首页 | 本学科首页   官方微博 | 高级检索  
相似文献
 共查询到20条相似文献,搜索用时 62 毫秒
1.
This paper discusses the geological and hydrogeological features of Quaternary deposits in Tianjin as well as the geohazards related to groundwater hydrology in this region. The soft soil deposits, comprising silt, sand, silty clay and clay, are composed of four aquifer groups. In the first aquifer group, one phreatic aquifer and two confined aquifers have relationships with underground construction in the urban area. These three aquifers are separated by two aquitards and collectively form a multi-aquifer system. During geotechnical construction, potential geohazards present are related to the groundwater, which include water-in-rushing, quicksand and piping hazards. To prevent the aforementioned geohazards, dewatering is conducted; however, groundwater pumping may result in large settlements of the surrounding ground. To reduce pumping-induced settlement, the dewatering–waterproofing system has been adopted. According to the characteristics of the subsoil, excavation depth and the surrounding environment, the dewatering system can be divided into five patterns. In the first four patterns, when pumping is conducted in the excavation pit, the groundwater head in the adjacent aquifers outside the pit decreases due to the leakage effect of the aquitards located between the aquifers. In the fifth pattern, waterproof curtain has cut off the aquifers completely and dewatering in the pit cannot result in settlement around excavation pit. To avoid geohazards related to groundwater hydrology, countermeasures recommended include construction of an effective waterproof curtain, selection of a reasonable excavation dewatering pattern and withdrawal of required groundwater.  相似文献   

2.
This paper proposed a series of simple equations to calculate the head difference at the two sides of waterproof curtain. The barrier effect of waterproof curtain is considered from two situations with respect to without barrier case: (i) groundwater head difference below the barrier and (ii) groundwater head difference by convergence into the opening. The solution for the first situation can be derived from hydraulic analyses and the second situation can be obtained using a numerical analysis. The final groundwater head difference is the sum of these two situation according to the superposition principal. In the proposed equations, the head difference is expressed as a function of the inserted depth of the barrier into confined aquifer, the ratio of the hydraulic conductivity of the aquifer, the thickness of the aquifer, and hydraulic gradient under normal conditions. Finally, the proposed equation was applied to a field case to verify the validity of the proposed approach. Compared with the field data, the results show that the proposed method is reasonable.  相似文献   

3.
承压水降压引起的地面沉降由含水层、弱透水层和潜水层的变形组成。当承压层降压时间短、弱透水层固结变形较小时,可以假设弱透水层为严格的隔水层。采用层状弹性体系理论,基于位移协调条件分别建立了单井抽水以及第三类基坑工程降水(隔水帷幕插入降水含水层)引起的土层变形分析模型,与数值模拟和现场抽水试验结果的对比,验证了文中方法的正确性。研究结果表明,上覆土层弹性参数变化对地表变形的影响可以忽略;抽水井附近的土层变形呈现“上小下大”特点,一定距离以外含水层与地面沉降大致相等,根据承压含水层降深要求,可估算出基坑外的水位降深。  相似文献   

4.
Wang  Jianxiu  Liu  Xiaotian  Liu  Shaoli  Zhu  Yanfei  Pan  Weiqiang  Zhou  Jie 《Acta Geotechnica》2019,14(1):141-162

Water level is decreased during foundation pit excavation to avoid water inrush under confined water pressure. Cut-off wall is often used as waterproof curtain to partially cut off the dewatered aquifer. When a foundation pit is located in a built-up area and the underlying confined aquifer is not cut off, the drawdown must be minimized outside the pit to avoid land subsidence in buildings and pipelines. The coupling effect of the cut-off wall and pumping well is used to control the drawdown outside the foundation pit. However, the coupling mechanism is not intuitively well understood because of the limitations of existing experimental methods. In this study, transparent soil was introduced to model the coupling mechanism in the physical model test. High-purity fused silica and mixed paraffin oil were used as skeleton and fluid to simulate the confined aquifer and groundwater. Industrial solid dye and paraffin oil were used as tracers. A camera was used to collect flow information. Tests were performed for the combinations of cut-off wall and partially penetrating pumping wells. The insertion depth ratio of the cut-off wall most effectively influenced the drawdown. The layout of the pumping wells in horizontal direction influenced water level distribution and flow rate. The optimal depth of the pumping wells was 1–5 m above the bottom of the cut-off wall, and the optimal horizontal distance between the cut-off wall and the pumping wells was 25% of the pit width. Non-Darcy flow was observed within the range of 0–10 m around the bottom of the cut-off wall. These results were significant in understanding the cut-off wall and pumping well coupling effect on foundation pit dewatering.

