首页 | 本学科首页   官方微博 | 高级检索  
     检索      

考虑堆石体流变效应的高面板坝最优施工程序研究
引用本文:周伟,常晓林,胡颖,闫生存.考虑堆石体流变效应的高面板坝最优施工程序研究[J].岩土力学,2007,28(7):1465-1468.
作者姓名:周伟  常晓林  胡颖  闫生存
作者单位:1. 武汉大学,水资源与水电工程科学国家重点实验室,武汉,430072
2. 湖北清江水布垭工程建设公司,宜昌,443002
摘    要:考虑高面板坝堆石体的流变变形效应对堆石体的最优施工碾压进度方案进行了研究。结果表明,堆石体的本身流变变形特性对不同施工碾压进度方案下的面板垫层变形影响较大。堆石坝不同材料分区的特点从客观上决定了高堆石坝必然存在一个较优的施工填筑上升方案。堆石体均匀上升的填筑进度方案的面板垫层法向最大位移较小,且沿面板坡向的分布比较均匀,对面板与垫层间的协调变形有利。从最优填筑方案的角度来看,建议高堆石坝采用均匀上升的碾压施工程序。

关 键 词:面板堆石坝  流变  施工程序  有限元  仿真分析
文章编号:1000-7598-(2007)07-1465-04
收稿时间:2005-03-03
修稿时间:2005-03-03

A study of optimal construction scheme of high concrete face rockfill dam in consideration of rockfill creep effect
ZHOU Wei,CHANG Xiao-lin,HU Ying,YAN Sun-cun.A study of optimal construction scheme of high concrete face rockfill dam in consideration of rockfill creep effect[J].Rock and Soil Mechanics,2007,28(7):1465-1468.
Authors:ZHOU Wei  CHANG Xiao-lin  HU Ying  YAN Sun-cun
Institution:1. State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China; 2. Hubei Qingjiang River Hydropower Development Company Ltd, Yichang 443002, China
Abstract:Optimal construction scheme of high concrete face rockfill dam(CFRD) is studied taking into account creep deformation of rockfill.The results show that creep characteristic of rockfill influence on deformation of dam bedding node under different construction schemes.The zone by zone character of various materials of a rockfill dam decides objectively the necessary existence of an optimal scheme for the construction of filling ascension works.The maximum normal displacement of the facial slab is small in the filling.Scheme where the rock-filling body ascends uniformly and its distribution along the slab slope is also rather uniform,which is favourable to the harmony between the deformations of slab and pad layer beneath it.From the view of the majorized filling scheme,it is suggested that the rolling and compacting construction procedure producing uniform ascension of filling shall be used for high rockfill dams.
Keywords:concrete face rockfill dam  creep  construction process  FEM  numerical simulating analysis
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号