首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
《国际泥沙研究》2020,35(6):621-635
The objective of the proposed method is to utilize a site investigation of a debris flow disaster and verify a real scale analysis to evaluate the impulsive load on an open sabo dam. The Nagiso debris flow disaster which occurred in Nagano in 2014, where damage caused by Typhoon Neogri was studied. The verification result of the site investigation demonstrated the weak components of the open Sabo dam experienced damage owing to the debris flow. A discrete element method is normally applied to a solid body to calculate an interaction function force with respect to the contact point between boulders and the dam. The numerical method initially concatenates elements that model the open Sabo dam. Moreover, the stiffness coefficient of flanges and coupling joints between pipes was expressed to utilize the sectional partition method to determine the structural characteristics. The method was improved to separate from the connecting elements beyond the boundary conditions. The debris flow model uses a water flow distribution model, and the debris flow flowed from 200 m upstream of the open sabo dam. Accordingly, the proposed method was examined to verify the primary cause of damage to the open sabo dam and used to reproduce the circumstances that evaluated the impulsive load occurrence mechanism in the case of a real disaster. In addition, the coupling joints between the hollow steel pipes utilized a ‘reproduction analysis’ for a real sabo dam and a ‘reinforced analysis’ for a reinforced sabo dam were applied to assess the weak point of the dam.  相似文献   

2.
A sabo dam has a purpose to block the path of debris flow. However, when overflow occurs, a sabo dam works as a weir, a vertical obstruction, where the fluid must flow over. Many empirical formulas and discharge coefficients for weirs relating flow depth to discharge have been proposed to calculate overflow discharges. However, only a few studies about overflow discharge coefficients are available in the case of debris flow. In this paper, experiments and numerical simulations were done to estimate debris flow discharge coefficients by considering the sediment concentration. In the numerical simulation, a complete overflow equation and a free overfall equation were implemented to calculate debris overflow discharges at a sabo dam. To determine the discharge coefficients for each equation, single factor regression analysis was used. Laboratory experiments were done to calibrate and to compare with the simulation. Study results showed that the discharge coefficients increase as the sediment concentration increases. This finding suggests debris flow discharge coefficients are derived to calculate the debris overflow discharges at a sabo dam.  相似文献   

3.
1 INTRODUTIONTaiwan is a hilly-mountainous island lying across the center of the tropic. The slopeland accounts fortwo thirds of the total area of Taiwan. Most mountains are consisted of geologically young rocks incategories of fissile slates and shales which are easily eroded by weather. TOrrents combined with fissileslates and shales form debris flows with a very strong destrUctive power. This kind of debris flow canpotentially occur for almost all torrents whose gradient is steeper th…  相似文献   

4.
There are two kinds of Sabo dams in order to control sediment transport by debris flow and flash floods in mountainous area, which are closed and open-type's dams. In Japan, open-type's Sabo dams are constructed taking into account the continuity of sediment routing from upstream to downstream reach in a basin. A plan to construct a 20 m high grid-type Sabo dam which can capture a sediment volume of 400,000 m3 is proposed in the Amahata river basin in Japan. Hydraulic model tests are conducted to decide on the section for a dam (Section A, B) and the grid size such as clearance of vertical/horizontal bars for evaluating the plan. Several runs of flume tests are conducted and the sediment control function of the Sabo darn is discussed using several experimental data such as dimensionless sediment runoff rate from Sabo dam, temporal changes of bed profile and mean diameter and so on. It was found that sediment deposition in sediment storage area of Sabo dam was affected by curved channel, and that next the grid size of steel bars and thirdly the section of a dam was able to capture sediment in storage area of Sabo dam. Sediment was controlled well in the section B and in the grid size of 1.0×d95, and the problems related to sediment runoffafter sediment capturing in Sabo dam are pointed out.  相似文献   

