共查询到20条相似文献,搜索用时 31 毫秒
1.
Soil-rock mixtures (S-RM) are widely distributed in mountainous regions, and there are different genetic types and scales of S-RM slopes. The stability of these slopes is very important for slope safety during the construction and operation of engineering projects. Since the mechanical properties of an S-RM are mainly dominated by its random component, accurately investigating the structure of an S-RM slope is the fundamental basis for evaluating the mechanism of a landslide. In this paper, in situ direct shear tests are used to obtain the “soil” strength parameters of the S-RM, the microtremor survey method (MSM) is introduced to detect the S-RM slope and the numerical method of FEM is utilised to simulate the failure characteristics and stability of the S-RM slope. Based on the MSM, the strata structure and proportions of solitary rock blocks in the S-RM slope are investigated, and three possible models of the S-RM slope are established. By using the strength reduction method in numerical simulations, the potential failure surface and stability of a slope of homogeneous soil and that with solitary rock blocks are discussed. The study results show that the MSM is an effective method to estimate the proportion of rock blocks in the S-RM slope. The presence of solitary rock blocks makes the slope potential slide surface complicated. The factor of safety of the S-RM slope is higher than that of the homogeneous soil slope, the rock blocks at the toe of the slope are favourable for slope stability and the rock blocks near the surface of the slope squeeze the lower soil and improve the safety factor of the slope. 相似文献
2.
During the 2008 Wenchuan earthquake, the river valley from Yingxiu to Wenchuan experienced numerous landslides and became a prominent area of landslide complexes. The present large landslide complex near the earthquake epicenter consisted of Laohuzui slide 1, Laohuzui slide 2 and Douyaping slide. The scale, geology, morphology, sliding process, and failure mechanism of the landslide complex are analyzed by means of field investigation, aerial photograph and stereographic projection technique. Characteristics of these three slides including seismic response of slope, landslide debris, damage and potential failure are discussed: the convex slope and the upslope of fractured granitic rock at high altitude are highly prone to landsliding under earthquake; the high source altitude and long travel path determine grain sizes and the deposit angle of the slide debris; the landslide complex completely buries the G213 roadway and dams up the Minjiang River in these sections; after the earthquake, rainfall, aftershocks and river erosion may retrigger new failures, such as retrogressive slide of weathered fractured rock, colluvial landslide, debris flow, embankment failure and rockfall. The following are presented as suggested remedial measures to protect the roadway and stabilize the slope: the removing and trenching, protective concrete/rock blocks against erosion, retaining structure, rockfall stopping wall, rockfall restraining net, rock bolt, and the planting of vegetation. 相似文献
3.
2008年汶川大地震触发了数以万计的崩塌和滑坡,特别是沿发震断裂分布一系列大型的高速远程滑坡。为了探索地震诱发大型高速远程滑坡运动速度的反演方法,以汶川大地震典型高速远程滑坡为例,在野外调查和室内分析的基础上,结合前人的研究成果,对沿映秀-北川断裂展布的5个典型滑坡的速度进行了反演和计算。结果表明,5个滑坡的最大速度均大于50m/s,其中大光包滑坡速度最大,其下部滑体的最大速度约为300m/s,上部滑体凌空飞行的初速度高达165.6 m/s。同时,对上述滑坡的视摩擦系数进行了计算,4个滑坡的视摩擦系数介于0.16~0.4之间。这一研究的目的在于为类似地区地震滑坡的速度、最大位移量的预测和风险评估提供基础数据,对于类似地区的防灾减灾具有一定的参考价值。 相似文献
4.
The Guantan landslide, with a total displaced mass of about 468 × 10 4 m 3, was triggered by the 2008 Wenchuan earthquake and succeeding rainfall in Jushui Town, Sichuan Province, China. The landslide occurred on an anti-dip hard rock slope with a weak rock founding stratum of 200 m in thickness. To investigate the failure mechanism of the Guantan landslide, dynamic behaviors of hard and soft rock slopes were investigated by means of large scale shaking table tests. The laboratory models attempted to simulate the field geological conditions of the Guantan landslide. Sinusoidal waves and actual seismic waves measured from the Wenchuan Earthquake were applied on the slope models under 37 loading configurations. The experimental results indicated that deformation mainly developed at a shallow depth in the upper part of the hard rock slope and in the upper (near the crest) and lower (near the toe) parts of the soft rock slope. An equation for predicting the depth of sliding plane was proposed based on the location of the maximum horizontal acceleration. Finally, it was concluded that the failure process of the Guantan landslide occurred in three stages: (1) toppling failure caused by compression of the underlying soft rock strata, (2) formation of crushed hard rock and sliding surface in soft rock as the result of seismic shocks, particularly in the horizontal direction, and (3) aftershock rainfall accelerates the process of mass movement along the sliding plane. 相似文献
5.
