首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 531 毫秒
1.
In this study,the detention rate of detention pond was defined to include both reduction and delay of peak flow.Flood routing experiments,with various combinations of inflow hydrographs and outlet devices in an in-site detention pond,were performed to examine the effectiveness of two analysis methods,namely the simplified method and the hydrological routing method;and to compare the detention rate of two types of outlet,namely the rectangular sharp-crested weir and the rectangular orifice.Comparison between...  相似文献   

2.
The detention pond is one of the crucial items in detention facilities. It may effectively alleviate the occurrence of peak discharge, control the center of flood flow, and reduce the amount of soil loss. The objective of this study is analyzing the detention volume change of a detention pond with long-duration rainfall under the known isosceles trapezoidal inflow hydrograph model. The volume change of detention, which is under the influences of a givenisosceles trapezoidal inflow hydrograph and the extent of peak attenuation, is investigated by using the non-dimensional detention theory and the related mathematical analyses. The minimum detention volume of a detention pond can therefore be calculated based on the estimated of volume change of detention. The proposed detention volume estimation model can be used for the design of detention of facilities during the hillside development.  相似文献   

3.
1INTRODUCTIONDuetotiledecreaseoflandcoverandtheincreaseofwaterproofareasinurbandevelopment,itisclearthattherainwaterinfiltrationratewillreduceandtherunoft'volumewillincrease.Increasedrunoft'maycausetyequentfloodingandseveresedimentwashoutdownstream.Toavoidsuchadversedownstreameffects,storm-waterrunoft'andsedimentouttlowratemustbecontrolledusingdetentiontbcilitiesinInanynewcommunities.ThemainfunctionsofdetelltionpondsaretoreducepeakflowandcontrolthestreamlineandsedimentOutflowrate.Inperfo…  相似文献   

4.
The models of physiographic inundation and flood routing for channel network were used in this study to analyse the influence of the Tainan Scientific Base Industrial Park (TSBIP) and Feng-Hua detention ponds on the inundated potential, inundated volume, flood damage, and flood stage of peak flow along the Yen-Shui creek in 2-day flood for the 2-, 10- and 50-year return periods, respectively. The computed results show that the TSBIP detention ponds are able to reduce the inundated area and flood damage. However, the decrease in inundated area is not obvious for the 50-year return-period flood. Construction of the Feng-Hua detention pond resulted in a significant decrease in the flood stage along the Yen-Shui creek in the downstream reach. Moreover, the decrease in peak flow and lag of time-to-peak become increasingly evident in the downstream direction for the 2- and 10-year return-period events. For the 50-year return period, the lag of time-to-peak is not apparent, but the decrease in peak flow is still noticeable. In respect to the performance of detention ponds, the slopes of hydrographs in the rising and recession segments are smoother than those without detention ponds. Meanwhile, the shapes of peak become flatter if the detention ponds are installed. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

5.
Hydraulic engineering is usually based on theoretical analysis and/or numerical modelling simulation. As the dynamic behaviour of sediment movement under unsteady flow is still unclear, and field measurement is comparatively difficult during a large flood, prior investigations through flume experiments are required. A series of flume experiments, conducted using different inflow hydrographs without sediment supply from upstream, was carried out to investigate the sediment transport process under unsteady flow conditions. A series of triangular hydrographs were performed in the experiments. The results indicate that a temporal lag was found between the flow hydrograph peak and the sediment hydrograph peak because large size sand dunes lasted for a short period in the falling limb of the flow hydrograph. The temporal lag was found to be about equal to 6–15% of the flow hydrograph duration. Owing to the temporal lag, the total bedload yield in the rising period was less than that in the falling period. Furthermore, the measured total bedload yield in the unsteady flow experiments was larger than the predicted value, which was estimated by using the results obtained from the equivalent steady flow experiment. The peak bedload transport rate for unsteady flow conditions was also larger than the predicted value. The ratios of the measured to the predicted quantities mentioned above were found to be constant values for different shapes of hydrographs. It is, therefore, expected that the analytical results of sediment transport from equivalent steady flow can be a good reference for sediment transport under unsteady flow conditions. Copyright © 2004 John Wiley & Sons, Ltd.  相似文献   