  相似文献   

5.
基坑工程中,通常采用地下水回灌措施降低降水对周边地质环境产生的不良影响,然而目前基坑降水—回灌的相关设计理论仍处于探索阶段。本文通过引入平面二维流势函数理论和叠加原理,分别求解得到了无止水帷幕工况下潜水完整井和承压完整井在降水—回灌共同作用下的地下水浸润曲线方程;此外,本文通过空间汇点原理和镜像原理分别求得基坑内降水和基坑外回灌对基坑外地下水位的影响,并运用叠加原理得到了有止水帷幕工况下,深基坑降水—回灌作用下的地下水浸润曲线解析式。本文利用得到的解析式探讨了在具有止水帷幕条件下回灌井距基坑围护结构的距离、渗透系数等主要因素对浸润曲线的影响,为基坑降水—回灌设计提供了参考依据。  相似文献   

6.
A whirlpool foundation pit is a small-diameter, deep circular pit. Because of its depth and small diameter, a large drawdown is required, and a limited number of wells can be installed inside the pit. During excavation, partially penetrating wells inside and outside the foundation pit have to be installed to lower the water level when the aquifer is too thick. However, partially penetrating wells near partially penetrating curtains cannot be treated by analytical methods. Therefore, it is necessary to use numerical methods to predict dewatering during excavation. Field experiments were performed on whirlpool foundation pit 1880 of Baosteel Group, Shanghai, China, to obtain pumping rates and drawdown, pumping with a single well and two wells in the confined aquifer. The results indicate that the drawdown inside the pit induced by pumping wells outside the foundation pit was small, whereas it was large for pumping wells inside the pit. The pumping wells inside and outside the pit had to be combined to lower the water level. A three-dimensional numerical model was developed to simulate the dewatering process. The hydraulic conductivities of the confined aquifers were inversed by using the pumping tests. Operation schedules were simulated with the corrected model for different combinations of wells inside and outside the pit. The results suggest that different schedules and operation conditions affect drawdown. The monitored results during dewatering indicate that the simulation and field measurements were in agreement. The results can be applied to similar situations.  相似文献   

7.
地下水回灌技术在浅层承压含水层中的实践与探讨   总被引:2,自引:0,他引:2  
上海地区承压含水层埋深较深,深基坑围护的止水帷幕难以深入到承压含水层底板进行地下水水平向的完全阻隔,减压降水过程势必对周边环境产生一定影响。以上海盛大国际金融中心深基坑回灌试验为依据,表明人工回灌地下水对控制承压水位具有一定效果,并运用数值方法模拟了不同回灌条件下坑外承压水位的变化。  相似文献   

8.
高旭  郭建波  晏鄂川 《岩土力学》2018,39(4):1431-1439
提出止水帷幕条件下的深基坑降水预测的解析算法。以武汉长江航运中心深基坑为实例,概化其水文地质模型,以现场抽水试验数据分析止水帷幕的止水效果。基于此,修正非完整型干扰井群降深公式,结合镜像法原理编制计算程序进行降水预测解析计算,并与实测结果和数值模拟结果分别进行对比验证。研究表明:所概化的水文地质模型为承压含水层,东侧止水效果最差,南侧止水效果不如北侧,西侧止水效果最好。按原布井方案进行降水解析计算发现,在基坑南侧将达不到安全降水的目的,当增加2口降水井后降水效果有所改善,与实测结果和数值模拟结果基本一致。研究成果可指导工程设计,具有一定的实际应用价值。  相似文献   

9.
In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.  相似文献   

10.
In terms of controlling groundwater in deep foundation pit projects, the usual methods include increasing the curtain depth, reducing the amount of pumped groundwater, and implementing integrated control, in order to reduce the drawdown and land subsidence outside pits. In dewatering design for confined water, factors including drawdown requirements, the thickness of aquifers, the depth of dewatering wells and the depth of cutoff curtains have to be considered comprehensively and numerical simulations are generally conducted for calculation and analysis. Longyang Road Station on Shanghai Metro Line 18 is taken as the case study subject in this paper, a groundwater seepage model is developed according to the on-site engineering geological conditions and hydrogeological conditions, the excavation depth of the foundation pit as well as the design depth of the enclosure, hydrogeological parameters are determined via the pumping test, and the foundation pit dewatering is simulated by means of the three-dimensional finite difference method, which produces numerical results that consistent with real monitoring data as to the groundwater table. Besides, the drawdown and the land subsidence both inside and outside the pit caused by foundation pit dewatering are calculated and analyzed for various curtain depths. This study reveals that the drawdown and the land subsidence change faster near the curtain with the increase in the curtain depth, and the gradient of drawdown and land subsidence changes dwindles beyond certain depths. In this project, the curtain depth of 47/49 m is adopted, and a drawdown-land subsidence verification test is completed given hanging curtains before the excavation. The result turns out that the real measurements basically match the calculation results from the numerical simulation, and by increasing the depth of curtains, the land subsidence resulting from dewatering is effectively controlled.  相似文献   

