首页 | 本学科首页   官方微博 | 高级检索  
     检索      

超大直径土压平衡盾构土舱压力和开挖面水土压力分布特性研究
引用本文:侯永茂,杨国祥,葛修润,郑宜枫,顾沉颖.超大直径土压平衡盾构土舱压力和开挖面水土压力分布特性研究[J].岩土力学,2012,33(9):2713-2718.
作者姓名:侯永茂  杨国祥  葛修润  郑宜枫  顾沉颖
作者单位:1.上海交通大学 土木工程系,上海 200240;2.上海隧道工程股份有限公司,上海 200082
基金项目:上海市博士后基金项目资助(No.11r21421200)
摘    要:土压平衡盾构土舱压力的设定对于控制盾构掘进对周围环境影响意义重大。结合某超大直径隧道工程,在土舱隔板和盾构掘进断面上埋设水、土压力计,对土压平衡盾构土舱内和开挖面上的水、土压力的分布和变化情况进行研究。监测结果揭示了土压平衡盾构掘进过程中土舱压力和开挖面水、土压力分布和发展特性。结合盾构施工参数进行研究,发现土舱压力增量可以通过螺旋机转速、盾构掘进速度等施工参数计算得到。开挖面上水、土压力无法完全传递至土舱隔板,土舱压力增量约为开挖面总应力增量的76.3%。研究成果为超大直径土压平衡盾构的土舱压力设定提供了有价值的参考。

关 键 词:土压平衡盾构  开挖面水、土压力  土舱压力
收稿时间:2011-05-16

Study of distribution properties of water and earth pressure at excavation face and in chamber of earth pressure balance shield with super-large diameter
HOU Yong-mao , YANG Guo-xiang , GE Xiu-run , ZHENG Yi-feng , GU Chen-ying.Study of distribution properties of water and earth pressure at excavation face and in chamber of earth pressure balance shield with super-large diameter[J].Rock and Soil Mechanics,2012,33(9):2713-2718.
Authors:HOU Yong-mao  YANG Guo-xiang  GE Xiu-run  ZHENG Yi-feng  GU Chen-ying
Institution:1. Department of Civil Engineering, Shanghai Jiaotong University, Shanghai 200240, China; 2. Shanghai Tunnel Engineering Co., Ltd., Shanghai 200082, China
Abstract:The chamber pressure control is a key operation for controlling the impact of the earth pressure balance(EPB) shield excavation on the environment.Based on the monitored data,the water and earth pressure distribution properties in chamber and at the excavation face of a super-huge diameter EPB shield tunneling are studied.According to the construction parameters analysis,it is found that the increment of chamber pressure could be calculated by the construction parameters,such as rotation speed of screw conveyor and advancement rate.In addition,the water and earth pressure at excavation face could not be transfer to the chamber completely,and the transmissibility is about 76.3%.The research results of this paper provide valuable references for the setting method of the chamber pressure of the super-huge diameter EPB shield.
Keywords:earth pressure balance shield  water and earth pressure at excavation face  chamber pressure
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号