6.
Detention basins are used to capture postdevelopment runoff and control the peak discharge of the outflow using orifices and weirs. The use of detention basins is typical practice in the construction of new developments on the fringe of existing urban areas, such as the Ulsan–Hwabong district in the city of Ulsan, South Korea. In this study, the required volume and flooding area of a detention basin was determined to control development outflow peaks for 2‐year, 10‐year, and 100‐year design storms with type II rainfall distributions as characterized by the US Department of Agriculture's Soil Conservation Service method. The rainfall–runoff simulation model used was the US Environmental Protection Agency's Storm Water Management Model (EPA‐SWMM) 5, which is the latest version of the software, updated for Windows. We designed three cases of detention basins multi‐staged by 2‐year, 10‐year, and 100‐year design storms and verified the designs with the application of 49 years (1961–2009) of hourly historical rainfall data. The three detention basin designs were compared in terms of the total construction and land costs as well as the benefits associated with recreational facilities or parking lot use. As a result, the design sizes of the detention basins are slightly greater than the actual sizes needed based on the historical rainfall application. Multi‐use detention basins (MDBs) based on 2‐year and 10‐year design storms were found to yield 37.4% and 22.8% benefits, respectively, for recreational facility use compared with detention basins without multi‐use space, and the results also indicate that benefits accrue after 6.5 years for parking lot use. The results of this study suggest that an MDB based on a 2‐year design storm is the most cost‐effective design among the three cases considered for Ulsan, South Korea. Copyright © 2012 John Wiley & Sons, Ltd.  相似文献   

7.
High resolution radar rainfall fields and a distributed hydrologic model are used to evaluate the sensitivity of flood and flash flood simulations to spatial aggregation of rainfall and soil properties at catchment scales ranging from 75 to 983 km2. Hydrologic modeling is based on a Hortonian infiltration model and a network-based representation of hillslope and channel flow. The investigation focuses on three extreme flood and flash flood events occurred on the Sesia river basin, North Western Italy, which are analysed by using four aggregation lengths ranging from 1 to 16 km. The influence of rainfall spatial aggregation is examined by using the flow distance as a spatial coordinate, hence emphasising the role of river network in the averaging of space–time rainfall. The effects of reduced and distorted rainfall spatial variability on peak discharge have been found particularly severe for the flash flood events, with peak errors up to 35% for rainfall aggregation of 16 km and at 983 km2 catchment size. Effects are particularly remarkable when significant structured rainfall variability combines with relatively important infiltration volumes due to dry initial conditions, as this emphasises the non-linear character of the rainfall–runoff relationship. In general, these results confirm that the correct estimate of rainfall volume is not enough for the accurate reproduction of flash flood events characterised by large and structured rainfall spatial variability, even at catchment scales around 250 km2. However, accurate rainfall volume estimation may suffice for less spatially variable flood events. Increasing the soil properties aggregation length exerts similar effects on peak discharge errors as increasing the rainfall aggregation length, for the cases considered here and after rescaling to preserve the rainfall volume. Moreover, peak discharge errors are roughly proportional to runoff volume errors, which indicates that the shape of the flood wave is influenced in a limited way by modifying the detail of the soil property spatial representation. Conversely, rainfall aggregation may exert a pronounced influence on the discharge peak by reshaping the spatial organisation of the runoff volumes and without a comparable impact on the runoff volumes.  相似文献   

8.
The cascading failure of multiple landslide dams can trigger a larger peak flood discharge than that caused by a single dam failure.Therefore,for an accurate numerical simulation,it is essential to elucidate the primary factors affecting the peak discharge of the flood caused by a cascading failure,which is the purpose of the current study.First,flume experiments were done on the cascading failure of two landslide dams under different upstream dam heights,downstream dam heights,and initial downstream reservoir water volumes.Then,the experimental results were reproduced using a numerical simulation model representing landslide dam erosion resulting from overtopping flow.Finally,the factors influencing the peak flood discharge caused by the cascading failure were analyzed using the numerical simulation model.Experimental results indicated that the inflow discharge into the downstream dam at the time when the downstream dam height began to rapidly erode was the main factor responsible for a cascading failure generating a larger peak flood discharge than that generated by a single dam failure.Furthermore,the results of a sensitivity analysis suggested that the upstream and downstream dam heights,initial water volume in the reservoir of the downstream dam,upstream and downstream dam crest lengths,and distance between two dams were among the most important factors in predicting the flood discharge caused by the cascading failure of multiple landslide dams.  相似文献   

