共查询到20条相似文献,搜索用时 234 毫秒
1.
Coarse bedload transport dynamics are investigated utilizing hydrodynamic and sediment transport data obtained in an extensively instrumented study reach located in Squaw Creek, Montana, USA. During 1991 and 1992, a number of discrete bedload transport events associated with the daily rise and fall in stream discharge were investigated. Data show that initiation of sediment transport was accompanied by a reduction in bed roughness and by changes in bulk hydraulic parameters. For larger discharges, coarser fractions of the bed material mobilized, and bedload transport rates and average hydraulic parameters stabilized. As discharge reduced, mobile coarse particles became less frequent and deposited fine particles were removed, resulting in an increase in bed roughness. These observations are attributed to the downstream translation of bar sediments during the passage of a hydrograph. Bedload pulses were aperiodic but spatially variable. Flow turbulence and velocity profile data obtained during low flows allowed comparison between average bed shear stress and apparent bed roughness estimates obtained using different approaches. © 1998 John Wiley & Sons, Ltd. 相似文献
2.
We monitor bedload transport and water discharge at six stations in two forested headwater streams of the Columbia Mountains, Canada. The nested monitoring network is designed to examine the effects of channel bed texture, and the influence of alluvial (i.e. step pools and riffle pools) and semialluvial morphologies (i.e. boulder cascades and forced step pools) on bedload entrainment and transport. Results indicate that dynamics of bedload entrainment are influenced by differences in flow resistance attributable to morphology. Scaled fractional analysis shows that in reaches with high form resistance most bedload transport occurs in partial mobility fashion relative to the available bed material, while calibers finer than 16 mm attain full mobility during bankfull flows. Equal mobility transport for a wider range of grain sizes is achieved in reaches exhibiting reduced form resistance. Our findings confirm that the Shields value for mobilization of the median surface grain size depends on channel gradient and relative submergence; however, we also find that these relations vary considerably for cobble and gravel bed channels due to proportionality between dimensionless shear stress and grain size. Exponents of bedload rating curves across sites correlate most with the D90s of the mobile bed, however, where grain effects are controlled (i.e. along individual streams), differences in form resistance across morphologies exert a primary control on bedload transport dynamics. Application of empirical formulae developed for use in steep alpine channels present variable success in predicting transport rates in forested snowmelt streams. Formulae that explicitly account for reductions in mobile bed area and high morphological resistance associated with woody debris provide the best approximation to observed empirical data. Copyright © 2014 John Wiley & Sons, Ltd. 相似文献
3.
Understanding bedload transport fluctuations in rivers is crucial for complementing the existing knowledge on sediment transport theory. In this contribution, we use a natural-scale laboratory flume to analyse bedload transport fluctuations in non-uniform sand under normal flow conditions. Based on the significance of downward seepage, we incorporate the seepage effect on bedload transport over a non-uniform sand bed channel. The weight of the dry material was measured, and the volumetric transport rate per unit width (bedload transport rate) was estimated. An important observation is that the bedload transport rate initially rapidly increases with time and reaches a maximum value. Based on experimental data, we propose an empirical expression to estimate temporal bedload transport. In addition, an empirical model for bedload transport is proposed by incorporating downward seepage among other variables. The performance of several existing bedload transport formulae was also taken into account by the experimental datasets. 相似文献
4.
Hydraulic engineering is usually based on theoretical analysis and/or numerical modelling simulation. As the dynamic behaviour of sediment movement under unsteady flow is still unclear, and field measurement is comparatively difficult during a large flood, prior investigations through flume experiments are required. A series of flume experiments, conducted using different inflow hydrographs without sediment supply from upstream, was carried out to investigate the sediment transport process under unsteady flow conditions. A series of triangular hydrographs were performed in the experiments. The results indicate that a temporal lag was found between the flow hydrograph peak and the sediment hydrograph peak because large size sand dunes lasted for a short period in the falling limb of the flow hydrograph. The temporal lag was found to be about equal to 6–15% of the flow hydrograph duration. Owing to the temporal lag, the total bedload yield in the rising period was less than that in the falling period. Furthermore, the measured total bedload yield in the unsteady flow experiments was larger than the predicted value, which was estimated by using the results obtained from the equivalent steady flow experiment. The peak bedload transport rate for unsteady flow conditions was also larger than the predicted value. The ratios of the measured to the predicted quantities mentioned above were found to be constant values for different shapes of hydrographs. It is, therefore, expected that the analytical results of sediment transport from equivalent steady flow can be a good reference for sediment transport under unsteady flow conditions. Copyright © 2004 John Wiley & Sons, Ltd. 相似文献
5.
