首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 31 毫秒
1.
《国际泥沙研究》2019,34(6):537-549
Dam removal can generate geomorphic disturbances, including channel bed and bank erosion and associated abrupt/pulsed release and downstream transfer of reservoir sediment, but the type and rate of geomorphic response often are hard to predict. The situation gets even more complex in systems which have been impacted by multiple dams and a long and complex engineering history. In previous studies one-dimensional (1-D) models were used to predict aspects of post-removal channel change. However, these models do not consider two-dimensional (2-D) effects of dam removal such as bank erosion processes and lateral migration. In the current study the impacts of multiple dams and their removal on channel evolution and sediment delivery were modeled by using a 2-D landscape evolution model (CAESAR-Lisflood) focusing on the following aspects: patterns, rates, and processes of geomorphic change and associated sediment delivery on annual to decadal timescales. The current modeling study revealed that geomorphic response to dam removal (i.e., channel evolution and associated rates of sediment delivery) in multiple dam settings is variable and complex in space and time. Complexity in geomorphic system response is related to differences in dam size, the proximity of upstream dams, related buffering effects and associated rates of upstream sediment supply, and emerging feedback processes as well as to the presence of channel stabilization measures. Modeled types and rates of geomorphic adjustment, using the 2-D landscape evolution model CAESAR-Lisflood, are similar to those reported in previous studies. Moreover, the use of a 2-D method showed some advantages compared to 1-D models, generating spatially varying patterns of erosion and deposition before and after dam removal that provide morphologies that are more readily comparable to field data as well as features like the lateral re-working of past reservoir deposits which further enables the maintenance of sediment delivery downstream.  相似文献   

2.
Data from 10 small farm dams in SE Australia show that shoreline erosion due to farm livestock access to the dams can account for a significant proportion (up to 85%) of sediment contained in the dam. The volumes of sediment resulting from such shoreline erosion may be of the same order as the volumes produced by gully erosion in the dams' catchments, prompting caution in using farm dams to which livestock have access to determine small catchment erosion rates. Other issues, related to the trap efficiency, also mean that erosion estimates based on farm dam sedimentation should be treated with caution. © 1998 John Wiley & Sons, Ltd.  相似文献   

3.
Severe soil erosion occurs on the Loess Plateau in China, which makes the Yellow River the most sediment-laden river in the world. Construction of about 60,000 sediment check dams has remarkably controlled soil erosion on the Loess Plateau and reduced the sediment load of the middle and lower Yellow River. Nonetheless, little is known about the mechanism of erosion control and vegetation development of sediment check dams. The function of a single check dam mainly is trapping sediment, while the function of a train of check dams comprising dozens of or over hundreds of check dams in a gully encompasses controlling bed incision and reducing erosion energy. A formula was proposed to calculate the potential energy of bank failure and slope failure in a gully, which essentially constitutes the erosion energy. The erosion energy increases when gully incision occurs, which is induced by the incision of the Yellow River and its tributaries on the Loess Plateau. Sediment deposition in many gullies due to construction of check dams reduces the erosion energy to almost zero, which in turn greatly reduces soil erosion and sediment yield. Construction of check dams promotes vegetation development. The vegetation-erosion dynamics model was used to study the effect of check dams on vegetation development. Simulation results show that reforestation without check dam construction might result in an increase of vegetation cover in the first ten years and then a drop of vegetation cover to less than 10% in the later years. The check dams provide a foundation for vegetation development.  相似文献   

