摘    要:针对三峡永久船闸中隔墩变形监测资料所反映出的几种典型变形规律,采用有限元数值分析和工程地质条件分析等研究手段进行了深入细致的分析得出以下结论:中隔墩岩体水平位移植的波动是由于临槽的不同步开挖引起的;第二闸室至第三闸室首的中隔墩向北“一边倒”是因为南南北闸室地应力的差异和结构面的存在;中隔墩沿深度方向水平移数值发生突变的原因是结构面的存在。并为研究岩土工程变形监测资料中的“个性问题”(或称异常情况)提供了一种有益的借鉴。

关 键 词:三峡  永久船闸  隔墩岩体  变形分析  边坡  监测  位移  ANSYS
文章编号:1000-7598-(2002)06-0683-04
收稿时间:2001-10-25
修稿时间:2001年10月25

Deformation analysis of middle pier in Three Gorges permanent shiplock
WANG Tao,ZHOU En-hua,ZHU Huan-chun,ZHAO Hai-bin,KE Qing-qing,WANG Ying.Deformation analysis of middle pier in Three Gorges permanent shiplock[J].Rock and Soil Mechanics,2002,23(6):683-686.
Authors:WANG Tao  ZHOU En-hua  ZHU Huan-chun  ZHAO Hai-bin  KE Qing-qing  WANG Ying
Institution:1. School of Water Resources and Hydropower, Wuhan University, Wuhan 430072 , China; 2.School of Civil and Architectaral Engineering, Wuhan University, Wuhan 430072 , China; 3.Mid-South Design & Research Institute for Hydroelectric Projects,Changsha 410014, China; 4.Water Conservancy Bureau of Meizhouwan, Putian 351146, China
Abstract:The deformation monitoring data of the middle pier of the Three Gorges permanent shiplock reveals several interesting deformation phenomena. Conclusions and explanations are made concerning the phenomena, based on the finite element analysis and engineering geologic analysis. First, the fluctuation of the horizontal transformations can be attributed to the alternate excavation of the two neighboring shiplock rooms. In addition, the main reasons for the one-side-leaning phenomena in some places are the natural stress, which is not evenly distributed, and the presence of discontinuities. Lastly, the rockmass discontinuities result in the displacement breaks. A valuable reference for studying the ‘individual phenomena’ in geotechnical engineering is provided.
Keywords:Three Gorges Project  slope  monitoring  displacement  ANSYS
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号