2008年汶川大地震触发了数以万计的崩塌和滑坡,特别是沿发震断裂分布一系列大型的高速远程滑坡。为了探索地震诱发大型高速远程滑坡运动速度的反演方法,以汶川大地震典型高速远程滑坡为例,在野外调查和室内分析的基础上,结合前人的研究成果,对沿映秀-北川断裂展布的5个典型滑坡的速度进行了反演和计算。结果表明,5个滑坡的最大速度均大于50m/s,其中大光包滑坡速度最大,其下部滑体的最大速度约为300m/s,上部滑体凌空飞行的初速度高达165.6 m/s。同时,对上述滑坡的视摩擦系数进行了计算,4个滑坡的视摩擦系数介于0.16~0.4之间。这一研究的目的在于为类似地区地震滑坡的速度、最大位移量的预测和风险评估提供基础数据,对于类似地区的防灾减灾具有一定的参考价值。 相似文献
6.
银杏乡是距离5.12汶川大地震震中映秀最近的乡镇之一,地震导致全乡618人死亡,11人失踪,近千人受伤,88%的房屋倒塌,灾害损失极为严重。本文在实地调查的基础上,分析了区域地质环境背景,对银杏乡东界脑村、兴文坪村、一碗水村、沙坪关村、桃关村等10处灾后安置区的地质灾害发育特征和灾害成因进行了初步研究,研究发现安置区共有滑坡、崩塌危岩和泥石流灾害62处,灾害规模较小,暴发频率较高,绝大多数地质灾害均属本次汶川地震的次生地质灾害。结合对未来灾害发展趋势的分析,文章提出了防灾减灾的对策和建议。 相似文献
7.
Natural Hazards - Post-disaster recovery plans and policies can be better made after understanding which households are in the greatest need of help and support in post-disaster life recovery. In... 相似文献
8.
In this study, we present a landslide susceptibility assessment carried out after the devastating 2008 Wenchuan earthquake. For the Zhouqu segment in the Bailongjiang basin in north-western China landslide susceptibility was computed by a logistic regression method. This region has been experiencing landslides for a long time, and numerous additional slope failures were triggered by the 2008 Wenchuan earthquake. The data used for this study consists of slope failures attributed to the 2008 earthquake, the 878 post Wenchuan earthquake landslides and collapses inventory build up by combination the field investigation, monoscopic manual interpretation, image classification and texture analysis using SPOT 5 and ALOS remote-sensing image data. All data derived from remote sensing images are validated during field investigations. The landslide pre-disposing factor database was constructed. A digital elevation model (DEM) with a 30 × 30 m resolution, orthophotos, geological and land-use maps and information on peak ground acceleration data from the 2008 earthquake is used. The statistical analysis of the relation between Wencuan earthquake-triggered landslides and pre-disposing factors show the great influence of lithological and topographical conditions for earthquake-triggered slope failures. The quality of susceptibility mapping was validated by splitting the study area into a training and validation set. The prediction capability analysis showed that the landslide susceptibility map could be used for land planning as well as emergency planning by local authorities in this region. 相似文献
9.
Strong earthquakes are among the prime triggering factors of landslides. The 2008 Wenchuan earthquake ( M
w = 7.9) triggered tens of thousands of landslides. Among them, the Daguangbao landslide is the largest one, which covered
an area of 7.8 km 2 with a maximum width of 2.2 km and an estimated volume of 7.5 × 10 8 m 3. The landslide is located on the hanging wall of the seismogenic fault, the Yingxiu–Beichuan fault in Anxian town, Sichuan
Province. The sliding mass travelled about 4.5 km and blocked the Huangdongzi valley, forming a landslide dam nearly 600 m
high. Compared to other coseismic landslides in the study area, the Daguangbao landslide attained phenomenal kinetic energy,
intense cracking, and deformation, exposing a 1-km long head scarp in the rear of the landslide. Based on the field investigation,
we conclude that the occurrence of the landslide is controlled mainly by the seismic, terrain, and geological factors. The
special location of the landslide and the possible topographic amplification of ground motions due to the terrain features
governed the landslide failure. The effects of earthquakes on the stability of slopes were considered in two aspects: First,
the ground shaking may reduce the frictional strength of the substrate by shattering of rock mass. Second, the seismic acceleration
may result in short-lived and episodic changes of the normal (tensile) and shear stresses in the hillshopes during earthquakes.
According to the failure mechanism, the dynamic process of the landslide might contain four stages: (a) the cracking of rock
mass in the rear of the slope mainly due to the tensile stress generated by the ground shaking; (b) the shattering of the
substrate due to the ground shaking, which reduced the frictional strength of the substrate; (c) the shearing failure of the
toe of the landslide due to the large shear stress caused by the landslide gravity; and (d) the deposition stage. 相似文献
10.
