首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
This paper presents a three-dimensional (3-D) numerical model to simulate morphological changes in alluvial channels due to bank erosion. A method for the simulation of bank erosion is established. This is incorporated into a 3-D mathematical model for turbulent flow and non-uniform, non-equilibrium sediment transport. This model is applied to simulate morphological changes in the Shishou bend of the middle Yangtze River in China, where serious bank erosions occurred during the last two decades. The double-layer sediment structure of the riverbank on the middle Yangtze River is taken into account in the bank erosion module. Both cohesive and non-cohesive bank material in the different layers are considered. The bank erosion module also includes other factors affecting the rate of bank erosion, such as the longitudinal length of failed bank, the thickness of each layer in the double-layer structure, and the erosion-resisting effect of cohesive material from the top layer of failed bank. A locally-adaptive grid system is proposed to efficiently simulate the lateral migration of alluvial channel due to bank erosion. The predictive capability of the 3-D model is examined by laboratory data. Simulated processes of bank erosion agree with field observations in the Shishou bend during the period of October 1996–October 1998, and the bank erosion module plays a significant role in simulating morphological changes of the study reach. In addition, the equivalent channel-forming discharge, which is defined as a constant discharge that can create the same amount of bank erosion in an alluvial channel as that created by natural runoff processes during the same period of time, is proposed to improve calculation efficiency for feasibility studies.  相似文献   

2.
《国际泥沙研究》2016,(2):131-138
Lateral migration is an important form of morphological changes on the Middle Yangtze River (MYR), particularly for the lower Jingjiang reach. The Three Gorges Reservoir (TGR) has substantially reduced sediment supply to the downstream river channels since its impoundment in June 2003. The scientific understanding of how decrease of sediment influences the processes of bank erosion and channel adjustments is complex and limited. In the present paper, the morphological responses in a typical meandering and island-braided river segment of the MYR to the filling of the TGR were investigated by a 3-D morphodynamic model. The potential of the 3-D model has been demonstrated by the observed data. The morphological evolutions in the Shishou bend during the first 12 years of the TGR impound-ment were predicted. The effects of the TGR operation on the planform evolutions in the study reach were analyzed based on the simulated results. Sediment load is decreased by 75%due to the early filling of the TGR. The magnitude of bed degradation with less sediment load due to the TGR operation is increased compared with the pre-dam situation. Qualitatively, the overall planform evolution trends in the Shishou bend after the TGR operation are similar to that without the TGR operation. The magnitude of lateral migration has been increased in some part of the channel bend, where the morphological response of the TGR operation exhibits more lateral migration rather than vertical degradation. Scouring at the bank toe enhances bank failure. Decrease of sediment load and weak bank anti-scour ability as well as the significant helical flow can be responsible for intensified bank erosion in the channel bend.  相似文献   

3.
Stochastic erosion of composite banks in alluvial river bends   总被引:2,自引:0,他引:2       下载免费PDF全文
The erosion of composite river banks is a complex process involving a number of factors including fluvial erosion, seepage erosion, and cantilever mass failure. To predict the rate of bank erosion with these complexities, a stochastic bank erosion model is suitable to define the probability distribution of the controlling variables. In this study, a bank erosion model in a river bend is developed by coupling several bank erosion processes with an existing hydrodynamic and morphological model. The soil erodibility of cohesive bank layers was measured using a submerged jet test apparatus. Seasonal bank erosion rates for four consecutive years at a bend in the Brahmaputra River, India, were measured by repeated bankline surveys. The ability of the model to predict erosion was evaluated in the river bend that displayed active bank erosion. In this study, different monsoon conditions and the distribution functions of two variables were considered in estimating the stochastic bank erosion rate: the probability of the soil erodibility and stochastic stage hydrographs for the nth return period river stage. Additionally, the influences of the deflection angle of the streamflow, longitudinal slope of river channel, and bed material size on bank erosion rate were also investigated. The obtained stochastic erosion predictions were compared with the observed distribution of the annual‐average bank erosion rate of 45 river bends in the Brahmaputra River. The developed model appropriately predicted the short‐term morphological dynamics of sand‐bed river bends with composite banks. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

4.
The helical flow significantly affects the flow, sediment transport and morphological evolution in curved channels. A semi-empirical formula is proposed to determine the cross-stream distribution of the helical flow intensity in the developed regions of a channel bend. It is then used to evaluate the dispersion terms in the depth-averaged 2-D momentum equations and suspended-load transport equation as well as the bed-load transport angle, thus enhancing the depth-averaged 2-D model to account for the effect of helical flow. The tests in several experimental and field cases show that the enhanced depth-averaged 2-D model can much more reasonably predict the shifting of main flow from inner bank to outer bank, the erosion along outer bank and deposition along inner bank than the depth-averaged 2-D model without considering this effect.  相似文献   