9.
太湖流域水文数学模型   总被引:14,自引:4,他引:10  
本文针对太湖流域研制了全流域水文数学模型,该模型包括河流、湖泊模拟、边界条件模拟、降雨径流模拟、工程情况及控制运行方式模拟以及骨干河网中水流运动模拟五个方面。模型经1984、1985两年资料进行了上述五个方面的全面率定和检验,模拟结果与实测基本吻合。本模型全面通用,因此可以用来研究太湖流域洪水、枯水及调度等诸方面课题,本文简要地介绍应用该模型研究围垦的影响、规划工程的防洪效果及设计典型年选择三方面问题。  相似文献   

10.
Asymmetric copula in multivariate flood frequency analysis   总被引:2,自引:0,他引:2  
The univariate flood frequency analysis is widely used in hydrological studies. Often only flood peak or flood volume is statistically analyzed. For a more complete analysis the three main characteristics of a flood event i.e. peak, volume and duration are required. To fully understand these variables and their relationships, a multivariate statistical approach is necessary. The main aim of this paper is to define the trivariate probability density and cumulative distribution functions. When the joint distribution is known, it is possible to define the bivariate distribution of volume and duration conditioned on the peak discharge. Consequently volume–duration pairs, statistically linked to peak values, become available. The authors build trivariate joint distribution of flood event variables using the fully nested or asymmetric Archimedean copula functions. They describe properties of this copula class and perform extensive simulations to highlight differences with the well-known symmetric Archimedean copulas. They apply asymmetric distributions to observed flood data and compare the results those obtained using distributions built with symmetric copula and the standard Gumbel Logistic model.  相似文献   

11.
The rainfall–runoff process consists of an excess rainfall process and a runoff concentration process. A transient one-dimensional finite difference model describing the partitioning of precipitation between surface runoff, soil moisture storage and deep percolation, through the coupling of saturated–unsaturated zones, has been implemented in a geographical information system including data on vegetation cover derived from the Landsat Thematic Mapper. The model has been used to simulate both the rainfall excess and the resultant outflow hydrographs for a small arid zone drainage basin in the Andean region of Argentina. The overall hydrograph shape, peak discharge, runoff volume and flow duration are predicted within a relative squared error of 13.2%. The spatial input data and the model structure are discussed and suggestions for applications to larger complex basins and for future refinements in the technique are presented.  相似文献   

12.
Floods play a critical role in geomorphic change, but whether peak magnitude, duration, volume, or frequency determines the resulting magnitude of erosion and deposition is a question often proposed in geomorphic effectiveness studies. This study investigated that question using digital elevation model differencing to compare and contrast three hydrologically distinct epochs of topographic change spanning 18 years in the 37-km gravel–cobble lower Yuba River in northern California, USA. Scour and fill were analysed by volume at segment and geomorphic reach scales. Each epoch's hydrology was characterized using 15-min and daily averaged flow to obtain distinct peak and recurrence, duration, and volume metrics. Epochs 1 (1999–2008) and 3 (2014–2017) were wetter than average with large floods reaching 3206 and 2466 m3/s, respectively, though of different flood durations. Epoch 2 (2008–2014) was a drought period with only four brief moderate floods (peak of 1245 m3/s). Total volumetric changes showed that major geomorphic response occurred primarily during large flood events; however, total scour and net export of sediment varied greatly, with 20 times more export in epoch 3 compared to epoch 1. The key finding was that greater peak discharge was not correlated with greater net and total erosion; differences were better explained by duration and volume above floodway-filling stage. This finding highlights the importance of considering flood duration and volume, along with peak, to assess flood magnitude in the context of flood management, frequency analysis, and resulting geomorphic changes.  相似文献   