4.
Centuries-long intensive land-use change in the north-eastern United States provides the opportunity to study the timescale of geomorphic response to anthropogenic disturbances. In this region, forest-clearing and agricultural practices following EuroAmerican settlement led to deposition of legacy sediment along valley bottoms, including behind mill dams. The South River in western Massachusetts experienced two generations of damming, beginning with mill dams up to 6-m high in the eighteenth–nineteenth century, and followed by construction of the Conway Electric Dam (CED), a 17-m-tall hydroelectric dam near the watershed outlet in 1906. We use the mercury (Hg) concentration in upstream deposits along the South River to constrain the magnitude, source, and timing of inputs to the CED impoundment. Based on cesium-137 (137Cs) chronology and results from a sediment mixing model, remobilized legacy sediment comprised % of the sediment load in the South River prior to 1954; thereafter, from 1954 to 1980s, erosion from glacial deposits likely dominated (63 ± 14%), but with legacy sediments still a substantial source (37 ± 14%). We also use the CED reservoir deposits to estimate sediment yield through time, and find it decreased after 1952. These results are consistent with high rates of mobilization of legacy sediment as historic dams breached in the early twentieth century, and suggest rapid initial response to channel incision, followed by a long decay in the second half of the century, that is likely dependent on large flood events to access legacy sediment stored in banks. Identifying sources of sediment in a watershed and quantifying erosion rates can help to guide river restoration practices. Our findings suggest a short fluvial recovery time from the eighteenth–nineteenth century to perturbation during the first half of the twentieth century, with subsequent return to a dominant long-term signal from erosion of glacial deposits, with anthropogenic sediment persisting as a secondary source. © 2020 John Wiley & Sons, Ltd.  相似文献   

5.
《国际泥沙研究》2022,37(5):687-700
Globally, between 1950 and 2011 nearly 80,000 debris flow fatalities occurred in densely populated regions in mountainous terrain. Mitigation of these hazards includes the construction of check dams, which limit coarse sediment transport and in the European Alps number in the 100,000s. Check dam functionality depends on periodic, costly maintenance, but maintenance is not always possible and check dams often fail. As such, there is a need to quantify the long-term (10–100 years) geomorphic response of rivers to check dam failures. Here, for the first time, a landscape evolution model (CAESAR-Lisflood) driven by a weather generator is used to replicate check dam failures due to the lack of maintenance, check dam age, and flood occurrence. The model is applied to the Guerbe River, Switzerland, a pre-Alpine catchment containing 73 check dams that undergo simulated failure. Also presented is a novel method to calibrate CAESAR-Lisflood's hydrological component on this ungauged catchment. Using 100-year scenarios of check dam failure, the model indicates that check dam failures can produce 8 m of channel erosion and a 322% increase in sediment yield. The model suggests that after check dam failure, channel erosion is the remobilization of deposits accumulated behind check dams, and, after a single check dam failure channel equilibrium occurs in five years, but after many check dam failures channel equilibrium may not occur until 15 years. Overall, these findings support the continued maintenance of check dams.  相似文献   

6.
There are two kinds of Sabo dams in order to control sediment transport by debris flow and flash floods in mountainous area, which are closed and open-type's dams. In Japan, open-type's Sabo dams are constructed taking into account the continuity of sediment routing from upstream to downstream reach in a basin. A plan to construct a 20 m high grid-type Sabo dam which can capture a sediment volume of 400,000 m3 is proposed in the Amahata river basin in Japan. Hydraulic model tests are conducted to decide on the section for a dam (Section A, B) and the grid size such as clearance of vertical/horizontal bars for evaluating the plan. Several runs of flume tests are conducted and the sediment control function of the Sabo darn is discussed using several experimental data such as dimensionless sediment runoff rate from Sabo dam, temporal changes of bed profile and mean diameter and so on. It was found that sediment deposition in sediment storage area of Sabo dam was affected by curved channel, and that next the grid size of steel bars and thirdly the section of a dam was able to capture sediment in storage area of Sabo dam. Sediment was controlled well in the section B and in the grid size of 1.0×d95, and the problems related to sediment runoffafter sediment capturing in Sabo dam are pointed out.  相似文献   