5.
l INTRODUCTIONTo ensure the long-term futhe of dams, the emPtying of storage reservoirs is often realised with tWoobjectives:'-periodic insPection of the sttucthe,-flushing oftalrials Which sedimatd within the reservoir.Both aims are lthely to cause the instability of sedhoent, and these displacements can induceenvirOInnenal distheances that have to be reduced to the Ininimum. This imPlies a good knowledge ofthese maerials and of the processes Which originated the disPlacements.The se…  相似文献   

6.
We present a geotechnical stability analysis for the planar failure of riverbanks, which incorporates the effects of root reinforcement and surcharge for mature stands of woody riparian vegetation. The analysis relies on a new method of representing the root distribution in the soil, which evaluates the effects of the vegetation's position on the bank. The model is used in a series of sensitivity analyses performed for a wide range of bank morphological (bank slope and height) and sedimentological (bank cohesion and friction angle) conditions, enabling discrimination of the types of bank environment for which vegetation has an effect on bank stability. The results indicate that woody vegetation elements have a maximal impact on bank stability when they are located at the ends of the incipient failure plane (i.e. at the bank toe or at the intersection of the failure plane with the floodplain) and that vegetation has a greater effect on net bank stability when it is growing on low, shallow, banks comprised of weakly cohesive sediments. However, the magnitude of these effects is limited, with vegetation typically inducing changes (relative to non‐vegetated banks) in simulated factors of safety of less than 5%. If correct, this suggests that the well documented effects of vegetation on channel morphology must be related to alternative process mechanisms (such as the interaction of vegetation with river flows) rather than the mechanical effects of vegetation on bank failure, except in special cases where the equivalent non‐vegetated bank has a highly marginal stability status. Copyright © 2007 John Wiley & Sons, Ltd.  相似文献   

7.
Recognizing the underlying mechanisms of bank storage and return flow is important for understanding streamflow hydrographs. Analytical models have been widely used to estimate the impacts of bank storage, but are often based on assumptions of conditions that are rarely found in the field, such as vertical river banks and saturated flow. Numerical simulations of bank storage and return flow in river-aquifer cross sections with vertical and sloping banks were undertaken using a fully-coupled, surface-subsurface flow model. Sloping river banks were found to increase the bank infiltration rates by 98% and storage volume by 40% for a bank slope of 3.4° from horizontal, and for a slope of 8.5°, delay bank return flow by more than four times compared with vertical river banks and saturated flow. The results suggested that conventional analytical approximations cannot adequately be used to quantify bank storage when bank slope is less than 60° from horizontal. Additionally, in the unconfined aquifers modeled, the analytical solutions did not accurately model bank storage and return flow even in rivers with vertical banks due to a violation of the dupuit assumption. Bank storage and return flow were also modeled for more realistic cross sections and river hydrograph from the Fitzroy River, Western Australia, to indicate the importance of accurately modeling sloping river banks at a field scale. Following a single wet season flood event of 12 m, results showed that it may take over 3.5 years for 50% of the bank storage volume to return to the river.  相似文献   

8.
In recent years, a large number of bank destruction occur in the reservoir area under the effect of water fluctuation, which may be lead to reservoir accumulative landslide geological hazards finally. The paper conducted the bank destruction forecasting study for accumulative landslides in the Three Gorges Reservoir Region, China utilizing back-propagation (BP) neural network approach. A representative scenario of Jinle landslide is then taken for analysis purposes. On the basis of the existing data sets of bank destruction cases, the BP neural network forecasting model and the corresponding programs for bank destruction are both presented, whose forecasting result is validated by two independent approaches, namely empirical method and numerical modeling method. Furthermore, the BP neural network model had obvious advantages over the convention approaches in the aspects of the fast calculation speed and high convenience. According to the bank destruction forecasting scale presented above, the corresponding revetment measures can be proposed to prevent the occurring of the bank destruction, whose effectiveness has been further validated by the actual engineering practice.  相似文献   

9.
This paper examines the use of terrestrial photogrammetry as a technique for measuring bank erosion in a rapidly changing fluvial environment. It has been recognized that there are a number of advantages when applying photogrammetric techniques to geomorphological situations. In this study the enhancement of spatial sampling combined with the ability to capture additional information, such as soil moisture, on film, is of particular importance in enabling the identification of specific processes involved in bank erosion as well as detailed volumetric analysis of losses. Metric terrestrial photography was taken of the river bank on several dates, and data were abstracted by the use of analytical photogrammetry. This enabled the generation of digital terrain models from which morphological and volumetric changes could be assessed. © 1997 John Wiley & Sons, Ltd.  相似文献   

