拦河坝砼防渗墙的施工技术
引用本文:曾鹏九.拦河坝砼防渗墙的施工技术[J].探矿工程,1996(5):46-48.
作者姓名:曾鹏九
作者单位:黄河水利委员会勘测规划设计院地质勘探总队
摘    要:拦河坝砼防渗墙多在砂层与砂卵石层上施工,地基处理根据地质条件选择,施工方法有无导孔挖槽导孔挖槽,冲击成槽,回转钻成槽,锯槽机成槽,锯槽机为新型防渗成墙材料提供了新的施工手段,但有局限性。

关 键 词:防渗墙  锯槽机  拦河坝  混凝土防渗墙

Concrete Seepage Cut-off Wall Construction for a River-crossing Dam
Zeng Pengjiu.Concrete Seepage Cut-off Wall Construction for a River-crossing Dam[J].Exploration Engineering(Drilling & Tunneling),1996(5):46-48.
Authors:Zeng Pengjiu
Abstract:The seepage cut -off wall for the river-crossing dam is usually installed in the sand and the sandy gravel. The dam site treatment depends on the geological conditions and the construction methods include trench-cutting without pilot hole, trench-cutting with pilot hole, percussive trenching, rotsry trenching and trenching by trench saw. The trench saw provides a new construction method for the new seepage cut-off walling material, but has its limitation.
Keywords:seepage cut-off wall trench-cutting method trench saw bottom cleaning concreting