11.
陆建生 《探矿工程》2018,45(6):57-62
沉降微扰动控制区域进行深基坑建设中,采用水平止水帷幕进行地下水控制的技术变得越来越重要。本文探讨了水平止水帷幕无压性地下水控制设计的原理,并应用到某车站的地下水控制设计中,抽水试验及最终的工程实践表明,水平止水帷幕的设计和施工达到了预期的效果。在此基础上针对水平止水帷幕施工工艺及渗漏检测方法、施工开挖期间的水位实时观测和预警提出了建议。  相似文献   

12.
降水条件对基坑开挖的变形特性具有重要影响。为了研究悬挂式止水帷幕结合承压非完整井组成的墙井系统条件下基坑开挖过程中的变形问题,以某悬挂式止水帷幕深基坑为例,通过定义降水井和地表渗流边界条件建立了考虑分级降水和基坑开挖实际工况的三维流固耦合有限元数值分析模型,使用现场监测数据与数值模拟结果互相验证的方法研究了悬挂式止水帷幕情况下基坑开挖过程中地下连续墙变形和地表沉降的变化特征,对比分析了悬挂式止水帷幕和落底式止水帷幕条件下的地表沉降。结果表明:在不同分级降水情况下,降水深度初次达到场地第一承压水含水层降水期间产生的地下连续墙水平位移增量最大,地表沉降也主要在这一期间产生;悬挂式止水帷幕情况下的地表沉降最大值约为落底式止水帷幕的2.7倍,最大值位置距地下连续墙边缘的距离比落底式止水帷幕大0.85 m;地下连续墙水平位移峰值处,降水期间产生的位移占28%,地表沉降峰值处,降水期间产生的沉降占49%;使用悬挂式止水帷幕时,距地下连续墙边缘12倍开挖深度处,地表沉降与地表沉降峰值的比值为0.1、该距离比落底式止水帷幕大13 m左右。研究成果对确定深基坑降水方案、保证深基坑开挖施工安全具有一定的参考价值。  相似文献   

13.
基坑采用悬挂式帷幕减压降水时,因隔水帷幕局部存在缺陷,而导致坑内承压含水层水头抬升所诱发的基坑底侧突涌事件常有发生。为研究这种现象,以某地铁线风井基坑为范例,建立了三维非稳定流的地下水数值模型,重点考虑了渗透系数的各向异性,对隔水帷幕无缺陷,28~33m、33~38m、38~43m深度的缺陷,加大流量抽取等7种情况,进行了模拟和比较分析。研究结果表明,悬挂式帷幕降水帷幕无缺陷时,帷幕内外的水头差在含水层顶最大,并沿帷幕向下递减;在帷幕缺陷形成的渗流通道附近,渗流场的等势线非常密集,补给的地下水抬升了坑内水头,并加剧了坑外的水头下降;经缺陷处的渗流通道流入坑内的地下水,渗流速度矢量以水平向为主;帷幕缺陷位于渗透系数较大的含水层时,相应补给量也较大;加大流量抽取,可以减小水头抬升的平面范围,但缺陷附近过大的流速也会诱发地层流土;缺陷位置与帷幕底竖向距离越远,坑内水头的抬升率越大,缺陷位置与帷幕底竖向距离越近,抬升率越小。研究成果对分析承压水底侧突涌的致灾机制、预测预警以及基坑动态风险评估等有一定的参考意义。  相似文献   

14.
由于地下水突涌风险,地下空间在施工作业中有必要通过抽水试验确定承压含水层的水文地质参数。依据勘察报告的初步评价,基坑开挖15.5m时,场地内第⑦1层承压含水层有可能产生突涌,为确保工程安全施工,需开挖前进行承压含水层抽水试验,取得场地承压含水层水文地质参数及降水引起的沉降特征,为地下空间设计和施工提供可靠依据。本次布设抽水井、观测井、分层沉降标组、孔隙水压力观测孔及地面沉降观测点,依据抽水试验技术要求获取渗透系数、抽水影响半径等相关水文地质参数。最后,针对工程场地内承压水情况及特点进行分析,提出基坑开挖时的承压水降压建议方案。  相似文献   

15.
苏州凤凰国际书城基坑监测分析   总被引:2,自引:1,他引:1       下载免费PDF全文
依据周边环境、地质条件与基坑挖深,对苏州凤凰国际书城基坑采用钻孔灌注桩加内支撑支护方案。由于该基坑紧邻地铁车站,周边环境复杂,依据有关规范制定了基坑施工监测方案,并对监测结果进行分析,包括深层水平位移、地下水位降深、地铁车站变位等。对于地下三层基坑的止水帷幕优先选择“两次提升、两次下沉”的三轴深搅桩施工工艺;局部落深区小范围内的第Ⅰ承压水位的降低对周边建筑物的影响不大。结论可作为区域性围护设计方案选择的参考。  相似文献   