Panayiotis Diplas 《地球表面变化过程与地形》1992,17(6):629-632
Two methods that were recently proposed for calculating fractional bedload transport rates in gravel-bed streams are examined closely. Both of them employ the Oak Creek bedload data. The Diplas (PD) method is guided by dimensional analysis and, therefore, can be used to predict bedload transport in different gravel rivers. The only requirement for using this method is the knowledge of the subsurface material size distribution of the stream of interest. The expression for the fractional bedload transport obtained by the Shih and Komar (SK) method for Oak Creek cannot be used for other streams. Its use for a given stream requires information that is rarely available. For the Oak Creek case both methods demonstrate similar predictive ability. 相似文献
6.
We report on bedload transport observations using piezoelectric bedload impact sensors (PBIS), an indirect method of estimating the volume of bedload transport of coarse sediment. The PBIS device registers vibrations produced by bedload (particle diameter >~20 mm) and records the signal as a sum of the number of impulses per time. Sediment transport at the Erlenbach stream has been continuously monitored with a PBIS array starting in 1986. The sensor array spans the width of an entire cross‐section and is mounted flush with the surface of a check dam immediately upstream of a sediment retention basin. We compare PBIS data with long‐term sedimentation records obtained from repeated surveys of material stored in the sediment retention basin, with artificial sediment input under controlled conditions in the field, and also with laboratory experiments. The rate of bedload transport is proportional to the number of impacts on the sensor per unit time. The reliability of the calibration relationship increases with the length of the observation period, e.g. for higher numbers of impacts and larger bedload volumes. Sediment volumes for individual flood events estimated with the PBIS method are in agreement with volumes estimated using an independent empirical method based on the effective runoff volume of water, the peak water discharge, and the critical discharge for the onset of sediment transport. Copyright © 2007 John Wiley & Sons, Ltd. 相似文献
7.
Jaime Guamán-Cabrera;Juan Carlos de la Llera; 《地震工程与结构动力学》2024,53(14):4248-4268
Hospital functionality relies not only on the building's structural robustness but also on the seismic performance of its Nonstructural elements, Systems, and Contents (NSC). The objective of this study is to characterize the earthquake-induced damage to the medical equipment deployed in the full-scale, five-story concrete building tested at the University of California, San Diego (UCSD) in 2012 when subjected to Design (DE) and Maximum Considered Earthquake (MCE) levels of demand with Fixed-to-the-Base (FB) support condition. The experimental equipment displacement responses are extracted using the Camera Projection Technique (CPT). Then, sophisticated rolling and sliding models, including instantaneous motion tracking and impact detection are developed to reproduce the equipment behavior obtained from CPT. It was found that CPT was capable of extracting the observed responses and identifying impacts despite the severity of the shaking as long as no significant uplift of the equipment occurred. In addition, both numerical models were capable of reproducing the equipment's displacement trajectories, rotations about the vertical axis (yaw), and impacts as long as no interlocking of the equipment's parts occurred. Moreover, a case study of a partially equipped Emergency Room (ER) was set up to demonstrate that even for low-intensity motions, the damage to equipment may be significant. Finally, the impact acceleration () is proposed as a proxy indicator of damage to medical equipment; however, more functionality tests accompanied by detailed pre- and post-inspections are needed to define robust damage limit states and performance objectives for medical equipment. 相似文献
8.