7.
《国际泥沙研究》2020,35(4):408-416
The magnitude of soil erosion and sediment load reduction efficiency of check dams under extreme rainstorms is a long-standing concern. The current paper aims to use check dams to deduce the amount of soil erosion under extreme rainstorms in a watershed and to identify the difference in sediment interception efficiency of different types of check dams. Based on the sediment deposition at 12 check dams with 100% sediment interception efficiency and sub-catchment clustering by taking 12 dam-controlled catchments as clustering criteria, the amount of soil erosion resulting from an extreme rainstorm event on July 26, 2017 (named “7·26” extreme rainstorm) was estimated in the Chabagou watershed in the hill and gully region of the Loess Plateau. The differences in the sediment interception efficiency among the check dams in the watershed were analyzed according to field observations at 17 check dams. The results show that the average erosion intensity under the “7–26” extreme rainstorm was approximately 2.03 × 104 t/km2, which was 5 times that in the second largest erosive rainfall in 2017 (4.15 × 103 t/km2) and 11–384 times that for storms in 2018 (0.53 × 102 t/km2 - 1.81 × 103 t/km2). Under the “7–26” extreme rainstorm, the amount of soil erosion in the Chabagou watershed above the Caoping hydrological station was 4.20 × 106 t. The sediment interception efficiency of the check dams with drainage canals (including the destroyed check dams) and with drainage culverts was 6.48 and 39.49%, respectively. The total actual sediment amount trapped by the check dams was 1.11 × 106 t, accounting for 26.36% of the total amount of soil erosion. In contrast, 3.09 × 106 t of sediment were input to the downstream channel, and the sediment deposition in the channel was 2.23 × 106 t, accounting for 53.15% of the total amount of soil erosion. The amount of sediment transport at the hydrological station was 8.60 × 105 t. The Sediment Delivery Ratio (SDR) under the “7·26” extreme rainstorm was 0.21. The results indicated that the amount of soil erosion was huge, and the sediment interception efficiency of the check dams was greatly reduced under extreme rainstorms. It is necessary to strengthen the management and construction technology standards of check dams to improve the sediment interception efficiency and flood safety in the watershed.  相似文献   

8.
Many of the world's beaches have recently been eroding, even on progradational landforms. This study uses the sediment budget approach to identify and rank the causes of the hazard along Sandy Hook spit where the primary recreational beach has been eroding at about 10 m/yr since 1953 and 23 m/yr in the 1970s. Large spatial variations in longshore sediment transport are found to result from differences in refracted wave energies and intersegmental sediment transport. Erosion results from a 60 per cent deficit (-270,000 m3/yr) in the sediment budget that is primarily caused by (1) refraction induced locally high waves that increase the transport rate by 100,000 m3, and (2) shore protection structures that have lessened the longshore sediment inputs by an additional 100,000 m3/yr. A storm index is presented to analyse secular climatic variation. It suggests that the annual sediment transport rate may vary by as much as ±50 per cent about the mean and that recently, above normal storm wave energies are responsible for about 60,000 m3/yr of the budget deficit. Rising sea levels and storm overwash each account for only about one per cent of the sediment loss. Pulses of sediment, induced by accelerated erosion at the feeder beach locale of spit segments, are found to move downdrift. They alter the geomorphology of the spit through episodic extensions of the spit segments with lag times exceeding one year per segment.  相似文献   

9.
European settlement of the Poverty Bay Region resulted in deforestation and conversion of > 90% of the landscape to pastureland. The resulting loss of vegetation triggered a rapid increase in hillslope erosion as widespread landslide complexes and gully systems developed on weak lithologic units in the Waipaoa Basin. To quantify the rate and volume of historic hillslope degradation, we used a 1956–2010 sequence of aerial photographs for a ~16 km2 catchment to map temporal changes in the spatial extent of active landslides. Then we created a ‘turf index’ based on the extent and style of pastoral ground disruption, which correlates with downslope velocity. Based on the movement of trees and other features, we assigned average velocities to the turf classes as follows: (1) minimal disrupted ground: 0.6 m/yr, (2) a mix of disrupted ground and intact blocks: 3.4 m/yr, and (3) no intact blocks or vegetation: > 6 m/yr. We then calculated the average annual sediment flux using these turf‐derived velocities, the width of the landslide‐channel intersection, and an average toe depth of 4.4 ± 1.3 m (mean ± standard deviation [SD]) from 37 field measurements. The resulting catchment averaged erosion rates are (mean ± SD): 29.9 ± 12.9 mm/yr (1956), 28.8 ± 13.7 mm/yr (1969), 13.4 ± 4.9 mm/yr (1979), 17.0 ± 6.2 mm/yr (1988), and 9.9 ± 3.6 mm/yr (2010). Compared with long‐term (post‐18 ka) erosion rates (1.6 mm/yr) and the long‐term uplift rate (~1 mm/yr) for this site, the 50‐year anthropogenically‐driven rate is an order of magnitude larger (~20 mm/yr). Previously, we measured an increase in erosion over the past 3.4 kyr (2.2 mm/yr), and here, we demonstrate this increase could be primarily due to human land‐use change – showing that a century of rapid erosion superimposed on the background geologic rate can profoundly skew the interpretation of erosion rates. Copyright © 2016 John Wiley & Sons, Ltd.  相似文献   

