首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
Rivers flowing from glacier-clad Quaternary volcanoes in southwestern British Columbia have high sediment loads and anabranching and braided planforms. Their floodplains aggrade in response to recurrent large landslides on the volcanoes and to advance of glaciers during periods of climate cooling. In this paper, we document channel instability and aggradation during the last 200 years in lower Cheakamus River valley. Cheakamus River derives much of its flow and nearly all of its sediment from the Mount Garibaldi massif, which includes a number of volcanic centres dominated by Mount Garibaldi volcano. Stratigraphic analysis and radiocarbon and dendrochronological dating of recent floodplain sediments at North Vancouver Outdoor School in Cheakamus Valley show that Cheakamus River aggraded its floodplain about 1–2 m and buried a valley-floor forest in the early or mid 1800s. The aggradation was probably caused by a large (ca. 15–25×106 m3) landslide from the flank of Mount Garibaldi, 15 km north of our study site, in 1855 or 1856. Examination of historical aerial photographs dating back to 1947 indicates that channel instability triggered by this event persisted until the river was dyked in the late 1950s. Our observations are consistent with data from many other mountain areas that suggest rivers with large, but highly variable sediment loads may rapidly aggrade their floodplains following a large spike in sediment supply. Channel instability may persist for decades to centuries after the triggering event.  相似文献   

2.
At the beginning of December 2003, one of the biggest floods for at least 150 yr was recorded on the Rhone River. In the lower part of the river, the peak flood reached 11,000 m3 s−1. The geomorphological and radioecological consequences of such an event were investigated downstream all the nuclear installations by using measured and calculated fluxes and the total export of suspended sediment and associated 137Cs. Results pointed out the major role played by large floods in the annual suspended sediment load, as 3.70 × 106 tons of silts, 0.85 × 106 tons of sands, and 0.84 × 106 tons of clays were transferred towards the coastal environment. Nevertheless, these solid loads were found to be lower than those expected as regards the liquid discharge reached during this event and suggested that previous floods that occurred on the river and on its main tributaries during the last decade have probably led to the removal of available sediment from the channels and their banks. Besides, the 137Cs activity measured within the suspended load was estimated at 14.9 ± 0.4 Bq kg−1, which is a level characteristic of the suspended sediments from the Rhone catchment area and demonstrated that nuclear installations located along the Rhone valley did not significantly contribute to any increase in 137Cs activity in the water during the flood. The total 137Cs particulate export amounted to 77 ± 17 GBq and was mainly associated with the silt fraction that contributes to around 70% of the total 137Cs export.  相似文献   

3.
At the reach scale, a channel adjusts to sediment supply and flow through mutual interactions among channel form, bed particle size, and flow dynamics that govern river bed mobility. Sediment can impair the beneficial uses of a river, but the timescales for studying recovery following high sediment loading in the field setting make flume experiments appealing. We use a flume experiment, coupled with field measurements in a gravel-bed river, to explore sediment transport, storage, and mobility relations under various sediment supply conditions. Our flume experiment modeled adjustments of channel morphology, slope, and armoring in a gravel-bed channel. Under moderate sediment increases, channel bed elevation increased and sediment output increased, but channel planform remained similar to pre-feed conditions. During the following degradational cycle, most of the excess sediment was evacuated from the flume and the bed became armored. Under high sediment feed, channel bed elevation increased, the bed became smoother, mid-channel bars and bedload sheets formed, and water surface slope increased. Concurrently, output increased and became more poorly sorted. During the last degradational cycle, the channel became armored and channel incision ceased before all excess sediment was removed. Selective transport of finer material was evident throughout the aggradational cycles and became more pronounced during degradational cycles as the bed became armored. Our flume results of changes in bed elevation, sediment storage, channel morphology, and bed texture parallel those from field surveys of Redwood Creek, northern California, which has exhibited channel bed degradation for 30 years following a large aggradation event in the 1970s. The flume experiment suggested that channel recovery in terms of reestablishing a specific morphology may not occur, but the channel may return to a state of balancing sediment supply and transport capacity.  相似文献   