10.
Eutrophication of aquatic ecosystems is one of the most pressing water quality concerns in the United States and around the world. Bank erosion has been largely overlooked as a source of nutrient loading, despite field studies demonstrating that this source can account for the majority of the total phosphorus load in a watershed. Substantial effort has been made to develop mechanistic models to predict bank erosion and instability in stream systems; however, these models do not account for inherent natural variability in input values. To quantify the impacts of this omission, uncertainty and sensitivity analyses were performed on the Bank Stability and Toe Erosion Model (BSTEM), a mechanistic model developed by the US Department of Agriculture – Agricultural Research Service (USDA‐ARS) that simulates both mass wasting and fluvial erosion of streambanks. Generally, bank height, soil cohesion, and plant species were found to be most influential in determining stability of clay (cohesive) banks. In addition to these three inputs, groundwater elevation, stream stage, and bank angle were also identified as important in sand (non‐cohesive) banks. Slope and bank height are the dominant variables in fluvial erosion modeling, while erodibility and critical shear stress had low sensitivity indices; however, these indices do not reflect the importance of critical shear stress in determining the timing of erosion events. These results identify important variables that should be the focus of data collection efforts while also indicating which less influential variables may be set to assumed values. In addition, a probabilistic Monte‐Carlo modeling approach was applied to data from a watershed‐scale sediment and phosphorus loading study on the Missisquoi River, Vermont to quantify uncertainty associated with these published results. While our estimates aligned well with previous deterministic modeling results, the uncertainty associated with these predictions suggests that they should be considered order of magnitude estimates only. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

11.
Krylenko  I.  Belikov  V.  Fingert  E.  Golovlyov  P.  Glotko  A.  Zavadskii  A.  Samokhin  M.  Borovkov  S. 《Water Resources》2018,45(1):112-121
Water flow and sediment transport under the effect of hydrotechnical constructions on the Amur River near Blagoveshchensk and Heihe cities was analyzed based on two-dimensional hydrodynamic modeling using STREAM_2D software (the authors V. Belikov et al., Russia). Three modeling scenarios were considered: without constructions, with the embankment of Blagoveshchensk, with the embankment of Blagoveshchensk and a system of dams near the Chinese island of Big Heihe. Modeling results have shown that the embankment has only a local effect on the part of the Amur R. upstream from confluence with the Zeya R. The construction of dams in the side channels near the island of Big Heihe can lead to significant flow redistribution, providing the flow concentration in the main river channel and reduction of the water flow, entering the island system. An increase in erosion in the main channel downstream of the confluence near the left bank and a simultaneous increase in accumulation near the right bank of the Amur R. below the island system can take place as the result of side channels shutting by dams from the right bank.  相似文献   

12.
Over‐bank flooding is one of the driving forces controlling ecological integrity of riparian wetlands. Indentifying natural over‐bank flooding regime and its temporal variations is crucial for developing conservation and restoration plans and making water resources management policies for these ecosystems. Along the midstream of the Wei River in Xi'an, China lies the Jingwei riparian wetland, which was well preserved until the 1970s. Based on historical record of hydrological and morphological data of the Wei River from 1951 to 2000, we analysed temporal variations of over‐bank flooding frequency, duration, and timing in this paper. The natural annual over‐bank flooding regime was identified as having an occurrence frequency of 2·2 times a year and average duration of 5·3 days; these flooding events typically occur between June and September with occasional occurrence in late spring and late autumn. Over‐bank flooding occurrence frequency and duration decreased significantly during the 1990s, seasonal events of over‐bank floods were changed through reduced flooding frequency during summer and disappearing flooding events in late spring and late autumn. Further investigations showed that reduced discharge in the Wei River was the principal cause for these changes in over‐bank flooding dynamics. Our analysis also showed that decreased discharge of the Wei River during the 1990s was attributed near equally to disturbances from human activities and decreased regional precipitation. Results from this study may help reestablish natural over‐bank flooding dynamics in order to ensure successful restoration of Jingwei riparian wetland. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