Vito Bacchi Alain Recking Nicolas Eckert Philippe Frey Guillaume Piton Mohamed Naaim 《地球表面变化过程与地形》2014,39(8):1075-1086
In poorly mobile static armour, sorting is usually considered the result of hiding/exposure effects. We called this effect ‘static sorting’ in opposition to very efficient grain‐to‐grain mechanisms produced by a mobile mixture, called ‘kinetic sorting’. We hypothesized that kinetic sorting can be an important contributor to the morphodynamics of mountain streams and attempted to demonstrate this with new flume experiments. Two long runs were produced with natural poorly sorted sediments, and with transport stages of the coarse fraction (defined by the ratio between the shear stress and the critical shear stress for transport), smaller and higher than 1, respectively. Both runs produced an efficient transfer downstream of the injected material, but with a major difference: the first run (no kinetic sorting) produced permanent armour figuring clusters, akin to what has already been observed in similar experiments; the second run (with kinetic sorting) also produced bed armouring, but this armour was periodically totally destroyed, leading to substantial bed erosion. This phenomenon was explained by kinetic sorting, the effects of which are to produce an efficient downward migration of fine materials and bed surface armouring. The consequence is that fine materials are hidden to the flow during aggradation, allowing the slope to attain values much steeper than would have been expected at equilibrium for the mixture. However, whereas the surface armouring tends to stabilize the bed, construction of a layer of fine sediments at the subsurface also contributes to making it very unstable. These two contradictory effects explain the complex bed behaviours and the existence of very large bedload and slope fluctuations. Copyright © 2014 John Wiley & Sons, Ltd. 相似文献
9.
In a flume experiment with steady flow conditions, H. A. Einstein recognised the transport of bedload particles as consisting of steps of rolling, sliding, or saltation with intermittent rest periods, and introduced the concept of an average, ‘virtual’ transport velocity. This virtual velocity then has also been derived from tracer studies in the field by dividing the travelled distance of a tracer by the duration of competent flow. As a consequence, the virtual velocity in the field is represented by one single value only, despite the unsteady flow variables. Tracer measurements in a river have not been yet used to express transport velocity as a direct function of these actual variables, and insights from tracer measurements into the processes of sediment transport remain limited. In particular, the unsteady conditions for bedload in the field have impeded the derivation of sediment transport characteristics as determined from laboratory experiments, as well as the transfer of laboratory insights to a field setting. We introduce a method of data regression for the derivation of an ‘unsteady’ virtual velocity from repeated surveys of tracer positions. The regression program called graVel (provided as supplementary material) relates the integral of an excess flow variable term to measured travel distances, yielding the most probable threshold value for entrainment and the coefficient of linear and non‐linear formulas. An extended regression allows additional fitting of the exponent in non‐linear formulas. Application to published tracer data from the Mameyes River, Puerto Rico, shows that the unsteady virtual velocity is more likely governed by non‐linear relations to excess Shields stress, similar to bedload transport, than by relations linking the particle velocity linearly to excess shear velocity. Partial agreements with non‐dimensional results derived from the larger, non‐wadeable Mur River encourage the establishment of a generalised formula for the unsteady virtual velocity. Copyright © 2017 John Wiley & Sons, Ltd. 相似文献
10.
Luca Mao Andrea Dell'Agnese Carolina Huincache Michal Engel Georg Niedrist Francesco Comiti 《地球表面变化过程与地形》2014,39(7):964-976
Sediment transport during flood events often reveals hysteretic patterns because flow discharge can peak before (counterclockwise hysteresis) or after (clockwise hysteresis) the peak of bedload. Hysteresis in sediment transport has been used in the literature to infer the degree of sediment availability. Counterclockwise and clockwise hysteresis have been in fact interpreted as limited and unlimited sediment supply conditions, respectively. Hysteresis has been mainly explored for the case of suspended sediment transport, but it was rarely reported for bedload transport in mountain streams. This work focuses on the temporal variability of bedload transport in an alpine catchment (Saldur basin, 18.6 km2, Italian Alps) where bedload transport was monitored by means of an acoustic pipe sensor which detects the acoustic vibrations induced by particles hitting a 0.5m‐long steel pipe. Runoff dynamics are dominated by snowmelt in late spring/early summer, mostly by glacier melt in late summer/early autumn, and by a combination of the snow and glacier melt in mid‐summer. The results indicate that hysteretic patterns during daily discharge fluctuations are predominantly clockwise during the snowmelt period, likely due to the ready availability of unpacked sediments within the channel or through bank erosion in the lower part of the basin. On the contrary, counterclockwise hysteresis tend to be more frequent during late glacier melting period, possibly due to the time lag needed for sediment provided by the glacial and peri‐glacial area to be transported to the monitoring section. However, intense rainfall events occurring during the glacier melt period generated predominantly clockwise hysteresis, thus indicating the activation of different sediment sources. These results indicate that runoff generation processes play a crucial role on sediment supply and temporal availability in mountain streams. Copyright © 2014 John Wiley & Sons, Ltd. 相似文献
11.