4.
Sediment rating parameters and their implications: Yangtze River, China   总被引:4,自引:0,他引:4  
This study examines the characteristics of sediment rating parameters recorded at various gauging stations in the Yangtze Basin in relation to their controls. Our findings indicate that the parameters are associated with river channel morphology of the selected reaches. High b-values (> 1.600) and low log(a) values (< − 4.000) occur in the upper course of the steep rock-confined river, characterizing high unit stream power flows. Low b-values (< 0.900) and high log(a) values (> − 1.000) occur in the middle and lower Yangtze River associated with meandering reaches over low gradients, and can be taken to imply aggradation in these reaches with low stream power. Higher b-values (0.900–1.600) and lower log(a)-values (− 4.000 to − 1.000) characterize the reaches between Yichang and Xinchang, immediately below the Three Gorges. These values indicate channel erosion and bed instability that result from changes in channel gradient from the upstream steep valley to downstream low slope flood plain settings. Differences in channel morphology accompany these changes. Confined, V-shaped valleys occur upstream and are replaced downstream by broad U-shaped channels. The middle and lower Yangtze shows an apparent increase in channel instability over the past 40 years. This inference is based on sediment rating parameters from various gauging stations that record increasing b-values against decreasing log(a)-values over that time. Analysis of the sediment load data also reveals a strong correlation between changes in sediment rating curve parameters and reduction of annual sediment budget (4.70 × 108 t to 3.50 × 108 t/year, from the 1950s to 1990s), largely due to the damming of the Yangtze and sediment load depletion through siltation in the Dongting Lake. Short-term deviations from the general trends in the sediment rating parameters are related to hydroclimatic events. Extreme low b-values and high log(a)-values signify the major flood years, while the reverse indicates drought events. When compared with rivers from other climate settings, it is evident that the wide range of values of the Yangtze rating parameters reflects the huge discharge driven by the monsoon precipitation regime of eastern China.  相似文献   

5.
China's Yellow River has experienced its dramatically decreasing trend for the flow discharge since the construction and operation of large reservoirs located upstream. This low flow regulation has triggered a severe aggradation of the Ulan Buh Desert channel of the Yellow River because the declining flow exhibits no capability to scour and carry away large amount input of desert sands from the Ulan Buh Desert. Twenty monitoring cross-sections documented the Ulan Buh Desert channel has experienced its increasing aggradational trend in conjunction with its lateral migration decreasing trend from 1966 to 2005, which is opposite to the normal pattern of aggradation with deepening or symmetrical infilling for a channel located downstream of a reservoir. The channel aggradation can also be identified two stages: slow aggradation and rapid aggradation. Slow aggradation is characterized by the channel bed elevation rising 9.5 cm on average between 1968 and 1985, which responded to the operation of the Liujiaxia reservoir. During this period, the flow discharge was similar to pre-dam flow conditions but the sediment transport reduced to half of its pre-dam value. Because of about 0.24 × 108 t of desert sands entering the channel from the Ulan Buh Desert annually, this dilute flow indicated not to scour the channel as expected, but contrarily to cause the channel aggraded. Rapid aggradation followed completion of the Longyangxia reservoir with the channel bed elevation rising by 73 cm on average between 1986 and 2005. In this period, the combined regulation of Liujiaxia and Longyangxia reservoirs has caused the flow discharge decreasing dramatically, which is more beneficial for accumulation of the desert sands (0.19 × 108 t yr− 1 on average) in the desert channel, and led to the channel aggradation rate accelerated rapidly.  相似文献   