13.
Seepage erosion in layered stream bank material   总被引:1,自引:0,他引:1  
Current stream restoration practices often require anthropogenic manipulation of natural field soils to reconstruct stream banks in the absence of stabilizing vegetation. For this study, researchers conducted laboratory experiments on reconstructed, non‐vegetated stream banks with layered soils experiencing seepage. The objective of the study was to determine the effect of seepage, pore water pressure, and bank geometry on erosion and bank stability of layered streambanks. The experimental design consisted of an intermediate‐size soil lysimeter packed with a sandy clay loam top soil and an underlying fine sand layer at three bank slopes (90°, 45° and 26°). Shallow groundwater flow and seepage resulted in bank failure of geometrically stable banks. Pop out failures, liquid deformation, and piping were all observed failure mechanisms in the underlying sand material, dependent on the bank angle. Groundwater seepage processes created small‐scale failures of the underlying sand leading to larger‐scale failures of the overlying sandy clay loam. The underlying sand layer eroded according to the initial bank angle and change in overburden loading. The overlying loam layer failed along linear failure planes. The gradually sloped bank (i.e. 26° slope) failed faster, hypothesized to be due to less confining pressure and greater vertical seepage forces. Researchers analyzed the laboratory experiments using the Bank Stability and Toe Erosion Model, version 4·1. The model calculated an accurate shear surface angle similar to the failure angle observed in the lysimeter tests. The model predicted failure only for the undercut 90° bank slope, and indicated stable conditions for the other geometries. Steeper initial bank slopes and undercut banks decreased the bank factor of safety. The observed failure mechanisms and measured saturation data indicated an interaction between overburden pressure, seepage forces, and bank slope on bank stability. Future bank stability modeling would benefit by incorporating lateral seepage erosion and soil liquefaction prediction calculations. Copyright © 2009 John Wiley & Sons, Ltd.  相似文献   

14.
A 2D depth-averaged model for hydrodynamic,sediment transport and river morphological adjustment is presented.The sediment transport submodel considers non-uniform sediment,bed surface armoring,impact of secondary flow on the direction of bed-load transport,and transverse slope of river bed.The bank erosion submodel incorporates a simple simulation method for updating bank geometry during either degradational or aggradational bed evolution.The model is applied to a 180°bend with a constant radius under unsteady flow conditions,and to Friedkin’s laboratory meander channels.The results are in acceptable agreement with measurements,confirming the two dimensional model’s potential in predicting the formation of river meandering and improving understanding of patterning processes.Future researches are needed to clarify some simplifications and limitations of the model.  相似文献   

15.
The interplay between streamwise flow,curvature-induced secondary flow,sediment transport and bed morphology leads to the formation of a typical bar-pool bed morphology in open-channel bends.The associated scour at the outer bank and deposition at the inner bank may endanger the outer bank’s stability or reduce the navigable width of the channel.Previous preliminary laboratory experiments in a sharply curved flume with a fixed horizontal bed have shown that a bubble screen located near the outer bank can generate an additional secondary flow located between the outer bank and the curvature-induced secondary flow and with a sense of rotation opposite to the latter.This bubble-induced secondary flow redistributes velocities and bed shear stresses.The reported study investigates the implications of a bubble screen on the flow and the morphology in configurations with mobile bed.Velocity measurements show that the bubble-induced secondary flow shifts the curvature-induced secondary flow in inwards direction and reduces its strength.The bubble screen considerably reduces morphological gradients.Maximum bend scour is reduced by about 50%and occurs further away from the outer bank where it does not endanger the bank stability anymore.The location of maximum scour coincides with the junction of the curvature-induced and bubble-induced secondary flows.At this same location,the maximum streamwise velocities and maximum vertical velocities impinging on the bed also occur,which indicates their importance with respect to the formation of bend scour.The bubble screen also substantially reduced deposition at the inner bank.These preliminary experiments show the potential of a bubble screen to influence and modify the bed morphology.  相似文献   

16.
The relation between morphological change and patterns of variation in bedload transport rate in braided streams was observed by repeated, daily topographic surveys over a 25 day study period in a 60 m reach of the proglacial Sunwapta River, Alberta, Canada. There are two major periods of morphological change, each lasting several days and each involving the complete destruction and reconstruction of bar complexes. Bar complex destruction was caused by redirection of the flow and by downstream extension of the confluence scour zone upstream. Reconstruction involved accretion of unit bars on bar head, flank and tail and in one case was initiated by disection of a large, lobate unit bar. High rates of sediment movement, measured from net scour and fill of the cross-sections, coincided with these morphological changes. Sediment was supplied from both bed and bank erosion, and patterns and distances of transfer were highly variable. Rates of transport estimated by matching upstream erosional volumes with downstream deposition were much greater than those estimated from either a step-length approach or a sediment budget. Measurements of scour and fill and observations of morphological change indicate that step lengths (virtual transport distances) were typically 40–100m during a diurnal discharge cycle. Shorter step lengths occurred when transfer was confined to a single anabranch and longer steps involved channel changes at the scale of the entire reach. Sediment budgeting was used to describe the spatial patterns of sediment transport associated with the morphological changes and to estimate minimum daily reach-averaged transport rates. Mean bedload transport rates correlate with discharge, but with considerable scatter. The largest deviations from the mean relation can be tied to phases of channel incision, bank erosion, scour hole migration, bar deposition and channel filling apparently controlled by changes and fluctuations in sediment supply from upstream, independent of discharge. These are interpreted as field evidence of ‘autopulses’ or ‘macropulses’ in bedload transport, previously observed only in laboratory models of braided streams.  相似文献   

