共查询到7条相似文献,搜索用时 0 毫秒
1.
AbstractAn experimental study of the performance of concrete pipe piles during installation under different penetration speeds and static load tests on the piles in sand is presented. The applied jacking force, the amount of pile penetration, length of soil plug formed and ultimate bearing capacity were measured during the model tests. The results showed that the concrete pipe piles were partially plugged and the behavior of the soil plug was significantly affected by the penetration speed. The lower the penetration speed, the larger the soil plug formed which in turn leads to a greater ultimate bearing capacity. The size of soil plug can be evaluated by the m value defined as the ratio of the volume of the soil plug to that of the penetrated pile wall. The relationship between the m value and the penetration speeds can be used to estimate the amount of soil plug and the depth of penetration for an open-ended concrete pipe pile jacked into sand. 相似文献
2.
Liqiang Sun Yandi Wang Shuwang Yan Jian Chu Xiaoqiang Liu 《Marine Georesources & Geotechnology》2018,36(6):709-721
The super-long and large-diameter steel pipe piles are often adopted for the construction of offshore oil platforms in deep sea. One constructability issue related to driving heavy pipe piles is the pile running. The term pile running refers to the quick penetration of a pile into the seabed as a result of its high self-weight and low resistance from the seabed. The unexpected pile running can cause the steel wire of the hammer to break or even the loss of the hammer. A case study of pile running at an oil platform is introduced in this paper. A simplified theoretical method is proposed to explain the mechanisms of the pile running in this case. A factor of friction degradation is proposed to calculate the dynamic skin friction from the static ultimate skin friction of surrounding soil. The comparisons between the predictions to the case history show that the proposed simplified method can be used to predict the pile running condition. 相似文献
3.
通过对3根海上复杂地质条件下的大直径钢管桩采取高应变初打与不同休止时间复打相结合的试验方法,得到不同休止时间钢管桩承载力、侧阻力及端阻力大小,以此对不同桩侧土及持力层对钢管桩时效性的影响进行了研究。研究结果表明:1)钢管桩承载力时效性现象明显,且随时间增长迅速; 2)钢管桩侧阻力的恢复系数远大于端阻力; 3)桩侧黏性土强度的恢复是钢管桩侧阻力增加的主要原因; 4)砂土层虽提供的侧阻力较大,但其对侧阻力增长的贡献不如黏性土; 5)持力层越硬,端阻力与承载力的恢复性越差。 相似文献
4.
5.
A research on super-long piles has been primarily based on cast-in-place bored piles. In this article, field tests associated with selected measuring technologies were conducted on two super-long steel pipe piles in offshore areas to investigate the behaviors and performance of super-long steel pipe piles. The strain along the pile shaft was monitored by adopting the Brillouin optical time domain reflection and fiber Bragg grating techniques. Static load tests were also conducted on two test piles to determine the bearing capacities. In addition, the axial forces, relative displacements between piles and soils and pile shaft resistances were calculated based on the measured strain. According to the results of the static load tests, the ultimate bearing capacities of the two test piles are greater than 15,000 and 15,500 kN. Both of these values meet the design requirements. In addition, the two test piles can be treated as pure friction piles, and the load transfer mechanism and relationships between the pile shafts and relative displacements are also discussed. Finally, recommendations for practical engineering and significant conclusions are presented. 相似文献
6.
Jun Wang Zhi Zhou Hongtao Fu Yuanqiang Cai Xiuqing Hu 《Marine Georesources & Geotechnology》2013,31(7):870-879
AbstractLand reclamation has increased significantly in the eastern coastal areas of China. The increased exploitation of offshore resources has made cast-in-situ piles more preferable in these regions. However, precise prediction of axial forces and shaft resistances of piles is particularly difficult because geological conditions are complex after the foundation is treated by vacuum preloading. In this study, two groups of cast-in-situ piles, each of which consisted of two piles installed in soft soil in Oufei Project, Wenzhou, China, were compared by conducting tests using the slow static loading method to evaluate the influence of applying vacuum preloading to deal with soft soil foundation on the vertical bearing capacities of the piles. Two piles were located in an untreated area, while the other two were located in a vacuum preloading treating area. All the piles had the same length and diameter. In addition, the axial forces and shaft resistances of piles were calculated based on the measured strains. The field tests revealed that the ultimate bearing capacities and shaft resistances of test piles were significantly improved compared to those of the piles in untreated area. The experimental results presented in this study are expected to be highly beneficial for practical engineering. 相似文献
7.
江苏海岸辐射沙洲是江苏重要的海上风电规划区域,该海域的地层资料和试桩资料极为缺乏。通过钢管桩的现场静荷载试验,对江苏海岸辐射沙洲地层中大直径钢管桩基础承载性能进行研究,以揭示各地层的主要承载性能参数。试桩结果表明,江苏海岸辐射沙洲地层中钢管桩实际的轴向极限承载力明显小于高应变动测结果,只有高应变动测结果的79.09%。总侧摩擦阻力占总承载力的95.61%,而桩端阻力只占总承载力的4.39%。桩内土对管壁的侧摩阻力作用很小,主要是桩外土对管壁的侧摩阻力在发挥作用。辐射沙洲地层中粉土夹粉质黏土的承载性能一般,不适应作为钢管桩的持力层。轴向抗压静载试验得到的极限侧摩阻力高于静力触探的测试结果和API法的计算值。浅部砂层实际的极限水平土体抗力高于API法计算值,在水平荷载作用下上部砂层的p-y曲线具有明显软化效应,土体的软化效应在设计时需进行考虑。 相似文献