首页 | 本学科首页   官方微博 | 高级检索  
     检索      

热德拜油田水平井优快钻井配套技术
引用本文:柯学,王吉文,朱杨,胡新兴,周红敏.热德拜油田水平井优快钻井配套技术[J].探矿工程,2014,41(10):26-31.
作者姓名:柯学  王吉文  朱杨  胡新兴  周红敏
作者单位:[1]中国石油西部钻探钻井工程技术研究院,新疆克拉玛依834000; [2]中国石油西部钻探阿克套项目部,新疆乌鲁木齐830000
摘    要:为加快热德拜油田水平井钻井开发步伐,通过对岩石力学特性、岩石理化特性、井眼轨道、钻具组合、钻头选型等方面的研究,形成了以PDC钻头复合钻井技术、井眼轨迹控制技术、防漏堵漏钻井液技术、筛管顶部双级注水泥固井技术等为主的科学、合理的配套工艺技术,并应用于现场施工,加快了热德拜水平井开发步伐,节约了开发成本。2012年水平井平均钻井周期为42.96天,完井周期53.38天;2013年水平井平均钻井缩短至19.58天;完井周期37天,同比钻井周期缩短54.4%,完井周期缩短41.1%。

关 键 词:水平井  井身结构  井下动力钻具  PDC钻头  顶部双级固井  热德拜油田
收稿时间:2014/3/12 0:00:00
修稿时间:2014/7/15 0:00:00

Matching Technology of High Quality and High Speed Drilling for Horizontal Well in Redebye Oilfield
KE Xue,WANG Ji-wen,ZHU Yang,HU Xin-xing and ZHOU Hong-min.Matching Technology of High Quality and High Speed Drilling for Horizontal Well in Redebye Oilfield[J].Exploration Engineering(Drilling & Tunneling),2014,41(10):26-31.
Authors:KE Xue  WANG Ji-wen  ZHU Yang  HU Xin-xing and ZHOU Hong-min
Institution:KE Xue, WANG Ji-wen, ZHU Yang, HU Xin-xing, ZHOU Hong-min ( 1. China Petroleum Western Drilling Engineering Institu- te, Karamay Xinjiang 834000, China; 2. Aktau Project Manager Department of China Petroleum Western Drilling, Urumqi Xinjiang 830000, China)
Abstract:In order to speed up the development of horizontal well drilling in Redebye oilfield, by the study on rock me-chanical properties, rock physical and chemical properties, wellbore trajectory, BHA and bit selection, a science is formed of mainly by PDC bit combined drilling, well trajectory control, plugging drilling fluid and two-stage cementing at screen top technologies, and a rational matching processing technology is also developed.These are applied in the field construc-tion to speed up the horizontal well drilling in Redebye and save the development cost.In 2012, the average cycle of hori-zontal well drilling was 42.96 days and well completion period 53.38 days;in 2013, those were 19.58 days and 37 days, being shortened by 54.4%and 41.1%respectively.
Keywords:horizontal well  casing program  downhole motor  PDC bit  two-stage cementing at screen top  Redebye oil-field
本文献已被 维普 等数据库收录!
点击此处可从《探矿工程》浏览原始摘要信息
点击此处可从《探矿工程》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号