首页 | 本学科首页   官方微博 | 高级检索  
     检索      

降雨诱发滑坡阶跃型变形的预测分析及应用
引用本文:黄晓虎,雷德鑫,夏俊宝,易武,张鹏.降雨诱发滑坡阶跃型变形的预测分析及应用[J].岩土力学,2019,40(9):3585-3592.
作者姓名:黄晓虎  雷德鑫  夏俊宝  易武  张鹏
作者单位:1. 三峡大学 湖北省防灾减灾重点实验室,湖北 宜昌 443002;2. 三峡地区地质灾害与生态环境湖北省创新协同中心,湖北 宜昌 443002; 3. 三峡大学 湖北长江三峡滑坡国家野外科学观测研究站,湖北 宜昌 443002;4. 兴山县国土资源局,湖北 宜昌 443711
基金项目:国家青年科学基金项目(No.41502291);三峡大学防灾减灾湖北省重点实验室开放基金(No.2018KJZ05,No.2017KJZ05)
摘    要:滑坡进入蠕动变形阶段之后,往往难以及时开展勘察治理工作,合理的临灾预警是有效减少滑坡灾害损失的重要手段。首先确定降雨诱发“阶跃型”滑坡的预警关键判据为前期降雨、当次降雨、位移速率,并引入“一个降雨过程”定义滑坡监测的降雨区间,将预警过程分为当次降雨和前期降雨+当次降雨两种模式。然后运用最小二乘法确定滑坡“阶跃”变形曲线上的“破坏拐点”和“稳定拐点”用以确定变形加速区间,以此求解前期降雨、当次降雨以及移速率阈值。最后以王家坡滑坡为例,设计了两种模式下的5级递进式分级预警模型。研究表明:(1)前期降雨与当次降雨组成“一个降雨过程”的时间间隔为7 d;(2)王家坡滑坡的位移速率阈值为20 mm/d;(3)前期降雨+当次降雨模式下王家坡滑坡的前期降雨、当次降雨阈值分别为10、15 mm,当次降雨模式下王家坡滑坡的降雨阈值为25 mm。

关 键 词:“阶跃型”滑坡  一个降雨过程  阈值  临灾预警系统  
收稿时间:2018-07-05

Forecast analysis and application of stepwise deformation of landslide induced by rainfall
HUANG Xiao-hu,LEI De-xin,XIA Jun-bao,YI Wu,ZHANG Peng.Forecast analysis and application of stepwise deformation of landslide induced by rainfall[J].Rock and Soil Mechanics,2019,40(9):3585-3592.
Authors:HUANG Xiao-hu  LEI De-xin  XIA Jun-bao  YI Wu  ZHANG Peng
Abstract:After the landslide enters the creep deformation stage, it is usually difficult to carry out the investigation and management of the landslide in a timely manner. A reasonable early warning system becomes an important means for effectively reducing landslide hazards. This paper first determined that the key early warning criteria for stepwise landslide induced by rainfall: previous rainfall, current rainfall, and displacement rate. Moreover, one rainfall process is introduced to define the rainfall interval for landslide monitoring, and the warning process is divided into two modes of the previous-current rainfall and the current rainfall. Then the least squares method is used to define the failure inflection point and the stability inflection point on the displacement deformation curve of the stepwise landslide. Thus, the deformation acceleration interval of the landslide is determined to solve the previous rainfall, the current rainfall and the displacement rate threshold. Finally, taking the Wangjiapo landslide as an example, this paper designs the five-level progressive early warning system under two modes. The results show that: (1) the time interval of a rainfall process constituted by the previous rainfall and the current rainfall is 7 days; (2) the displacement rate threshold of Wangjiapo landslide is 20 mm/d; (3) in the mode of the previous-current rainfall, the previous rainfall threshold and the current rainfall threshold of the Wangjiapo landslide are 10 mm and 15 mm, respectively, and the rainfall threshold of the Wangjiapo landslide under the current rainfall mode is 25 mm.
Keywords:‘stepwise’ landslide  one rainfall process  threshold value  early warning system  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号