13.
In much of western United States destructive floods after wildfire are frequently caused by localized, short‐duration convective thunderstorms; however, little is known about post‐fire flooding from longer‐duration, low‐intensity mesoscale storms. In this study we estimate and compare peak flows from convective and mesoscale floods following the 2012 High Park Fire in the ungaged 15.5 km2 Skin Gulch basin in the northcentral Colorado Front Range. The convective storm on 6 July 2012 came just days after the wildfire was contained. Radar data indicated that the total rainfall was 20–47 mm, and the maximum rainfall intensities (upwards of 50 mm h?1) were concentrated over portions of the watershed that burned at high severity. The mesoscale storm on 9–15 September 2013 produced 220–240 mm of rain but had maximum 15‐min intensities of only 25–32 mm h?1. Peak flows for each flood were estimated using three independent techniques. Our best estimate using a 2D hydraulic model was 28 m3 s?1 km?2 for the flood following the convective storm, placing it among the largest rainfall‐runoff floods per unit area in the United States. In contrast, the flood associated with the mesoscale flood was only 6 m3 s?1 km?2, but the long‐duration flood caused extensive channel incision and widening, indicating that this storm was much more geomorphically effective. The peak flow estimates for the 2013 flood had a higher relative uncertainty and this stemmed from whether we used pre‐ or post‐flood channel topography. The results document the extent to which a high and moderate severity forest fire can greatly increase peak flows and alter channel morphology, illustrate how indirect peak flow estimates have larger errors than is generally assumed, and indicate that the magnitude of post‐fire floods and geomorphic change can be affected by the timing, magnitude, duration, and sequence of rainstorms. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

14.
The estimation of sub‐daily flows from daily flood flows is important for many hydrological and hydraulic applications. Flows during flood events often vary significantly within sub‐daily time‐scales, and failure to capture the sub‐daily flood characteristic can result in an underestimation of the instantaneous flood peaks, with possible risk of design failure. It is more common to find a longer record of daily flow series (observed or modelled using daily rainfall series) than sub‐daily flow data. This paper describes a novel approach, known as the steepness index unit volume flood hydrograph approach, for disaggregating daily flood flows into sub‐daily flows that takes advantage of the strong relationship between the standardized instantaneous flood peak and the standardized daily flood hydrograph rising‐limb steepness index. The strength of this relationship, which is considerably stronger than the relationship between the standardized flood peak and the event flood volume, is shown using data from six rivers flowing into the Gippsland Lakes in southeast Australia. The results indicate that the steepness index unit volume flood hydrograph approach can be used to disaggregate modelled daily flood flows satisfactorily, but its reliability is dependent on a model's ability to simulate the standardized daily flood hydrograph rising‐limb steepness index and the event flood volume. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

15.
A simulation experiment for optimal design hyetograph selection   总被引:1,自引:0,他引:1  
The aim of this work is to assess the accuracy of literature design hyetographs for the evaluation of peak discharges during flood events. Five design hyetographs are examined in a set of simulations, based upon the following steps: (i) an ideal river basin is defined, characterized by a Beta distribution shaped unit hydrograph (UH); (ii) 1000 years of synthetic rainfall are artificially generated; (iii) a discharge time‐series is obtained from the convolution of the rainfall time‐series and the UH, and the reference T‐years flood is computed from this series; (iv) for the same return period T, the parameters of the intensity–duration–frequency (IDF) curve are estimated from the 1000 years of synthetic rainfall; (v) five design hyetographs are determined from the IDF curves and are convolved with the discrete UH to find the corresponding design hydrographs; (vi) the hydrograph peaks are compared with the reference T‐years flood and the advantages and drawbacks of each of the five approaches are evaluated. The rainfall and UH parameters are varied, and the whole procedure is repeated to assess the sensitivity of results to the system configuration. We found that all design hyetographs produce flood peak estimates that are consistently biased in most of the climatic and hydrologic conditions considered. In particular, significant underestimation of the design flood results from the adoption of any rectangular hyetograph used in the context of the rational formula. In contrast, the Chicago hyetograph tends to overestimate peak flows. In two cases it is sufficient to multiply the result by a constant scaling factor to obtain robust and nearly unbiased estimates of the design floods. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

16.
针对降雨输入不确定性对实时洪水预报影响的问题,本文采用不考虑未来预报降雨、考虑未来预报降雨、考虑预报降雨的降雨量误差和降雨时间误差4种方法,以陕西省两个半湿润流域(陈河流域和大河坝流域)为研究区域,分析不同预见期和不同降雨输入情况下洪水预报的精度.研究表明:相对于不考虑未来降雨情况,考虑未来降雨后在预报预见期较长时对预报结果精度提升较大,在预见期较短时对预报结果精度提升不显著;暴雨中心位置不同对预报精度影响也不同,当暴雨中心位于流域下游时降雨量误差对流量预报误差影响更大;降雨量误差主要影响洪量相对误差和洪峰相对误差,且这种影响是线性的,对确定性系数的影响是非线性的二次函数,降雨时间误差主要影响峰现时间误差.  相似文献   