A high steep rock hill with two-side slopes near National Road 213 is used as a prototype in this paper. The full process from initial deformation to sliding of the slope during ground shaking is simulated by a new discrete element method—continuum-based discrete element method. Then, the seismic responses of a high steep rock hill with two-side slopes are researched from the base of time, frequency and joint time–frequency domain using Hilbert–Huang transform and Fourier Transform. The findings are: first, the stress concentration phenomenon occurs at the top of the sliding mass, and then some tension and shear failure points appear, which expand from the top toward the toe of the sliding mass along the structural plane. At the same time, the number of tension failure points gradually increases. Then the toe of the sliding mass fails, and shears out from its toe which results in the landslide. If the material parameters are under the same conditions, the landslide in the middle of the slope occurs before that at the foot of slope, and the starting time of landslide and the arrival time of the peak ground acceleration are synchronous or the former slightly lags behind the latter. The difference of distribution and dissipation of earthquake energy in the sliding body and sliding bed is the major influence factor to induce the landslide. When the accelerations are small, the instantaneous frequency of accelerations between sliding bed and sliding body is generally consistent, the energy transmittance coefficients of the sliding structural plane and the controlled frequency band of the energy all range in a limitation; with the increase of the seismic intensity, the instantaneous frequency and the energy transmittance coefficients gradually decrease, and then they are steady within the lower limitation. At the same time, the controlled frequency band also shifts gradually from high frequency band to the lower one. Based on the input seismic wave, the peak acceleration amplifies as the increase of elevation, regardless of the monitoring points on the steep slope, gentle slope side or inside of the slope. Generally speaking, amplification of the vertical peak acceleration is stronger than that of the horizontal peak acceleration, and amplification of the peak acceleration on a steep slope is stronger than that on a gentle slope, and that of inside of the slope is the weakest amplification. 相似文献
11.
Catastrophic disasters can change the course of urban development and challenge the long-run sustainability of cities and regions. How to rapidly reconstruct communities impaired by catastrophic disaster is a world-wide challenge. The reconstruction after the 2008 Wenchuan earthquake in China was an unusual case of very rapid reconstruction after a catastrophic disaster. Over US$147 billion was invested to rebuild the damaged areas within 3 years. The reconstruction was not simply building back what was destroyed, but was used as an opportunity to advance national goals for urbanization, rural transformation, and poverty reduction. In this article, we review how the reconstruction was planned, budgeted, and financed in the sociopolitical context of 2008 China. Particularly, we discuss two innovative programs, namely pair assistance and land-based financing. Despite the unique circumstances of China, lessons can be learned to speed up post-disaster reconstruction and urban development in other countries. Conversely, this case illustrates that a narrow focus on physical reconstruction may overlook broader economic and social issues. 相似文献
12.
Natural Hazards - The April 20, 2013 Mw6.6 earthquake of Lushan County, Sichuan Province, China, has triggered 4540 landslides (>?1000 m2). Exploring a more effective method... 相似文献
13.
By analyzing the multi-year runoff and rainfall data at 15 hydrological stations from 1980 to 2007, as well as monthly runoff data from 1964 to 1984 at the Zipingpu hydrologic station, the relationship between precipitation and runoff has been established and the trend was explored. Based on the catastrophic floods of August 13 and August 18, 2010, characteristics and control factors on the post-seismic floods are summarized. Firstly, the Wenchuan earthquake and rupture zone provides the background for post-seismic floods to develop in the upper Minjiang River, which follows a post-seismic disaster-chain pattern: earthquake collapse to landslide debris flows to floods. Secondly, heavy rainfall controlled by the orographically-enhanced precipitation after the Wenchuan earthquake is the trigger factor for the development of devastating post-seismic floods. Thirdly, the post-seismic floods contain high sediment discharge, cause abrupt and severe damages, and have a large of volume and higher frequency. 相似文献
14.
汶川特大地震发生后,都江堰至汶川公路两侧地质灾害尤为发育,先后多次完全中断震中生命线的交通,严重影响了公路的安全运行和灾后重建的顺利进行。通过汶川地震前后都江堰-汶川公路边坡现场调查资料对比分析,研究了该地段边坡的主要地质灾害类型及其破坏模式、易发性分区和防治建议。研究表明破坏类型主要为碎屑流式、碎裂滑移崩塌,剪断-溃滑型、拉裂-溃滑型、顺层溃滑型滑坡和沟谷型泥石流。都汶公路两侧的边坡灾害以崩塌为主,滑坡、泥石流次之。地震使区内泥石流暴发的频率和规模增大,特大型泥石流主要发生在映秀-北川断裂带的地震烈度较高区域。防治此类地质灾害,应以治理为主,预防和避让相结合。 相似文献
15.