Bagnold developed his formula for bedload transport over several decades, with the final form of the relation given in his 1980 paper. In this formula, bedload transport rate is a function of stream power above some threshold value, depth and grain size. In 1986, he presented a graph which illustrated the strength of his relation. A double‐log graph of bedload transport rate, adjusted for depth and grain size, versus excess stream power was shown to collapse along a line having a slope of 1·5. However, Bagnold based his analyses on limited data. In this paper, the formula is re‐examined using a large data set in order to define the most consistent empirical representation, and dimensional analysis is performed to seek a rationalization of the formula. Functional analysis is performed for the final version of the equation defined by Bagnold to determine if the slope of 1·5 is preserved and to assess the strength of the relation. Finally, relations between excess stream power and bedload transport are examined for a fixed slope of 1·5 to assess the performance of various depth and grain size adjustment factors. The rational scaling is found to provide the best result. Copyright © 2000 John Wiley & Sons, Ltd. 相似文献
12.
Morphologic transport estimates available for a 65‐km stretch of Fraser River over the period 1952–1999 provide a unique opportunity to evaluate the performance of bedload transport formulae for a large river over decadal time scales. Formulae tested in this paper include the original and rational versions of the Bagnold formula, the Meyer‐Peter and Muller formula and a stream power correlation. The generalized approach adopted herein does not account for spatial variability in flow, bed structure and channel morphology. However, river managers and engineers, as well as those studying rivers within the context of long‐term landscape change, may find this approach satisfactory as it has minimal data requirements and provides a level of process specification that may be commensurable with longer time scales. Hydraulic geometry equations for width and depth are defined using morphologic maps based on aerial photography and bathymetric survey data. Comparison of transport predictions with bedload transport measurements completed at Mission indicates that the original Bagnold formula most closely approximates the main trends in the field data. Sensitivity analyses are conducted to evaluate the impact of inaccuracies in input variables width, depth, slope and grain size on transport predictions. The formulae differ in their sensitivity to input variables and between reaches. Average annual bedload transport predictions for the four formulae show that they vary between each other as well as from the morphologic transport estimates. The original Bagnold and Meyer‐Peter and Muller formulae provide the best transport predictions, although the former underestimates while the latter overestimates transport rates. Based on our findings, an error margin of up to an order of magnitude can be expected when adopting generalized approaches for the prediction of bedload transport. Copyright © 2005 John Wiley & Sons, Ltd. 相似文献
13.
Since the early 1990s, US Forest Service researchers have made thousands of bedload measurements in steep, coarse‐grained channels in Colorado and Wyoming, USA. In this paper we use data from 19 of those sites to characterize patterns and rates of coarse sediment transport for a range of channel types and sizes, including step–pool, plane‐bed, pool–riffle, and near‐braided channels. This effort builds upon previous work where we applied a piecewise regression model to (1) relate flow to rates of bedload transport and (2) define phases of transport in coarse‐grained channels. Earlier, the model was tested using bedload data from eight sites on the Fraser Experimental Forest near Fraser, Colorado. The analysis showed good application to those data and to data from four supplementary channels to which the procedure was applied. The earlier results were, however, derived from data collected at sites that, for the most part, have quite similar geology and runoff regimes. In this paper we evaluate further the application of piecewise regression to data from channels with a wider range of geomorphic conditions. The results corroborate with those from the earlier work in that there is a relatively narrow range of discharges at which a substantial change in the nature of bedload transport occurs. The transition from primarily low rates of sand transport (phase I) to higher rates of sand and coarse gravel transport (phase II) occurs, on average, at about 80 per cent of the bankfull (1·5‐year return interval) discharge. A comparison of grain sizes moved during the two phases showed that coarse gravel is rarely trapped in the samplers during phase I transport. Moreover, the movement and capture of the D16 to D25 grain size of the bed surface seems to correspond with the onset of phase II transport, particularly in systems with largely static channel surfaces. However, while there were many similarities in observed patterns of bedload transport at the 19 studied sites, each had its own ‘bedload signal’ in that the rate and size of materials transported largely reflected the nature of flow and sediment particular to that system. Published in 2005 by John Wiley & Sons, Ltd. 相似文献
14.