5.
Time lag between reduction of sediment supply and coastal erosion   总被引:1,自引:0,他引:1  
The disruption of sediment supply from river to coast by dam development has been a topic of global concern.In Japan,among the top 30 dams in terms of height,14 dams were constructed prior to 1970 and another 6 dams before 1980.However,the coastline erosion did not surface up as a grievous problem until the 1980s.According to the River Bureau of Japan,the overall erosion rate along the coastline of Japan was 0.72×10~6 m~2/yr prior to 1980,but sharply increased to 1.6×10~6 m~2/yr since 1980.Therefore,there was a time lag between the disruption of sediment supply by dam and beach erosion.This paper presents a case study on what may have delayed the response of beach to the effect of dam construction.  相似文献   

6.
Sediment causes a serious problem in relation to dam function. A cooperative sediment sluicing operation has been under way since 2017 to prevent sediment from accumulating in dams in the Mimi River,Miyazaki, Japan. To achieve a smooth and stable operation, it is very important to determine the sediment source and a sediment transport system to maintain the dam’s function. In the current study, the source and transport of sediment from the Mimi River basin have been analyzed with X-ray diffracti...  相似文献   

7.
Severe soil erosion occurs on the Loess Plateau in China, which makes the Yellow River the most sediment-laden river in the world. Construction of about 60,000 sediment check dams has remarkably controlled soil erosion on the Loess Plateau and reduced the sediment load of the middle and lower Yellow River. Nonetheless, little is known about the mechanism of erosion control and vegetation development of sediment check dams. The function of a single check dam mainly is trapping sediment, while the function of a train of check dams comprising dozens of or over hundreds of check dams in a gully encompasses controlling bed incision and reducing erosion energy. A formula was proposed to calculate the potential energy of bank failure and slope failure in a gully, which essentially constitutes the erosion energy. The erosion energy increases when gully incision occurs, which is induced by the incision of the Yellow River and its tributaries on the Loess Plateau. Sediment deposition in many gullies due to construction of check dams reduces the erosion energy to almost zero, which in turn greatly reduces soil erosion and sediment yield. Construction of check dams promotes vegetation development. The vegetation-erosion dynamics model was used to study the effect of check dams on vegetation development. Simulation results show that reforestation without check dam construction might result in an increase of vegetation cover in the first ten years and then a drop of vegetation cover to less than 10% in the later years. The check dams provide a foundation for vegetation development.  相似文献   

8.
This paper focuses upon the natural dynamics of large woody debris (LWD), the impact of management on LWD dynamics, and the impact of LWD removal and channelization on the distribution and size of pools in a British, second to third order, headwater catchment. The study stream is rather different from those subject to LWD accumulations which have been studied in North America. The most important contrast is that it is surrounded by predominantly deciduous rather than coniferous woodland. In terms of its width (1·8–4·5 m) and gradient 0·013 m m−1), it falls within the lower range of channels studied in North America. Nevertheless, there are similarities in LWD dam and pool spacing with some North American studies. The information on LWD dynamics during a period without management and on recovery of LWD dams after clearance covers a 16 year period (1982–1997). The paper illustrates that seven to eight years after clearance the total number of LWD dams has recovered but the most hydraulically active dam type has not recovered to pre-clearance levels. An analysis of geomorphological maps of the channel surveyed in 1982 and 1996/97 shows an overall decrease in the number and size of pools along the section that was cleared of LWD dams. The magnitude of the decrease and the associated adjustments in pools through changes in their size and location differ according to location with respect to a section of the study stream which was channelized in c. 1966 and which has subsequently incised its bed. Copyright © 1998 John Wiley & Sons, Ltd.  相似文献   

9.
DESIGN OF SLIT DAMS FOR CONTROLLING STONY DEBRIS FLOWS   总被引:3,自引:0,他引:3  
1 INTRODUCTION Stony debris flows are natural, highly concentrated water-sediment mixture, which forms wherever the simultaneous availability of water, debris material and an adequate slope, steeper than o10 are satisfied (Gregoretti, 2000). In mountainous regions of Taiwan, due to vast development and utilization of hills, stony debris flows are important from the point of disaster prevention, since they occur frequently and often bring about heavy loss of lives and properties. Therefo…  相似文献   