17.
Study of hydraulic structures such as groins and bandal-like structures can provide valuable information on their influences on morphological processes in natural rivers.These structures usually used for bank protection and formation of deep navigation channel can locally create complex flow patterns,reduce flow velocities and also increase the flood levels.Most of the previous studies are focused on structures like groins under non-submerged flow condition.However,the recent demand of nature friendly low cost and sustainable methods for river bank protection and channel formation leads to the necessity of study different type of structures like bandal-like structures.In this context, this study investigates the flow characteristics and sediment transport process influenced by bandal-like structures through laboratory experiments.The experiments were carried out under live-bed scour condition with sediment supplied from the inlet for two submergence(non-submerged and submerged)conditions.The experimental measurements contribute to better understand the mechanism of deposition/erosion process around different type of hydraulic structures.The performance of bandal-like structures considering the erosion around the structures,the deposition near the bank and the formation of deep main channel show promising results compared with conventional structures such as groins(impermeable and permeable ones).  相似文献   

18.
Shore protection in lakes is an issue of major importance in Switzerland where several big lakes in plains suffer from a pronounced bank erosion. For the moment, in shallow lakes, soft and biotechnical protection measures proved their reliability. Unfortunately, the scientific basis for the design of such techniques does not exist in some cases or not appropriate enough in order to have an optimized effect. Therefore, the aim of an on-going research project is to study, on the basis of physical and numerical modeling, the impact of such measures on the shores regarding bank erosion, and to establish the main basis for their dimensioning. A 2-D numerical model was used to simulate the eroded beach of Préverenges on the North coast of Lake Geneva. Hence, this case study allowed a better understanding of the numerical capacities of the program by modelling wave effect on bedload sediment transport and shore erosion as well as wind role in the generation of littoral currents.  相似文献   

19.
Artificially straight river channels tend to be unstable, and ultimately develop into river meanders through bank erosion and point‐bar deposition. In this paper account is taken of the effects of riparian and floodplain vegetation on bank strength, floodplain flow resistance, shear stress partitioning, and bedload transport. This is incorporated into an existing 2D hydrodynamic‐morphological model. By applying the new model to an initially straight and single‐threaded channel, the way that its planform and cross‐sectional geometry evolve for different hydraulic and floodplain vegetation conditions is demonstrated. The results show the formation and upstream migration of gravel bars, confluence scouring and the development of meandering and braiding channel patterns. In cases where the channel becomes unstable, the instability grows out of bar formation. The resulting braiding patterns are similar to analytical results. The formation of a transition configuration requires a strong influence from vegetation. Copyright © 2010 John Wiley & Sons, Ltd.  相似文献   

20.
The present work explores relations between stream power,braiding intensities and bank erosion in certain stretches of the Brahmaputra River.In this paper,an objective approach is presented to enable quantitative assessment of spatio-temporal behaviour of channel braiding process of the Brahmaputra River by using the Plan Form Index and corresponding estimation of stream power to establish a behavioural pattern of variability of potential energy expenditure.The braiding index is compared for discrete years to understand the morphological behaviour.Subsequently,a real time estimation of stream power for certain stretches of Brahmaputra River is done in order to analyse its variability in braiding intensity and bank erosion.The paper presents the dynamic behaviour of the channel pattern of the Brahmaputra River System in Assam valley of India over a time span of 18 years.The procedure addresses the selection of input parameters from digital satellite images,comprising scenes for the years 1990,1997 and 2007 with specific dates,from Dhubri near Indo-Bangladesh Border to Upper Assam.Deployment of GIS technique has been made to extract the required parameters to derive Plan Form Indices for the entire study reach.Stream power estimation is done for corresponding latest floods and for corresponding dates of image scenes.The study indicated that due to consistent aggradation of riverbed inducing temporal declination of stream power,there is an occurrence of wide spread braiding.This in turn incurs substantial yearly land loss due to bank erosion,caused by flow concentrations due to temporal evolution of multiple channels in the Brahmaputra River.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号