The collapse of soil pipes due to internal erosion can result in fully mature gullies. Few studies have measured the rates of sediment detachment and transport through soil pipes in situ. The objectives of this work were to determine suspended sediment concentration (SSC) in soil pipes as a function of pipeflow rate to develop sediment rating curves (SRC) and measure the bedload transport as a function of cumulative flow per storm event. H-flumes were installed in seven discontinuous gullies formed by pipe collapse and instrumented for pipe discharge measurements and suspended sediment sampling. The typical response to pipeflow was an initial flush of high concentration of suspended sediment followed by a decrease as pipeflow increased (rising limb of hydrograph). Pipeflows were often so dynamic that it was difficult to consistently capture the initial flush of sediment, resulting in weak to non-existent SRCs. The falling limb of the hydrograph tended to have a relatively low SSC. Thus, soil pipe SRCs tended to be better represented by hysteretic SRCs, although relationships between SSC and flow rate were poorly represented by SRCs. A power law equation given by SSC = aQb was adopted to represent the SRC relationships. Fitting this equation to data showed a correlation between the offset, a, and the slope, b, with the slope decreasing as the offset increases. Both SRC parameters (a and b) were correlated to the contributing area of the individual pipe. Bedload appeared to be an important contributor to sediment transport, with bedload – expressed as an average event sediment concentration (mg l−1) – decreasing as the volume of the event discharge (m3) increased. A significant portion (11–31%) of the bedload material was gravel and aggregates (>2 mm diameter material). While this work was the first to determine SRCs for soil pipes, refined sampling and measurement techniques are needed. © 2020 John Wiley & Sons, Ltd. 相似文献
15.
Daniel Vázquez-Tarrío Alain Recking Frédéric Liébault Michal Tal Rosana Menéndez-Duarte 《地球表面变化过程与地形》2019,44(1):112-128
Data from tracer experiments were compiled and analysed in order to explore the role of geomorphological, hydrological and sedimentological constraints on fluvial gravel transport in gravel-bed rivers. A large data set from 217 transport episodes of tagged stones were compiled from 33 scientific papers. Our analyses showed that while magnitude of peak discharge is a major control on gravel transport and mobility, tracer travel distances show some scale dependence on the morphological configuration of the channel. Our results also highlight differences in the way tracers are displaced between step–pool and riffle and pool channels. The riffle–pool sequence seems to be a more efficient trap for travelling gravels than the step–pool pair. In addition, in step–pool channels there are clear differences in tracer transport between observations of first displacements after tracer seeding (unconstrained-stone conditions), and second and subsequent observations of tracer displacements (constrained-stone conditions). The comparison between tracer experiments under constrained conditions and those under unconstrained conditions also highlights the importance of bed state and structures in gravel mobility. The results of this study confirm that sediment transport in gravel-bed rivers is a complex process, whereby sedimentological and geomorphological controls are superimposed on the hydraulic forcing. © 2018 John Wiley & Sons, Ltd. 相似文献
16.
17.
Marcel Liedermann Philipp Gmeiner Andrea Kreisler Michael Tritthart Helmut Habersack 《地球表面变化过程与地形》2018,43(2):514-523
A comprehensive monitoring programme focusing on bedload transport behaviour was conducted at a large gravel‐bed river. Innovative monitoring strategies were developed during five years of preconstruction observations accompanying a restoration project. A bedload basket sampler was used to perform 55 cross‐sectional measurements, which cover the entire water discharge spectrum from a 200‐year flood event in 2013 to a rare low flow event. The monitoring activities provide essential knowledge regarding bedload transport processes in large rivers. We have identified the initiation of motion under low flow conditions and a decrease in the rate of bedload discharge with increasing water discharge around bankfull conditions. Bedload flux strongly increases again during high flood events when the entire inundation area is flooded. No bedload hysteresis was observed. The effective discharge for bedload transport was determined to be near mean flow conditions, which is therefore at a lower flow discharge than expected. A numerical sediment transport model was able to reproduce the measured sediment transport patterns. The unique dataset enables the characterisation of bedload transport patterns in a large and regulated gravel‐bed river, evaluation of modern river engineering measures on the Danube, and, as a pilot project has recently been under construction, is able to address ongoing river bed incision, unsatisfactory ecological conditions for the adjacent national park and insufficient water depths for inland navigation. Copyright © 2017 John Wiley & Sons, Ltd. 相似文献
18.