10.
Sandy-muddy transitional beaches (SMT-Beaches), representing the transition from sandy beaches to tidal mudflats, should theoretically develop very different morphological and sedimentological characteristics in river estuaries and in semi-enclosed bays due to their contrasting dynamic sedimentary environments. Evidence, however, is rare in the scientific literature. To reveal these morphological and sedimentary differences, the sand–mud transition (SMT) boundary distribution, beach profiles, and surface and downcore sediment grain-size compositions of 27 SMT-Beaches located along mesotidal to macrotidal coasts of the western Taiwan Strait, southeastern China, were investigated. The results show that typical estuarine SMT-Beaches are mainly characterized by an ambiguous SMT, a long distance between the SMT and the coastline (31–302 m), lower SMT and inflection point altitudes (average –0.76 m and –0.04 m), and lower upper beach gradients (~0.068) with fine sand. Estuarine SMT-Beach sediments display clear interbedded mud and sand layers, implying potential SMT migrations over various timescales. By contrast, typical bay SMT-Beaches are characterized by distinct SMT, a short distance between the SMT and the coastline (11–52 m), higher SMT and inflection point altitudes (~0.24 m and ~0.35 m), and narrower upper beaches with higher gradients (~0.095) and coarse sand. Bay SMT-Beaches present relatively stable sedimentary sequences and a narrow gravel belt surrounding the inflection point and/or SMT. These morphological and sedimentary differences between the two SMT-Beach types are initially constrained by sediment supply and transport and are further affected by tide conditions and wave climate. Sediment supply and transport predominately control the sediment structures, while the tidal range strongly influences spatial variations in SMT distances. Wave climate normally drives SMT altitude variations. This study highlights the morphological and sedimentary differences in SMT-Beaches in estuaries and bays, providing important knowledge for further revealing their morphodynamic processes and potential future nourishment. © 2020 John Wiley & Sons, Ltd.  相似文献   

11.
River reaches downstream of dams with constant residual discharge often lack sediment supply and periodic high flows due to dam sediment retention and flow regulation, respectively. To test a novel multi-deposit methodology for defining environmental flows for activating the dynamics of the river morphology downstream of dams, a flood was released from Rossens Dam in Switzerland. This event was combined for the first time with a multi-deposit configuration of sediment replenishment consisting of four artificial deposits allocated as alternate bars along the riverbanks as a restoration measure. To validate the sediment transport behaviour observed in laboratory tests, stones were equipped with radiofrequency identification (RFID) passive integrated transponder (PIT) tags, a fixed antenna was installed at the river bed and a mobile antenna was used to enable the investigation of the erosion, transport and deposition of replenished sediments. The duration of the erosion period was determined for the tracked stones, and average transport velocities were found to be on the order of 10–3 m/s. To estimate the erosion efficiency of the flood, defined as the eroded tagged stones compared with the released water volume, the hydrograph was divided into different periods: rising limb, constant peak discharge, decreasing limb. During the rising limb of the flood, which lasted for 20% of the total flood duration, more than 40% of the PIT tags were transported. The defined erosion efficiency is a measure to support the hydrographic design of artificial flood releases from dams. The deposition of tagged stones resulted in a repeating cluster formation, as expected from previous laboratory experiments, creating an increase in hydraulic habitat diversity. Comparison of the results obtained in the field and from laboratory experiments confirmed the robustness of the multi-deposit sediment replenishment method. Combined with the knowledge gained on the erosion efficiency, these results could motivate further applications and research into multi-deposit sediment replenishment techniques as a habitat-oriented river restoration measure. © 2020 John Wiley & Sons, Ltd.  相似文献   