10.
汶川8.0级地震水坝震害调查   总被引:11,自引:1,他引:10  
“5.12”汶川地震中水坝损毁严重,造成了巨大的经济损失。震后对69座溃坝险情和310座高危险情水库水坝进行了系统的调查,典型震害现象包括坝体裂缝、塌陷、滑坡、渗漏、启闭设施损坏和其他附属设施的损毁等。文中给出了不同烈度区的水坝震害分布,并对地震中水坝的震害现象做了初步总结和分析。  相似文献   

11.
The determination of sediment yield in catchments based on the sediment trapped by check dams is becoming a subject of interest.In fact,several methods have been developed in recent years to estimate the sediment retained by check dams.The complexity,precision and accuracy of each method vary greatly.In this study,we evaluate the sediment trapped by check dams comparing the Sections method respect to the Prism,Pyramid,DTMs and Trapezoid methods.We analyzed a sample of 25 check dams(α-1=90%;ε=10%) in the Saldana badlands(Spain).The results showed that the Sections method offered a volume of retained sediment between the others,which gave an absolute variation from 22%to40%.The high variability of the check dam and sediment wedge sizes made necessary to compare methods in groups combining both characteristics.No significant differences in sediment volumes could be found between the methods for very small(height(h):1.8-2.3 m;trapped volume(V):6-102 m~3) or large check dams(h 2.3 m;V:165-387 m~3),while significant differences are found for small(h 1.5 m;V:1-229 m~3) or middle-sized check dams(h:2.2-3.2 m;V:65-235 m3).Nevertheless,volume differences between groups ranged up to + 25%.For these reason,the size of the check dam,the shape of the sediment wedge and the accuracy of the measure methods must considered when selecting an appropriate method to obtain the volume of retained sediment by check dams.A correct estimation of the sediment retention is needed to evaluate the role and efficiency of check dams in restoration projects or to estimate sediment yields.  相似文献   

12.
The Tongariro Power Development Scheme (TPDS) is used to regulate flow in the headwaters of the largest catchment on the North Island of New Zealand (the Waikato). Two small dams, the Rangipo Dam and the Poutu Intake Dam, were constructed in 1973 and 1983. The flow regime of the river is managed to divert freshes into the power scheme, but allows flows larger than 100 m3 s?1 to be released, to rework and transport sediment through the catchment. Analysis of aerial photos and maps spanning 1928 to 2007, alongside field measurements, show that there have been few hydrogeomorphic adjustments since dam construction. This includes limited changes to channel geometry, channel planform and bed material organization immediately downstream of the dams. In addition, offsite effects are minimal, both 500 m downstream of each dam, and in the more sensitive, less confined reaches in the lower catchment (11 km downstream of the Poutu Intake dam). The limited changes can be attributed to the locations of the dams within reaches characterised by bedrock gorges and confined within terraces. These locations act to flush sediments and impose margins that allow minimal adjustment of the channel. Bed material within this reach is characterised by the presence of a boulder lag. This is sourced from long-term incision into lahar deposits, and acts to limit the rate of incision, creating a steep and stable base upon which active fractions are transported. Just as importantly, significant storage in the low-relief volcanic plateau located in the upper catchment acts to disconnect and store the high sediment yields generated by active volcanic cones in the western sub-catchment upstream of the dams. This limits the rate of sediment supply to regulated reaches. Findings from this study show that analysis of reach-scale controls is essential in framing dam site locations in relation to the distribution of reaches and landscape units across the catchment. In this instance, tributary inputs downstream of the dams do not replenish the sediment and flow removed at the dam locations, as has been observed in other regulated systems. Rather, the river itself is resilient to change and flow variability is well managed allowing geomorphically effective floods to occur. Landscape setting is a key consideration in determining the hydrogeomorphic impact of flow regulation.  相似文献   

