首页 | 本学科首页   官方微博 | 高级检索  
     检索      

长江经济带上游地区丘陵城市工程建设适宜性评价——以泸州市规划中心城区为例
引用本文:陈绪钰,王东辉,倪化勇,李明辉,田凯.长江经济带上游地区丘陵城市工程建设适宜性评价——以泸州市规划中心城区为例[J].吉林大学学报(地球科学版),2020,50(1):194-207.
作者姓名:陈绪钰  王东辉  倪化勇  李明辉  田凯
作者单位:1. 中国地质调查局成都地质调查中心, 成都 610081;2. 中国地质调查局南京地质调查中心, 南京 210016
基金项目:中国地质调查局项目(DD20190524,DD20160249,12120113004300)
摘    要:以长江经济带上游地区泸州市规划中心城区为例,建立了包括多因素综合评价模型和多层次评价指标体系的工程建设适宜性评价方法,采用模糊赋权法和层次分析法相结合的组合赋权法计算评价指标的权重,利用GIS空间分析技术对泸州市规划中心城区工程建设适宜性进行了评价,并对评价方法的可靠性进行了分析。结果表明:泸州市规划中心城区工程建设适宜性整体较好,以适宜、较适宜为主,其中适宜区、较适宜区分别占研究区总面积的36.16%、28.81%,此外适宜性差区、不适宜区各占20.96%、8.07%;泸州市城市规划建设、重大工程建设选址应在适宜区和较适宜区范围内,尽量避免适宜性差和不适宜地区;在适宜性差和不适宜地区进行工程建设应注意不同区段现有和可能诱发的地质灾害、地基不均匀沉降、软土、坍岸等问题的防治。建立的评价方法在丘陵城市工程建设适宜性评价上适用性较好。

关 键 词:工程建设适宜性  城市规划  模糊赋权法  层次分析法  丘陵城市  泸州市  
收稿时间:2018-11-21

Building Suitability Evaluation of Hilly City in Upper Reaches of Yangtze River Economic Belt: In Case Study of Urban Central Planning of Luzhou City
Chen Xuyu,Wang Donghui,Ni Huayong,Li Minghui,Tian Kai.Building Suitability Evaluation of Hilly City in Upper Reaches of Yangtze River Economic Belt: In Case Study of Urban Central Planning of Luzhou City[J].Journal of Jilin Unviersity:Earth Science Edition,2020,50(1):194-207.
Authors:Chen Xuyu  Wang Donghui  Ni Huayong  Li Minghui  Tian Kai
Institution:1. Chengdu Center, China Geological Survey, Chengdu 610081, China;2. Nanjing Center, China Geological Survey, Nanjing 210016, China
Abstract:Taking the planning of the central urban area in Luzhou City as the research area, we firstly established the building suitability evaluation method, which includes multiple factors, comprehensive evaluation model, and multi hierarchy evaluation index system, secondly calculated the weight of evaluation factors based on Fuzzy weighting and APH, and then evaluated the building suitability of the research area combined with the statistical methods and GIS spatial analysis techniques, finally analyzed the reliability of the evaluation methods. The results indicate that the evaluation method is suitable for hilly urban building suitability evaluation. The suitable area accounts for 36.16% of the total area, the relatively suitable area accounts for 28.81%, the poor area accounts for 20.96%, and the unsuitable area accounts for 8.07%. The building suitability of the research area is well. The planning and construction and the site selection of major construction in Luzhou City should be in the suitable area or relatively suitable area. If the construction and major construction site is in a poor area and unsuitable area, the attention should be paid to the prevention and control of the existing and possible geological disasters induced by uneven settlement of foundations, soft soil, and collapse in different sections.
Keywords:building suitability  urban planning  fuzzy weighting method  AHP  hilly city  Luzhou City  
本文献已被 CNKI 等数据库收录!
点击此处可从《吉林大学学报(地球科学版)》浏览原始摘要信息
点击此处可从《吉林大学学报(地球科学版)》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号