17.
The reliability of a procedure for investigation of flooding into an ungauged river reach close to an urban area is investigated. The approach is based on the application of a semi‐distributed rainfall–runoff model for a gauged basin, including the flood‐prone area, and that furnishes the inlet flow conditions for a two‐dimensional hydraulic model, whose computational domain is the urban area. The flood event, which occurred in October 1998 in the Upper Tiber river basin and caused significant damage in the town of Pieve S. Stefano, was used to test the approach. The built‐up area, often inundated, is included in the gauged basin of the Montedoglio dam (275 km2), for which the rainfall–runoff model was adapted and calibrated through three flood events without over‐bank flow. With the selected set of parameters, the hydrological model was found reasonably accurate in simulating the discharge hydrograph of the three events, whereas the flood event of October 1998 was simulated poorly, with an error in peak discharge and time to peak of −58% and 20%, respectively. This discrepancy was ascribed to the combined effect of the rainfall spatial variability and a partial obstruction of the bridge located in Pieve S. Stefano. In fact, taking account of the last hypothesis, the hydraulic model reproduced with a fair accuracy the observed flooded urban area. Moreover, incorporating into the hydrological model the flow resulting from a sudden cleaning of the obstruction, which was simulated by a ‘shock‐capturing’ one‐dimensional hydraulic model, the discharge hydrograph at the basin outlet was well represented if the rainfall was supposed to have occurred in the region near the main channel. This was simulated by reducing considerably the dynamic parameter, the lag time, of the instantaneous unit hydrograph for each homogeneous element into which the basin is divided. The error in peak discharge and time to peak decreased by a few percent. A sensitivity analysis of both the flooding volume involved in the shock wave and the lag time showed that this latter parameter requires a careful evaluation. Moreover, the analysis of the hydrograph peak prediction due to error in rainfall input showed that the error in peak discharge was lower than that of the same input error quantity. Therefore, the obtained results allowed us to support the hypothesis on the causes which triggered the complex event occurring in October 1998, and pointed out that the proposed procedure can be conveniently adopted for flood risk evaluation in ungauged river basins where a built‐up area is located. The need for a more detailed analysis regarding the processes of runoff generation and flood routing is also highlighted. Copyright © 2005 John Wiley & Sons, Ltd.  相似文献   

18.
1 INTRODUCTION Mountains higher than 100m occupy 63% of the land area in Taiwan. Serious flood disasters and muddy flows usually occur in the rainy season. To reduce the disasters from hillslope development, the government published the Norm of Soil and Water Conservation Treatment (NSWCT) in 1994. One of the most important treatments is that detention ponds and grit chambers are essential facilities for reducing increased peak flow disasters and sediment yield. 309 volumes on soil…  相似文献   

19.
Lei Wang  Jaehyung Yu 《水文研究》2012,26(19):2973-2984
The construction of stormwater detention basins is a best management practice to effectively control floods, to provide additional surface storage for excess floodwater and to compensate for the adverse effects of urban development. Traditional field‐based levelling survey methods are very time consuming and subject to human‐induced arbitrariness and error. This article presents an approach to modelling detention basins measured from light detection and ranging remote sensing data. A case study is illustrated by using the White Oak Bayou watershed of Harris County, Texas. The storage–stage curve obtained from the volumetric analysis is used in a modified detention basins routing model, which was developed by adding the weir structure control to the traditional hydrologic reservoir routing equations. The model simulation showed that the peak flow of the synthetic 100‐year reoccurrence event was effectively reduced and delayed by the detention basins. The comparison with the simulation results from the traditional reservoir routing model suggested that previous studies using the reservoir routing model were likely to underestimate the flood reduction effect of detention basins. The sensitivity analysis of the parameters showed that the detention basin design and evaluation should pay more attention on the weir height and river channel's roughness. Copyright © 2011 John Wiley & Sons, Ltd.  相似文献   

20.
Runoff and sediment were measured from agricultural land exposed to controlled simulated rainfall. We extended the kinematic unsteady overland sedimentation theory of prismatic channels to the experiments by considering both hydraulics and sediment dynamics of rill flow for changing flow geometries of nonuniform and unsteady rill development. The characteristic unimodal concentration peak observed in the experiments and the changing channel geometry were interpreted in theoretical terms. Overland sedimentation in unsteady nonprismatic rills under uniform rainfall can be described with kinematic models of flow, entrainment and deposition applied to developing flow geometries; this is not possible with sheet-flow models. Other interpretations are considered and experimental needs are identified.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号