13.
Large dam construction for irrigation, hydropower, water supply, and flood control in tropical to sub-tropical areas increased markedly after 1950. Many of the dams built during this period have filled with sediment and no longer perform to their original design specifications; in many cases, forecast dam life was greatly overestimated. This study investigates the useful life of Burdekin Falls Dam (BFD), northeastern Australia and compares the findings with other tropical reservoirs. Using two independent methods it is estimated that between 61 and 65 million m3 of sediment has been deposited in the reservoir over the 24 years of operation through 2011. This sediment volume equates to an average of 0.15% of capacity lost per year since construction was completed. If current sediment loads/climate regimes persist, reservoir capacity will be reduced by 50% after 345 years. However, the useful life of the BFD reduces to just 276 years when drawdown data are considered; these data show reservoir use would be affected once 40% of storage was filled with sediment, with a 60% drawdown return period of 1 in 15 years. When compared to similar large tropical to sub-tropical reservoirs, the BFD has a slightly longer reservoir useful life than dams in India and a much longer half-life than for both similar-sized and larger dams in China, Brazil, and Iran. Properties of the BFD that promote a longer useful life include a lower trap efficiency, relatively low annual sediment load delivered to the reservoir, limited sediment deposition behind the dam wall (and uniform distribution of deposited sediment), and the export of highly turbid annual floodwaters before settling and deposition of any remaining sediment within the reservoir.  相似文献   

14.
This study reports the results of a large woody debris (LWD) removal experiment in a meander bend along a low‐energy stream in the Midwestern United States. The LWD obstacle was located in the center of the channel at the bend exit and consisted of a mature tree with an intact soil‐covered root wad and a large accumulation of logs, branches and pieces of lumber on top of and adjacent to the main tree. The results indicate that the LWD obstruction influenced 3D flow structure in this bend at all flow stages. The main effect of LWD is to dramatically decelerate flow throughout the majority of the bend, while locally accelerating flow where it passes through the narrow chute at the downstream end of the LWD obstruction. Results from the LWD removal experiment indicate that patterns of three‐dimensional flow structure in meander bends are sensitive to complete removal of LWD. After the removal of LWD from the bend, both downstream and secondary velocities increased and, though still weak, secondary flow intensified. Large, relatively stable, obstructions that span a significant portion of the channel may act as natural dams, effectively ponding water upstream of the LWD, thereby producing substantial convective deceleration of the flow. This research is the first to document three‐dimensional flow structure before and after a controlled removal of LWD from a meander bend. Studies of the type reported here represent a first step toward determining the ensemble of process interactions between LWD and bend dynamics. Copyright © 2006 John Wiley & Sons, Ltd.  相似文献   

15.
Scouring and deposition processes resulting from variable rainfall and typhoon occurrence in tropical climatic conditions induce significant changes in the riverbeds of Taiwan. Along the Pachang River of western Taiwan, severe damage occurs during typhoons due to large and sudden variations in discharge, erosion, sediment transport and deposition. In order to simulate this process, the NETSTARS numerical modeling tool was used in the present paper. The influence of existing and planned check dam structures on flow control was also analyzed to determine their capacity to resist river erosion or to not be buried beneath sediments. Not only does the modeling tool allow calculation of the erosion-deposition behavior at the scale of the whole river, but it also provides local determination of the optimum location and characteristics such as foundation depth and lateral encroachment of future check dams. The results of a 10-year, long-term modeling simulation in terms of riverbed stability and scouring potential thus provide insights about unsafe future behavior at 4 sites. This numerical model provides a better general understanding and useful information for the optimal prevention of both the scouring damage and the burial related to sediment deposition with large changes in discharge and sediment transport.  相似文献   

16.
In this paper a general methodology for the analysis of large concrete dams subjected to seismic excitation is outlined. It is valid both for gravity dams (2D representation) and arch dams (3D representation). The method allows for non-linear material behaviour of the dam, ‘transparent fictitious boundaries’ for dealing properly with in-coming and out-going seismic waves, and an efficient procedure to deal with dam-soil-fluid interaction. The mechanical behaviour of concrete is modelled using an isotropic damage model which allows for tension and compression damage, and exhibits stiffness recovery upon load reversals. Emphasis is placed in the treatment of fluid-structure interaction, regarding both formulation and efficiency aspects. A gravity dam and an arch dam are analysed subjected to artificially generated earthquakes of different intensities, and the results are used to study the degree of (un)safety of the dams.  相似文献   