12.
《国际泥沙研究》2020,35(5):431-443
In recent years, the damage caused to human settlements in Japan by large woody debris (LWD) has been increasing. For example, the 2013 Izu Oshima typhoon resulted in a large number of fatalities and missing persons, and the Kagoshima Typhoon Disaster and Northern Kyusyu torrential downpour caused vast infrastructure damage due to the associated LWD. Current countermeasures for preventing LWD are insufficient to maintain the safety of residential areas. One type of protective barrier, the open sabo dam, has been constructed in Japan during the past 30 years. The primary function of open sabo dams is to block the flow of boulders, thereby also reducing sediment flow by reducing the gap size. However, because Japanese open sabo dams are designed specifically for boulder-trapping, the ability of these dams to trap LWD remains uncertain. In particular, many problems have been reported with respect to sediment trapping by driftwood with roots in an open sabo dam setting. The objective of this study was to examine the trapping efficiency of open sabo dams for LWD and sediment. The experimental approach clarified the influence of driftwood, without and with roots, on sediment trapping for a straight-channel flume. The flexible roots of the driftwood were shown to have a significant effect on the sediment trapping efficiency of the dam.  相似文献   

13.
In Mediterranean semi‐arid conditions, the availability of studies monitoring channel adjustments as a response to reforestation and check dams over representative observation periods, could help develop new management strategies. This investigation is an integrated approach assessing the adjustments of channel morphology in a typical torrent of southern Italy after land‐use changes and check dam construction across a period of about 60 years. A statistical analysis of historical rainfall records, an analysis of land‐use changes in the catchment area and a geomorphological mapping of channel adjustments were carried out and combined with field surveys of bed surface grain‐size over a 5‐km reach including 14 check dams. The analysis of the historical rainfall records showed a slight decrease in the amount and erosivity of precipitation. Mapping of land‐use changes highlighted a general increase of vegetal coverage on the slopes adjacent to the monitored reaches. Together with the check dam network installation, this increase could have induced a reduction in water and sediment supply. The different erosional and depositional forms and adjustments showed a general narrowing between consecutive check dams together with local modifications detected upstream (bed aggradation and cross‐section expansion together with low‐flow realignments) and downstream (local incision) of the installed check dams. Changes in the torrent bends were also detected as a response to erosional and depositional processes with different intensities. The study highlighted: the efficiency of check dams against the disrupting power of intense floods by stabilizing the active channel and the influence of reforestation in increasing hillslope protection from erosion and disconnectivity of water and sediment flows towards the active channel. Only slight management interventions (for instance, the conversion of the existing check dams into open structures) are suggested, in order to mobilize the residual sediment avoiding further generalized incision of the active channel and coast line erosion. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

14.
汉江兴隆水利枢纽运行后,坝下游近坝段枯水位较建坝前下降明显,500~800 m3/s流量下,2021年较运行前坝下水位累计下降2.47~2.55 m,对工程安全及效益发挥带来不利影响。基于水文、断面、水下地形等观测资料,对枯水位下降的原因进行深入剖析。结果表明,兴隆水利枢纽的拦沙作用有限,皇庄以上沙量减少是兴隆以下河床冲刷加剧的重要原因,高水调平导致的年内枯水上滩几率下降和航道整治护滩工程是强冲刷过程中“滩淤槽冲”的核心因素。坝下游河段枯水河槽冲刷及汉口最低水位下降是造成兴隆近坝段枯水位下降的直接原因。随机森林算法分析显示,对兴隆坝下水位变化影响最大的因素为兴隆站输沙率的锐减。此外,航道整治工程、河床边界条件对枯水位下降也有十分重要的驱动作用。兴隆坝址及下游河段的河床组成偏细,2012-2022年虽然河床剧烈冲刷,但床沙组成没有出现粗化的现象,预计河床仍将继续冲刷下切,枯水位尚未达到稳定状态。  相似文献   