Unsteady bedload transport was measured in two c. 5 m wide anabranches of a gravel‐bed braided stream draining the Haut Glacier d'Arolla, Switzerland, during the 1998 and 1999 melt seasons. Bedload was directly sampled using 152 mm square Helley–Smith type samplers deployed from a portable measuring bridge, and independent transport rate estimates for the coarser size fractions were obtained from the dispersion of magnetically tagged tracer pebbles. Bedload transport time series show pulsing behaviour under both marginal (1998) and partial (1999) transport regimes. There are generally weak correlations between transport rates and shear stresses determined from velocity data recorded at the measuring bridge. Characteristic parameters of the bedload grain‐size distributions (D50, D84) are weakly correlated with transport rates. Analysis of full bedload grain‐size distributions reveals greater structure, with a tendency for transport to become less size selective at higher transport rates. The bedload time series show autoregressive behaviour but are dif?cult to distinguish by this method. State–space plots, and associated measures of time‐series separation, reveal the structure of the time series more clearly. The measured pulses have distinctly different time‐series characteristics from those modelled using a one‐dimensional sediment routing model in which bed shear stress and grain size are varied randomly. These results suggest a mechanism of pulse generation based on irregular low‐amplitude bedforms, that may be generated in‐channel or may represent the advection of material supplied by bank erosion events. Copyright © 2003 John Wiley & Sons, Ltd. 相似文献
19.
The geomorphic effect of introducing a gravel augmentation totaling 520 m3 into a gravel‐bed stream during a dam‐controlled flood in May of 2015 was monitored with bedload transport measurements, an array of seismometers, and repeated topographic surveys. Half of the augmented gravel was injected into the flow with front‐end loaders on the rising limb of the flood and the other half was injected on the first day of the peak. Virtually all of the gravel transported past the injection point was deposited within about 7 to 10 channel widths of the injection point. Most of the injected gravel deposited along the left bank of the river whereas the right half of the channel bed was dominated by scour. The downstream third of the depositional area consisted of a small dune field that developed prior to the second gravel injection and subsequently migrated about one channel width downstream. A second depositional front was observed upstream from the gravel injection point, where a delta‐like wedge of bed material developed in the first hours of the flow release and changed little over the remainder of the release. These two depositional areas represent small‐scale bed‐material storage reservoirs with the potential to accumulate and periodically release packets of bed material. Interactions with such storage reservoirs are hypothesized to cause large bed‐material pulses to disperse by fragmenting into multiple smaller pulses. As a refinement to the conceptual model that views sediment pulse evolution in terms of dispersion and translation, the concept of pulse fragmentation has practical implications for gravel management. It implies that gravel augmentations can produce morphologic changes at locations that are separated from the augmentation point by arbitrarily long reaches, and it highlights the dependence of pulse propagation rates on the nature and distribution of the bed‐material storage reservoirs in the channel system. Copyright © 2017 John Wiley & Sons, Ltd. 相似文献
20.
Planimetric change was measured on daily hydrographs over two meltwater seasons using time-lapse images of the proglacial, gravel, braided, Sunwapta River, Canada. Significant planimetric change occurred on 10–15 days per year. Area of planimetric change correlated with peak and total daily meltwater hydrograph discharge. A clear threshold discharge can be identified below which no planform activity occurs, an intermediate range over which change occurs conditionally, and a peak flow range at which significant change always occurs. Field conditions were reproduced in a physical model in a laboratory flume. Photogrammetric DEMs of bed morphology and measurements of bedload output were made for each hydrograph experimental run. The physical model results for planimetric change had a threshold discharge for change, and trend with discharge, similar to the field data. The model data also show that planimetric change correlates strongly with volumes of erosion/deposition measured from successive DEMs, and with bedload transport rate. The relation between planimetric change and topographic change is also apparent from previous cross-section surveys at the field site. The results highlight the planimetric dynamics of braiding rivers in relation to discharge forcing, and the relationship between planimetric change, morphological change, and bedload transport in braided rivers. This also points to the potential use of measurements of planimetric change from time-lapse imagery as a low-cost method for high-frequency monitoring for braiding dynamics and also a surrogate for bedload transport measurement. © 2018 John Wiley & Sons, Ltd. 相似文献