17.
In Mediterranean semi‐arid conditions, the availability of studies monitoring channel adjustments as a response to reforestation and check dams over representative observation periods, could help develop new management strategies. This investigation is an integrated approach assessing the adjustments of channel morphology in a typical torrent of southern Italy after land‐use changes and check dam construction across a period of about 60 years. A statistical analysis of historical rainfall records, an analysis of land‐use changes in the catchment area and a geomorphological mapping of channel adjustments were carried out and combined with field surveys of bed surface grain‐size over a 5‐km reach including 14 check dams. The analysis of the historical rainfall records showed a slight decrease in the amount and erosivity of precipitation. Mapping of land‐use changes highlighted a general increase of vegetal coverage on the slopes adjacent to the monitored reaches. Together with the check dam network installation, this increase could have induced a reduction in water and sediment supply. The different erosional and depositional forms and adjustments showed a general narrowing between consecutive check dams together with local modifications detected upstream (bed aggradation and cross‐section expansion together with low‐flow realignments) and downstream (local incision) of the installed check dams. Changes in the torrent bends were also detected as a response to erosional and depositional processes with different intensities. The study highlighted: the efficiency of check dams against the disrupting power of intense floods by stabilizing the active channel and the influence of reforestation in increasing hillslope protection from erosion and disconnectivity of water and sediment flows towards the active channel. Only slight management interventions (for instance, the conversion of the existing check dams into open structures) are suggested, in order to mobilize the residual sediment avoiding further generalized incision of the active channel and coast line erosion. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

18.
Blocking is one of the important features when a beam dam intercepts debris flow, while self-cleaning is another when managing suspended debris flow. Both features determine the debris flow control benefits of beam dam but the latter often is not considered in practical engineering design. In this paper, a series of specially designed flume experiments were done to simulate blocking and self-cleaning processes. The blocking ratio and deposition features were measured to contrast the blocking and self-cleaning performance before and after artificial self-cleaning. The experimental results reveal that the beam dam net opening, particle diameter of sediment, sediment concentration, and gradient of the channel are the main factors affecting blocking performance. A new criterion of blocking performance of beam dams that considers the interaction of multiple factors and can provide guidance to practical project design is proposed. For all three types of blocking, sediment deposited upstream of a beam dam can be effectively transported downstream by erosion from post-debris-flow floods, Self-cleaning performance is most efficient for temporary blocking, followed by partial-blocking, and total-blocking. The efficiency of self-cleaning largely depends on the change of the sediment deposit due to erosion. Finally, a discussion is given for the optimal design of an open-type check dam and the feasibility of synergistic effects of self-cleaning in combination with artificial cleaning. Some supporting artificial silt-cleaning should be implemented in practice. A beam dam will, thus, have more storage capacity with which to control the next debris flow event.  相似文献   

19.
汶川地震中绵阳市梓潼县水库土坝震害调查与分析   总被引:2,自引:0,他引:2  
5·12汶川特大地震对绵阳市梓潼县170座水库造成了不同程度的破坏和严重的经济损失.依据绵阳市梓潼县水库地震灾害的现场科学考察资料,对绵阳市梓潼县48座高危以上险情水库土坝的震损情况做了初步总结和分析.典型震害现象包括裂缝、渗漏以及泄水建筑物和附属设施的损毁等;以梓潼县3座典型震损水库土坝为例,总结了震损水库的特点和经验教训,给出了一些建设性结论.  相似文献   

20.
Data from 10 small farm dams in SE Australia show that shoreline erosion due to farm livestock access to the dams can account for a significant proportion (up to 85%) of sediment contained in the dam. The volumes of sediment resulting from such shoreline erosion may be of the same order as the volumes produced by gully erosion in the dams' catchments, prompting caution in using farm dams to which livestock have access to determine small catchment erosion rates. Other issues, related to the trap efficiency, also mean that erosion estimates based on farm dam sedimentation should be treated with caution. © 1998 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号