15.
Natural damming of upland river systems, such as landslide or lava damming, occurs worldwide. Many dams fail shortly after their creation, while other dams are long‐lived and therefore have a long‐term impact on fluvial and landscape evolution. This long‐term impact is still poorly understood and landscape evolution modelling (LEM) can increase our understanding of different aspects of this response. Our objective was to simulate fluvial response to damming, by monitoring sediment redistribution and river profile evolution for a range of geomorphic settings. We used LEM LAPSUS, which calculates runoff erosion and deposition and can deal with non‐spurious sinks, such as dam‐impounded areas. Because fluvial dynamics under detachment‐limited and transport‐limited conditions are different, we mimicked these conditions using low and high erodibility settings, respectively. To compare the relative impact of different dam types, we evaluated five scenarios for each landscape condition: one scenario without a dam and four scenarios with dams of increasing erodibility. Results showed that dam‐related sediment storage persisted at least until 15 000 years for all dam scenarios. Incision and knickpoint retreat occurred faster in the detachment‐limited landscape than in the transport‐limited landscape. Furthermore, in the transport‐limited landscape, knickpoint persistence decreased with increasing dam erodibility. Stream capture occurred only in the transport‐limited landscape due to a persisting floodplain behind the dam and headward erosion of adjacent channels. Changes in sediment yield variation due to stream captures did occur but cannot be distinguished from other changes in variation of sediment yield. Comparison of the model results with field examples indicates that the model reproduces several key phenomena of damming response in both transport‐limited and detachment‐limited landscapes. We conclude that a damming event which occurred 15 000 years ago can influence present‐day sediment yield, profile evolution and stream patterns. Copyright © 2014 John Wiley & Sons, Ltd.  相似文献   

16.
Changxing Shi 《水文研究》2016,30(2):232-244
Using hydrological and sediment data, this study investigated decadal trends in sediment erosion/deposition in the Inner Mongolia reach of the upper Yellow River. The calculated yearly sediment erosion/deposition show that the reach was dominated by aggradation, degradation, and aggradation successively in three periods with the years around 1961 and 1987 as break‐points. By constructing relations between water discharge and sediment load, the contributions of key factors to the changes in sediment erosion/deposition in the reach were quantified. Results show that the sediment retention behind the main stem dams, the increase of natural runoff, and the decrease of sediment inputs from tributaries and upstream watershed were the main factors causing the transition from aggradation during 1955–1961 to degradation during 1962–1987. The reduction of natural runoff, the decrease of sediment retention behind dams, and the rise of sediment supply from tributaries were the key causes of the reversal from degradation in 1962–1987 to aggradation in 1988–2003. Water diversion has played an important role in the long‐term aggradation of the Inner Mongolia reach. The main stem dams had functioned to alleviate siltation after 1961, but their effects on siltation reduction had been gradually diminishing since the 1990s. Copyright © 2015 John Wiley & Sons, Ltd.  相似文献   

17.
When studying the evolution of landscape, it is difficult to discriminate the influence of anthropogenic from natural causes, or recognise changes caused by different sources of human action. This is especially challenging when the influence of certain sources is overprinted. For instance, although dam closure is the most common method of altering river courses, dam construction is often preceded by hydro‐technical works such as channel straightening, embankment construction or sediment mining. Both dam construction and the hydro‐technical works that precede dam closure can result in changes in the balance between sediment supply and transport capacity, and often, changes in river planform. The main objective of this study was to verify whether the works preceding dam closure are an important driver of river planform changes on the lower Drava River (Hungary). The case study is based on geological and geophysical surveys, as well as the analysis of historical maps covering an anabranching, 23 km long valley section. We show that channel straightening conducted prior to dam closure resulted in a transition from a meandering to sinuous planform with channel bars. Dam construction itself then caused enhanced incision, exposure of bar surfaces, vegetation encroachment and the formation of an anabranching planform. Based on this study, we developed models of alluvial island and channel planform evolution downstream of dams. Dam construction enhances channel incision, narrowing, and the reduction of flow caused by earlier hydro‐technical works. Many rivers downstream of dams experience episodes of anabranching or wandering, with a multi‐thread pattern replacing sinuous, braided and meandering courses. When incision continues, river patterns evolve from anabranching to sinuous via the attachment of alluvial islands to floodplains. However, the timing and sequence of these changes depend on hydrological and sediment supply regimes, geomorphic settings and anthropogenic actions accompanying dam construction. Copyright © 2018 John Wiley & Sons, Ltd.  相似文献   