6.
The New River crosses three physiogeologic provinces of the ancient, tectonically quiescent Appalachian orogen and is ideally situated to record variability in fluvial erosion rates over the late Cenozoic. Active erosion features on resistant bedrock that floors the river at prominent knickpoints demonstrate that the river is currently incising toward base level. However, thick sequences of alluvial fill and fluvial terraces cut into this fill record an incision history for the river that includes several periods of stalled downcutting and aggradation. We used cosmogenic 10Be exposure dating, aided by mapping and sedimentological examination of terrace deposits, to constrain the timing of events in this history. 10Be concentration depth profiles were used to help account for variables such as cosmogenic inheritance and terrace bioturbation. Fill-cut and strath terraces at elevations 10, 20, and 50 m above the modern river yield model cosmogenic exposure ages of 130, 600, and 600–950 ka, respectively, but uncertainties on these ages are not well constrained. These results provide the first direct constraint on the history of alluvial aggradation and incision events recorded by New River terrace deposits. The exposure ages yield a long-term average incision rate of 43 m/my, which is comparable to rates measured elsewhere in the Appalachians. During specific intervals over the last 1 Ma, however, the New River's incision rate reached 100 m/my. Modern erosion rates on bedrock at a prominent knickpoint are between 28 and 87 m/my, in good agreement with rates calculated between terrace abandonment events and significantly faster than 2 m/my rates of surface erosion from ancient terrace remnants. Fluctuations between aggradation and rapid incision operate on timescales of 104− 105 year, similar to those of late Cenozoic climate variations, though uncertainties in model ages preclude direct correlation of these fluctuations to specific climate change events. These second-order fluctuations appear within a longer-term signal of dominant aggradation (until 2 Ma) followed by dominant incision. A similar signal is observed on other Appalachian rivers and may be the result of sediment supply fluctuations driven by the increased frequency of climate changes in the late Cenozoic.  相似文献   

7.
Variations in the coupling of sediment transfer between different parts of a fluvial catchment, e.g., hillslope to axial stream, can hamper understanding but are an integral part of the geomorphological record. Depositional environments respond to a combination of land use, climate, storms (floods), and autogenic conditioning. The distribution of sediment in the upland landscapes of NW England is out of equilibrium with contemporary climate and geomorphological processes; more a function of peri- and paraglacial mobilisation of glacigenic deposits. Soil and vegetation development after deglaciation have interrupted any progression toward sediment exhaustion with sediment release controlled largely by extrinsic perturbation, with late Holocene anthropogenic activity, climate and extreme hydrological events the likely candidates. This paper presents a new radiocarbon-dated Holocene geomorphological succession for the River Hodder (NW England), alongside evaluating new palaeoecological and geoarchaeological data to discern the impacts of human activity. These data show a late Holocene expansion in human occupation and use of the landscape since the Iron Age (700–0 cal. B.C.), with more substantial changes in the character and intensity of upland land use in the last 1300 years. The geomorphological responses in the uplands were the onset of considerable and widespread hillslope erosion (gullying) and associated alluvial fan development. Interpretation of the regional radiocarbon chronology limits gullying to four, more extensive and aggressive phases after 500 cal. B.C. The downstream alluvial system has responded with considerable valley floor deposition and lateral channel migration that augmented sediment supply by remobilising the existing floodplain terraces and led to the aggradation of a series of inset alluvial terraces. The timing of these changes between states of aggradation and incision in alluvial reaches reflects the increased connectivity between the hillslope and alluvial systems. Aspects of both the regional climate and land use histories are conducive to increasing discharge and sediment flux, but the region wide lowering of erosion thresholds appears a key driver conditioning these sediment-rich conditions and producing a landscape that was more susceptible to erosion under lower magnitude flows.  相似文献   

8.
Piggyback basins developed at the mountain fronts of collisional orogens can act as important, and transient, sediment stores along major river systems. It is not clear, however, how the storage and release of sediment in piggyback basins affects the sediment flux and evolution of downstream river reaches. Here, we investigate the timing and volumes of sediment storage and release in the Dehra Dun, a piggyback basin developed along the Himalayan mountain front in northwestern India. Based on OSL dating, we show evidence for three major phases of aggradation in the dun, bracketed at ca. 41–33 ka, 34–21 ka and 23–10 ka, each accompanied by progradation of sediment fans into the dun. Each of these phases was followed by backfilling and (apparently) rapid fan‐head incision, leading to abandonment of the depositional unit and a basinward shift of the active depocentre. Excavation of dun sediment after the second and third phases of aggradation produced time‐averaged sediment discharges that were ca. 1–2% of the modern suspended‐sediment discharges of the Ganga and Yamuna rivers that traverse the margins of the dun; this sediment was derived from catchment areas that together comprise 1.5% of the drainage area of these rivers. Comparison of the timing of dun storage and release with upstream and downstream records of incision and aggradation in the Ganga show that sediment storage in the dun generally coincides with periods of widespread hinterland aggradation but that late stages of dun aggradation, and especially times of dun sediment excavation, coincide with major periods of sediment export to the Ganga Basin. The dun thus acts to amplify temporal variations in hinterland sediment supply or transport capacity. This conceptual model appears to explain morphological features of other major river systems along the Himalayan front, including the Gandak and Kosi Rivers, and may be important for understanding sediment flux variations in other collisional mountain belts.  相似文献   