16.
某深大基坑位于长江下游岸边,场地地层为典型的二元结构,基坑开挖涉及的两层承压含水层间的弱透水层局部缺失,之间水力联系密切,基坑场地地质条件极为复杂,基坑施工降水直接关系到基坑工程的安全。这里将基坑分3个区,分别进行降水设计。具体降水方案:Ⅰ区两层承压含水层和Ⅱ区第一承压含水层被围护结构隔断内外水力联系,采用疏干井降水;Ⅱ区第二承压含水层未被围护结构隔断,Ⅲ区两层承压含水层水力联系密切,针对这两个区域设计了两套降水方案,方案一在Ⅱ区和Ⅲ区均布置有降水井,在Ⅱ区对第二承压含水层降水,在Ⅲ区对第一承压含水层降水;方案二仅在Ⅲ区布置降水井对第一承压含水层降水。为了更好地对降水方案进行对比分析,验证方案的可行性,对此进行了数值模拟分析,计算结果显示,两种方案均能满足降水要求,不过方案二布井数量少,基坑外水位降深较小,对周边环境影响更小,优于方案一。  相似文献   

17.
仵彦卿  张建山  李哲 《岩土力学》2005,26(10):1582-1586
抽水引起周围地面沉降和构筑物地基沉降已成为工程建设中的一个环境灾害问题。根据抽水引起周围地面沉降的机理分析,提出了由抽水引起地下水水头压力变化、含水层颗粒迁移、含水层压缩和水体的膨胀的更具普遍意义的地下水运动方程,该方程可以简化成Biot和Helm的地下水运动方程。在此基础上,通过实例分析和方案对比,提出了抽水引起周围地面沉降的防治措施,并分析了各种措施的适用范围及优缺点。  相似文献   

18.
涌漏点的存在使得落底式止水帷幕条件下基坑涌水量的计算成为一个有待解决的技术难题。在承压含水层中开挖落底式深基坑时,针对落底式止水帷幕渗漏的不确定性,建立承压含水层中落底式基坑非完整井降水水文地质模型。基于Theis非完整井非稳定流理论,结合映射原理,推导等效渗透系数计算公式,并提出涌漏系数法用以评价落底式止水帷幕隔渗效果以及计算基坑涌水量。以武汉某深基坑降水工程为例,采用该方法评价止水帷幕的隔渗效果以及对其基坑涌水量进行计算,并与实测结果和传统方法计算结果分别进行对比验证。结果显示涌漏系数法计算误差较小,且计算过程简便,兼具安全性和经济性。研究结果可应用于指导工程设计,具有一定实际应用价值。  相似文献   

19.
Numerical study of dewatering in a large deep foundation pit   总被引:2,自引:1,他引:1  
During foundation pit excavation, groundwater is often the most important factor that affects pit stability. Dewatering is widely used in pit excavation to avoid uplift of excavation floors due to high water pressure. The characteristics of seepage in small-scale deep foundation pits of high-rise buildings or in the long narrow foundation pits of subway stations have been extensively investigated. However, the characteristics of seepage in large-scale deep excavations have not been studied. This paper investigates the large deep excavation of the buildings in Oriental Fisherman’s Wharf. The total area of the construction site is 33,917 m2. Single-well and group-well field pumping tests were performed and a numerical simulation by 3D finite difference method (FDM) was carried out. The simulation used results from the field pumping tests. The permeability parameters of the confined aquifer were then revised, based upon comparisons of simulation and observation results. Subsequently, dewatering schemes were simulated by FDM forward analysis. The simulation results show that dewatering schemes can minimize seepage and uplift in large excavation pits, though settlement outside the pit may need treatment measures.  相似文献   

20.
国家大剧院深基坑地下水控制设计及施工技术   总被引:3,自引:0,他引:3  
国家大剧院基坑地下水控制是大剧院工程的三大难题之一,也是专家们讨论的焦点。经过水文地质试验和充分论证,确定了地下水控制方案和施工方法,即采用反循环成井工艺施工引渗井,将上层滞水和潜水引渗到第一层承压含水层中消纳,保证第一步基坑开挖至-15 7m;在-15 7m位置采用连续墙阻隔第一层承压水,并使用旋挖钻机在槽内施工降水井,疏干槽内承压含水层并进行越流补给控制,保证基坑开挖至-26m;在歌剧院台仓局部加深部份(-32 5m),采用封闭布设减压井,解决基坑开挖和台仓地下结构施工时基坑突涌的问题;最后采用特殊的封井技术,将井管内高于槽底约10m的承压水头封堵在槽底以下0 5m,安全截断井管,保证了基础施工。  相似文献   

设为首页 | 免责声明 | 关于勤云 | 加入收藏