is investigated experimentally through model testing. A geometric‐scaled model of 1:30 was tested on a shaking table with high‐frequency capability to study dynamic cracking of the model and serve as data for nonlinear computer model calibration. Three construction joints are set up in the model to simulate effects of construction aspects. The experimental results are then compared with smeared crack and damage mechanics finite‐element simulations using nonlinear concrete constitutive models based on fracture mechanics. The crack patterns obtained from numerical models are in good agreement with those obtained from shaking table tests for the case of including construction joint effects and rigid foundation. Copyright © 2008 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号