9.
The “Ewijkse Plaat” is a floodplain along the Waal River, NL. In 1988, the floodplain was excavated as part of a program for enlargement of the discharge capacity and was assigned as a nature rehabilitation area. This paper describes the combined geomorphological and vegetation evolution of the floodplain until 16 years after the initial excavation using elevation data and data on vegetation structure derived from detailed aerial stereographic imagery. The impact of these processes on flow velocity and water surface elevation was evaluated by using a hydraulic model. Within 16 years, the excavated amount of sediment was redeposited in the area. The dominant geomorphological process after excavation was vertical accretion of the floodplain which resulted in the formation of natural levees. The amount of sedimentation was correlated to the across-floodplain flow (R2 = 0.89). In the research period, 41% of the sedimentation took place during two single major flood events. The creation of pioneer stages by excavation promoted softwood forest establishment, which influenced the sedimentation pattern significantly. The landscape evolved toward structure-rich vegetation. Nine years after excavation the initial hydraulic gain was lost by the combined effect of sedimentation and vegetation succession. Implications for river and nature management are discussed.  相似文献   

10.
黄河下游河床演变与河口淤积延伸   总被引:2,自引:0,他引:2  
朱起茂 《地理研究》1982,1(4):17-25
黄河挟带大量泥沙,经华北大平原入海,河口迅速延伸使河道不断地淤积抬高以至决口改道.本文初步分析了历史黄河和现行黄河下游河床演变与河口淤积延伸的关系.  相似文献   

11.
A typhoon in 1993 induced major aggradation along Oyabu Creek, a steep, gravel bed mountain stream in Kyushu, Japan. Processes of sediment reworking are inferred from a 7-year monitoring program that measured adjustments to channel cross-sections, the longitudinal profile, and the extent/distribution of bedrock outcrops along a 3-km study reach. Over time, the reach adopted a riffle and pool structure, with notable increase in the area of exposed bedrock on the bed. This adjustment process was characterised by progressive reduction in sediment storage change per unit flow. The relaxation pathway following disturbance induced by the typhoon was shaped by the magnitude and frequency of subsequent rainfall events, the capacity of these events to transport available sediments, and physical linkages between reaches. Adjacent subreaches demonstrated differing relaxation pathways in response to these influences, induced by spatial and temporal variability in threshold conditions along the channel. Longer-term evidence indicates that responses to major disturbance, such as the 1993 typhoon, occur as ‘cycles’ of around 20-year duration. A relaxation period of 7 years is required to attain a quasi-equilibrium bed configuration and rate of sediment flux. The timeframe of cycles is considered to reflect changes to hillslope–channel bed coupling, marking the period required to generate sufficient sediment stores to reactivate phases of aggradation and subsequent degradation.  相似文献   

12.
We introduce a new computational model designed to simulate and investigate reach-scale alluvial dynamics within a landscape evolution model. The model is based on the cellular automaton concept, whereby the continued iteration of a series of local process ‘rules’ governs the behaviour of the entire system. The model is a modified version of the CAESAR landscape evolution model, which applies a suite of physically based rules to simulate the entrainment, transport and deposition of sediments. The CAESAR model has been altered to improve the representation of hydraulic and geomorphic processes in an alluvial environment. In-channel and overbank flow, sediment entrainment and deposition, suspended load and bed load transport, lateral erosion and bank failure have all been represented as local cellular automaton rules. Although these rules are relatively simple and straightforward, their combined and repeatedly iterated effect is such that complex, non-linear geomorphological response can be simulated within the model. Examples of such larger-scale, emergent responses include channel incision and aggradation, terrace formation, channel migration and river meandering, formation of meander cutoffs, and transitions between braided and single-thread channel patterns. In the current study, the model is illustrated on a reach of the River Teifi, near Lampeter, Wales, UK.  相似文献   

