首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Construction project optimizing of soft rock and shallow buried tunnel
Authors:WANG Wei-feng  BI Jun-li
Institution:1. Beijing Urban Engineering Design and Research Institute, Beijing 100037, China; 2. China Railway Tunnel Survey and Design Institute, Luoyang 471009, China
Abstract:Recently many problems such as surrounding rock collapse, large-area settlement of ground surface etc have happened during soft rock and shallow buried tunnel construction of express highway. The stratum condition of a shallow buried zone of Guangfu Tunnel is very complex. The section is large and the lithology is weak. The action of conformation has much influence on the shallow buried zone. And its top length is very thin. It is very easy to cause cave-in collapse and fall of ground. In order to ensure the construction safety of shallow buried zone tunnels and reduce the stratum settlement and surrounding rock deformation caused by the excavation of tunnels, four construction projects are simulated by FLAC3D as much full section method, shot shoulder method, unilateral pilot tunnel method and double pilot tunnel method. The variation feature of ground surface settlement, surrounding rock circumjacent displacement and plastic zone during the four excavation projects are analyzed. These four construction projects are computed with finite element method. Some valuable conclusions are drawn: (1) the double pilot tunnel method may produce fewer vertical displacements and horizontal convergence and its stabilization is better. (2) the plastic zone radius for double pilot tunnel method is least. (3) it is the most reasonable that double pilot tunnel method is adopted in the shallow buried zone of Guangfu Tunne1.
Keywords:soft rock  shallow buried tunnel  construction projects  numerical simulation  
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号