Natural Hazards - From a disaster relief perspective, an immediate and efficient rescue operation after an earthquake can greatly increase the number of survivors. An effective rescue operation... 相似文献
16.
山岳地区强烈地震诱发的滑坡、崩塌等地震次生灾害在造成严重人员伤亡的同时,对社会经济的发展也构成了严重威胁。而震后滑坡分布的快速评估,尤其是滑坡重灾区的确定,则可为救援工作的科学部署和有效开展提供决策支持并减轻地震灾害的损失。2017年8月8日发生于四川省阿坝州九寨沟风景区的MS 7.0级地震诱发了大量的滑坡、崩塌灾害,造成了一定的人员伤亡和财产损失,凸显出进行震后滑坡快速评估的重要性。本文通过对九寨沟地震灾区震前、震后“北京二号”遥感影像的对比分析,解译此次地震诱发的滑坡分布概况。尽管震后影像在局部区域有云团覆盖,影响了震区滑坡解译的详尽程度,但是对于主要发生的滑坡地震高烈度地区(≥Ⅻ度),本文所用影像基本满足解译要求。本文共解译出194个面积大于700 m2的滑坡,这些滑坡主要沿地震烈度长轴方向分布,灾害体平面面积达5.6 km2,影响范围超过600 km2。通过对九寨沟地震灾区的地形、岩性及地震动加速度进行分析,本文采用Newmark刚体滑块模型对该区震后滑坡危险区域进行了预测。预测结果按照危险程度不同划分为5个级别,即高度危险、较高危险、中度危险、较低危险和低度危险。滑坡分布与评估结果呈现出较好的一致性:解译的滑坡主要分布在评估为滑坡高度危险的区域,表明本文所采用方法的有效性。本文对该方法的局限性也进行了讨论,并提出改进建议。 相似文献
18.
平溪村滑坡是汶川地震触发的高速岩质滑坡,面积为3.7×104m2,体积约65×104m3。滑坡距离映秀—北川发震断裂带中的石坎断层不足500m,在强大地震力作用下,滑坡滑动面陡峭、粗糙,与重力作用下呈圆弧、平滑的滑面迥异。地震触发的滑坡可分为三个阶段:①震动拉裂阶段;②摩擦阻力降低、"锁固段"剪断阶段;③滑体溃滑,高速流动堆积阶段。然后结合结构面的力学分析,通过数值模拟对地震作用下的应力变化和震裂机制进行了初步分析。 相似文献
19.
Prediction on landslide displacement plays an important role in landslide early warning. Many models have been proposed for this purpose. However, the accuracy of the prediction results by these models often varies under different conditions. Rational evaluation and comprehensive consideration of these results still remain a scientific challenge. A new comprehensive combination model is proposed to predict the landslides displacement. The elementary displacement prediction is made by the support vector machine model, the exponential smoothing model, and the gray model (GM)(1,1). The results of the models are comprehensively evaluated by combining the results and introducing the accuracy matrix. The optimal weight in the evaluation work is obtained. A rational prediction result can be attained based on the so-called combination model. The proposed method has been tested by the application of Qinglong landslides in Guizhou Province, China. The comparison between the prediction results and in situ measurement shows that the prediction precision of the proposed model is satisfactory. The root-mean-square error (RMSE) of the combination model can be reduced to 1.4316 (monitoring site JCK2), 1.2623 (monitoring site JCK4), 2.3758 (monitoring site JCK6), 2.2704 (monitoring site JCK8), 1.4247 (monitoring site JCK11), and 0.9449 (monitoring site JCK12), which is much lower than the RMSE of the individual models. 相似文献
20.
The main purpose of this paper is to present the use of multi-resource remote sensing data, an incomplete landslide inventory, GIS technique and logistic regression model for landslide susceptibility mapping related to the May 12, 2008 Wenchuan earthquake of China. Landslide location polygons were delineated from visual interpretation of aerial photographs, satellite images in high resolutions, and verified by selecting field investigations. Eight factors, including slope angle, slope aspect, elevation, distance from drainages, distance from roads, distance from main faults, seismic intensity and lithology were selected as controlling factors for earthquake-triggered landslide susceptibility mapping. Qualitative susceptibility analyses were carried out using the map overlaying techniques in GIS platform. The validation result showed a success rate of 82.751 % between the susceptibility probability index map and the location of the initial landslide inventory. The predictive rate of 86.930 % was obtained by comparing the additional landslide polygons and the landslide susceptibility probability index map. Both the success rate and the predictive rate show sufficient agreement between the landslide susceptibility map and the existing landslide data, and good predictive power for spatial prediction of the earthquake-triggered landslides. 相似文献
|