13.
The effects of wetlands on hydrology, water quality, and wildlife habitat are internationally recognized. Protecting the remaining wetlands is one of the most important environmental issues in many countries. However wetlands in Japan have been gradually shrinking due to agricultural development and urbanization, which generally lowers the groundwater level and introduces suspended sediment and sediment-associated nutrients into wetlands. We examined the influences of channelization on discharge of suspended sediment and wetland vegetation in Hokkaido, northern Japan. The impact of river channelization was confirmed not only by the sediment budgets but also by river aggradation or degradation after the channelization and by the resultant vegetational changes. The budgets of suspended sediment demonstrated that wash load was the predominant component accounting for 95% of the total suspended load delivered into the wetland. This suspended sediment was primarily transported into the wetland by flooding associated with heavy rainfall. Twenty-three percent of the wash load and 63% of the suspended bed material load were deposited in the channelized reach, which produced aggradation of about 2 m at the end of the reach. A shorting of the length of the channel, due to channelization of a meandering river, steepened the slope and enhanced the stream power to transport sediment. This steepening shifted the depositional zones of fine sediment 5 km downstream and aggraded the riverbed. Development of the watershed may increase not only the water discharge but also the amount of suspended sediments. The aggradation reduced the carrying capacity of the channel and caused sediment ladened water to flood over the wetlands. The fine sediment accumulated on the wetlands gradually altered the edaphic conditions and wetland vegetation. A low percentage (10 to 15%) of organic contents of wetlands' soil is more evidence indicating that the present condition is far different from normal. Original vegetation such as sedges and Alnus japonica were disappearing from the adjacent areas of the river channel and were being replaced by willow trees (Salix spp.).  相似文献   

14.
In an actively deforming orogen, maintenance of a topographic steady state requires that hillslope erosion, river incision, and rock uplift rates are balanced over timescales of 105–107 years. Over shorter times, <105 years, hillslope erosion and bedrock river incision rates fluctuate with changes in climate. On 104-year timescales, the Marsyandi River in the central Nepal Himalaya has oscillated between bedrock incision and valley alluviation in response to changes in monsoon intensity and sediment flux. Stratigraphy and 14C ages of fill terrace deposits reveal a major alluviation, coincident with a monsoonal maximum, ca. 50–35 ky BP. Cosmogenic 10Be and 26Al exposure ages define an alluviation and reincision event ca. 9–6 ky BP, also at a time of strong South Asian monsoons. The terrace deposits that line the Lesser Himalayan channel are largely composed of debris flows which originate in the Greater Himalayan rocks up to 40 km away. The terrace sequences contain many cubic kilometers of sediment, but probably represent only 2–8% of the sediments which flushed through the Marsyandi during the accumulation period. At 104-year timescales, maximum bedrock incision rates are 7 mm/year in the Greater Himalaya and 1.5 mm/year in the Lesser Himalayan Mahabarat Range. We propose a model in which river channel erosion is temporally out-of-phase with hillslope erosion. Increased monsoonal precipitation causes an increase in hillslope-derived sediment that overwhelms the transport capacity of the river. The resulting aggradation protects the bedrock channel from erosion, allowing the river gradient to steepen as rock uplift continues. When the alluvium is later removed and the bedrock channel re-exposed, bedrock incision rates probably accelerate beyond the long-term mean as the river gradient adjusts downward toward a more “equilibrium” profile. Efforts to document dynamic equilibrium in active orogens require quantification of rates over time intervals significantly exceeding the scale of these millennial fluctuations in rate.  相似文献   

15.
黄河下游河槽横断面调整规律及治理方式探讨   总被引:7,自引:0,他引:7  
通过对影响河槽挟沙能力诸因素的分析,作者认为目前黄河下游只有河槽形态是一个人为可调节的控制河道淤积的要素。分析黄河下游河道横剖面形态的特征及其调整规律,考虑来沙组成变化、河槽综合阻力变化,计算得到黄河下游典型断面的实际挟沙能力及平均水沙条件下河槽平衡输沙横剖面,经与实际断面形态对比,得出必须以多级河槽方式缩窄7000m3/s流量以下即中、小水期的河槽,方能显着减少黄河下游河槽中的淤积的结论。这样才能真正实现潘季驯的“束水攻沙”的治黄方略。  相似文献   

