[1] 建筑物、水体、铁路及主要井巷煤柱留设与压煤开采规程 [S]. 煤炭工业出版社, 2006. The Standards of Coal Pillars left and Mining under the Buildings,Water Body,Railway and Roadway,Coal Industry Press, 2006.
[2] 孙世国, 王思敬.地下与露天复合采动影响下边坡岩体稳定性评价方法研究 [J].工程地质学报, 1990,(4) 312~318. Sun Shiguo,Wang Sijing. A method for evaluation of slope stability under the combined action of open pit and underground minings.Journal of Engineering Geology, 1990,(4) 312~318.
[3] 侯殿昆. 某露天矿井工开采对边坡稳定性影响研究 .西安:西安建筑科技大学(学位论文), 2005. Hou Diankun. Study on the Slope Stability some Strip Mine Worker Mining on Impact Study. Xi'an: The Master Gegree Dissertation of Xi'an University of Architecture & Technology, 2005.
[4] 胡海峰, 康建荣. 基于有限元法的采动坡体稳定性计算 [J].太原理工大学学报, 2007,(4):343~345. Hu Haifeng,Kang Jianrong. The calculation of ming slope stability based on the finite element. Journal of Taiyuan University of Technology, 2007,(4):343~345.
[5] 白占平, 郭增涛.井工开采对边坡稳定性影响的有限元分析 [J].中国矿业大学学报, 1991,(4):81~86. Bai zhanping,Guo Zengtao. The finite element analysis of slope stability by underground mining. Journal of China University of Mining & Technology, 1991,(4) 81~86.
[6] 谢和平, 周宏伟,等. FLAC在煤矿开采沉陷预测中的应用及对比分析 [J].岩石力学与工程学报, 1999, 18 (4): 397~401. Xie Heping,Zhou Hongwei. Application of FLAC to predict ground surface displacements due to coal extraction and its comparative analysis. Chinese Journal of Rock Mechanics and Engineering,1999, 18 (4): 397~401
|