18.
中国大陆含油气盆地的氦同位素组成及大地热流密度   总被引:11,自引:1,他引:10       下载免费PDF全文
根据天然气中氦同位素组成,讨论了中国大陆主要含油气盆地氦同位素地球化学特征与大地热流密度。不同地区425个~3He/~4He 值表明中国含油气盆地天然气的氦同位素组成变化范围较大,为4.0×10~(-9)-7.21×10~(-6),在统计直方图上呈现三个峰值:1.5×10~(-8),3.0×10~(-7)和1.5×10~(-6)。中国东部大陆裂谷系中、新生代盆地内天然气的~3He/~4He 值分布范围为1.02×10~(-7)-7.21×10~(-6),50%以上大于大气的值(1.4×10~(-6));其他地区含油气盆地天然气的~3He/~4He 值分布范围为4.0×10~(-9)-7.01×10~(-7),全部小于大气的~3He/~4He 值。根据天然气中~3He/~4He 值计算的大地热流密度值分布在30-82mW/m~2 之间。利用~3He/~4He 值计算的大地热流密度值与用其他方法测得的值相一致,在中国大陆水平方向上呈现"东高西低"的变化趋势。  相似文献   

19.
Dam removals with unmanaged sediment releases are good opportunities to learn about channel response to abruptly increased bed material supply. Understanding these events is important because they affect aquatic habitats and human uses of floodplains. A longstanding paradigm in geomorphology holds that response rates to landscape disturbance exponentially decay through time. However, a previous study of the Merrimack Village Dam (MVD) removal on the Souhegan River in New Hampshire, USA, showed that an exponential function poorly described the early geomorphic response. Erosion of impounded sediments there was two‐phased. We had an opportunity to quantitatively test the two‐phase response model proposed for MVD by extending the record there and comparing it with data from the Simkins Dam removal on the Patapsco River in Maryland, USA. The watershed sizes are the same order of magnitude (102 km2), and at both sites low‐head dams were removed (~3–4 m) and ~65 000 m3 of sand‐sized sediments were discharged to low‐gradient reaches. Analyzing four years of repeat morphometry and sediment surveys at the Simkins site, as well as continuous discharge and turbidity data, we observed the two‐phase erosion response described for MVD. In the early phase, approximately 50% of the impounded sediment at Simkins was eroded rapidly during modest flows. After incision to base level and widening, a second phase began when further erosion depended on floods large enough to go over bank and access impounded sediments more distant from the newly‐formed channel. Fitting functional forms to the data for both sites, we found that two‐phase exponential models with changing decay constants fit the erosion data better than single‐phase models. Valley width influences the two‐phase erosion responses upstream, but downstream responses appear more closely related to local gradient, sediment re‐supply from the upstream impoundments, and base flows. Copyright © 2017 John Wiley & Sons, Ltd.  相似文献   

20.
Alluvial rivers are composed of self-formed channels which are sensitive to disturbances in their flow and sediment-supply regimes. Regime changes commonly occur over decadal and longer timescales and can be caused by anthropogenic alterations such as dam construction and removal. Advances in numerical modeling have increased our ability to explore geomorphic adjustments over long timescales; however, many models designed to be run for decades or longer assume that banks are immovable or that channel width is constant. Since river channels often respond to disturbance by adjusting their geometry, this is a significant shortcoming. To investigate the impact of long-term sediment supply alterations on channel geometry and stability, we have adapted MAST-1D, a reach-scale bed evolution model, to incorporate functions for bank erosion, vegetation encroachment, and local avulsions. The model is designed for medium-large, coarse multithreaded rivers and can be run over long (decades–centuries) timescales. Bank erosion is a function of the mobility and transport capacity for structurally-important grains which protect the bank toe. Vegetation growth is proportional to point bar width and occurs during conditions of low shear stress. Local avulsions occur when aggradation causes channel depth to drop below a threshold. We apply the model to the Elwha River in Washington, USA with the goal of investigating if and when the river recovers from dam emplacement and removal. The Elwha was dammed for nearly 100 years, and then two dams were removed, releasing a large pulse of sediment. We have modeled the set of reaches between the two dams. Our simulations suggest that channel response to dam emplacement occurs gradually over several decades but that the channel recovers to near pre-dam conditions within about a decade following the removal. The dams leave a lasting legacy on the floodplain, which does not completely recover, even after two centuries. © 2019 John Wiley & Sons, Ltd.  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号