16.
Fire can alter sediment sources and transport rates in river basins, changing landforms and aquatic habitats and degrading downstream water quality. Variability in the response between environments, between fires, and with time since fire makes predicting the catchment-scale effect of individual fires difficult. This study applies the fallout radionuclides 137Cs and 210Pbxs to trace the sources and transport of fine sediment through a river network following a wildfire of moderate to extreme severity in the 629-km2 eucalypt-forested Nattai River water-supply catchment near Sydney, Australia. The tracer analysis showed that post-fire erosion caused a switch in fine (< 10 µm) sediment sources from 80% subsoil derived from gully and river bank erosion to 86% topsoil derived from hillslope surface erosion. The fine sediment phosphorus content increased 4–10 fold over pre-fire levels. Annual post-fire sediment yields estimated from suspended solids rating curves were 109–250 times higher than they would have been without fire. A large additional amount of sediment remained stored within the river network for at least four years, particularly in lower-gradient reaches. Analysis of a sediment core showed that surface erosion following a previous fire had supplied at least 29% of total catchment sediment yield over the past 36 years. It is concluded that wildfire can alter catchment sediment budgets in two ways. Firstly, a spatially-diffuse pulse of elevated erosion is associated with moderate or intense rainfall events in post-fire years. Secondly, pulses of elevated catchment sediment yield are driven by the timing and river sediment transport capacity of runoff events. Severe post-fire erosion and high interannual hydrologic variability can result in large sediment stores persisting within the river network for many years. Fallout radionuclide tracers are shown to be useful in quantifying fine sediment sources and transport dynamics following wildfire, and the contribution of wildfire to catchment sediment yield.  相似文献   

17.
The sediment flux generated by postglacial channel incision has been calculated for the 2150 km2, non-glacial, Waipaoa catchment located on the tectonically active Hikurangi Margin, eastern North Island, New Zealand. Sediment production both at a sub-catchment scale and for the Waipaoa catchment as a whole was calculated by first using the tensioned spline method within ARC MAP to create an approximation of the aggradational Waipaoa-1 surface (contemporaneous with the Last Glacial Maximum), and second using grid calculator functions in the GIS to subtract the modern day surface from the Waipaoa-1 surface. The Waipaoa-1 surface was mapped using stereo aerial photography, and global positioning technology fixed the position of individual terrace remnants in the landscape. The recent discovery of Kawakawa Tephra within Waipaoa-1 aggradation gravels in this catchment demonstrates that aggradation was coincidental with or began before the deposition of this 22 600 14C-year-old tephra and, using the stratigraphic relationship of Rerewhakaaitu Tephra, the end of aggradation is dated at ca 15 000 14C years (ca 18 000 cal. years BP). The construction of the Waipaoa-1 terrace is considered to be synchronous and broadly correlated with aggradation elsewhere in the North Island and northern South Island, indicating that aggradation ended at the same time over a wide area. Subsequent downcutting, a manifestation of base-level lowering following a switch to postglacial incision at the end of glacial-age aggradation, points to a significant Southern Hemisphere climatic warming occurring soon after ca 15 000 14C years (ca 18 000 cal. years BP) during the Older Dryas interval. Elevation differences between the Waipaoa-1 (c.15 ka) terrace and the level of maximum channel incision (i.e. before aggradation since the turn of the 20th century) suggest about 50% of the topographic relief within headwater reaches of the Waipaoa catchment has been formed in postglacial times. The postglacial sediment flux generated by channel incision from Waipaoa catchment is of the order of 9.5 km3, of which ~ 6.6 km3 is stored within the confines of the Poverty Bay floodplain. Thus, although the postglacial period represented a time of high terrigenous sediment generation and delivery, only ~ 30% of the sediment generated by channel incision from Waipaoa catchment probably reached the marine shelf and slope of the Hikurangi Margin during this time. The smaller adjacent Waimata catchment probably contributed an additional 2.6 km3 to the same depocentre to give a total postglacial sediment contribution to the shelf and beyond of ~ 5.5 km3. Sediment generated by postglacial channel incision represents only ~ 25% of the total sediment yield from this landscape with ~ 75% of the estimated volume of the postglacial storage offshore probably derived from hillslope erosion processes following base-level fall at times when sediment yield from these catchments exceeded storage.  相似文献   

