首页 | 本学科首页   官方微博 | 高级检索  
     检索      

非满配重水钻井井壁筒竖向结构稳定的理论研究
引用本文:牛学超,洪伯潜,杨仁树.非满配重水钻井井壁筒竖向结构稳定的理论研究[J].岩土力学,2006,27(11):1897-1901.
作者姓名:牛学超  洪伯潜  杨仁树
作者单位:1. 北京工业职业技术学院,建筑工程系,北京,100042;中国矿业大学(北京校区)力学与建筑工程学院,北京,100083
2. 煤炭科学研究总院,北京,100013
3. 中国矿业大学(北京校区)力学与建筑工程学院,北京,100083
摘    要:提出了国内广泛采用的悬浮下沉井壁钻井施工法有其深度极限的观点。分析了泥浆中的井壁筒在加入配重水(非满水)后井壁底接触岩石时的受力状态;结合国内悬浮下沉井壁钻井法的工艺特点,建立了泥浆中的井壁筒为有底管状自重压杆的力学模型;以能量法为基础,利用结构稳定理论和流体力学理论原理,推导了非满配重水井壁筒竖向结构稳定临界高度的解析式,并给出了典型算例;强调了工程设计中利用该公式的注意事项,并指出进一步研究这一问题的内容和方法。

关 键 词:悬浮下沉井壁  钻井井筒  液体中的自重压杆  结构稳定
文章编号:1000-7598(2006)11-1897-05
收稿时间:2004-11-15
修稿时间:2004年11月15

Study on vertical structural stability of bored shafts filled part of water
NIU Xue-chao,HONG Bo-qian,YANG Ren-shu.Study on vertical structural stability of bored shafts filled part of water[J].Rock and Soil Mechanics,2006,27(11):1897-1901.
Authors:NIU Xue-chao  HONG Bo-qian  YANG Ren-shu
Institution:1. Department of Architecture Engineering, Beijing Vocational and Technical Institute of Industry, Beijing 100042, China; 2. School of Mechanics and Civil Engineering, China University of Mining and Technology(Beijing), Beijing 100083, China; 3. China Coal Research Institute, Beijing 100013, China
Abstract:The concept of depth limit for the method applied to sinking of shaft lining by means of floatation in shaft boring that is widely utilized in mine construction in China was put forward.The mechanical state of shaft lining filled part of water when its pan touching the base rock of shaft bottom was analyzed.Contacting with the technical characteristic of shaft lining sinking by means of floatation,the calculation model of shaft lining filled part of water in mud before fixed,as a self-gravitating bar in liquid,was set-up.Based on energy methods as well as the principle of structural stability theory and hydromechanics theory,the analytical equation for vertical structure stability critical height of shaft cylinder filled part of water was calculated.A typical example was persuasively analyzed.The attention to use the equation was emphasized in shaft design and its construction.Finally,its further research contents and direction are pointed out.
Keywords:sinking of shaft lining by means of floatation  bored shaft  self-gravitating bar  structural stability
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文