18.
High‐resolution seismic imaging and coring in Lago Fagnano, located along a plate boundary in Tierra del Fuego, have revealed a dated sequence of Holocene mass‐wasting events. These structures are interpreted as sediment mobilizations resulting from loading of the slope‐adjacent lake floor during mass‐flow deposition. More than 19 mass‐flow deposits have been identified, combining results from 800 km of gridded seismic profiles used to site sediment cores. Successions of up to 6‐m thick mass‐flow deposits, pond atop the basin floor and spread eastward and westward following the main axis of the eastern sub‐basin of Lago Fagnano. We developed an age model, on the basis of information from previous studies and from new AMS‐14C ages on cored sediments, which allows us to establish a well‐constrained chronologic mass‐wasting event‐catalogue covering the last ~12 000 years. Simultaneously triggered, basin‐wide lateral slope failure and the formation of multiple debris flow and postulated megaturbidite deposits are interpreted as the fingerprint of paleo‐seismic activity along the Magallanes‐Fagnano transform fault that runs along the entire lake basin. The slope failures and megaturbidites are interpreted as recording large earthquakes occurring along the transform fault since the early Holocene. The results from this study provide new data about the frequency and possible magnitude of Holocene earthquakes in Tierra del Fuego, which can be applied in the context of seismic hazard assessment in southernmost Patagonia.  相似文献   

19.
This paper assesses river channel management activities in the context of the interaction between coarse sediment delivery, climate change, river channel response and flood risk. It uses two main sources of evidence: (1) an intensive instrumentation of an upland river catchment using both traditional hydrometric and novel sediment sensing methods; and (2) a sediment delivery model that combines a treatment of sediment generation from mass failure with a treatment of the connectivity of this failed material to the drainage network. The field instrumentation suggests that the precipitation events that deliver sediment from hillslopes to the drainage network are different to those that transfer sediment within the network itself. Extreme events, that could occur at any time in the year (i.e. they are not dependent on wet antecedent conditions), were crucial for sediment delivery. However, sustained high river flows were responsible for the majority of transfer within the river itself. Application of three downscaling methods to climate model predictions for the 2050s and 2080s suggested a significant increase in the number and potential volume of delivery events by the 2050s, regardless of the climate downscaling scenario used. First approximations suggested that this would translate into annual bed level aggradation rates of between 0.10 and 0.20 m per year in the downstream main channel reaches. Second, the importance of this delivery for flood risk studies was confirmed by simulating the effects of 16 months of measured in-channel simulation with river flows scaled for climate change to the 2050s and 2080s. Short-term sedimentation could result in similar magnitude increases in inundated area for 1 in 0.5 and 1 in 2 year floods to those predicted for the 2050s in relation to increases in flow magnitude. Finally, we were able to develop an alternative approach to river management in relation to coarse sediment delivery, based upon reducing the rates of coarse sediment delivery through highly localised woodland planting, under the assumption that reducing delivery rates should reduce the rate of channel migration and hence the magnitude of the bank erosion problem. Thus, the paper demonstrates the need to conceptualise local river management problems in upland river environments as point scale manifestations of a diffuse sediment delivery process, with a much more explicit focus on the catchment scale, if our river systems are to become more insulated from the impacts of future climate changes.  相似文献   

20.
黄河下游河床纵剖面形态及其地文学意义   总被引:8,自引:2,他引:6  
本文通过河床比降和凹度两个指标,研究黄河下游河床纵剖面形态的自动调整作用,结果发现比降和下凹度多年平均值分别为1.28和1.35,偏离均值为1~2%,变化很小,说明黄河下游河床纵剖面以近于平行抬升的形态调整,标志着河道已进入了老年期发育阶段。对于研究河道发育史和老年期河道的特点,以及在治河上均有重要的理论和现实意义  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号