首页 | 本学科首页   官方微博 | 高级检索  
     检索      

帕隆藏布江特大型泥石流的成灾模式及防治对策——以扎木镇-古乡段为例
引用本文:曾庆利,杨志法,张西娟,尚彦军,张路青.帕隆藏布江特大型泥石流的成灾模式及防治对策——以扎木镇-古乡段为例[J].中国地质灾害与防治学报,2007,18(2):27-33.
作者姓名:曾庆利  杨志法  张西娟  尚彦军  张路青
作者单位:1. 中国科学院地质与地球物理研究所工程地质力学重点实验室,北京,100029
2. 中国地质科学院地质力学研究所,北京,100081
基金项目:国家重点基础研究发展计划(973计划)
摘    要:文章通过对雅鲁藏布江的Ⅰ级支流—帕隆藏布江扎木镇-古乡段辫状水系地貌的研究,认为其与两岸支谷发育的泥石流群有关。通过对位于该河段下游的古乡沟和上游的地质弄巴泥石流特征的重点剖析,发现了特大型泥石流发育的2个重要特征,即支谷上游冰蚀围谷中赋存大量巨厚古今冰碛物和支谷中游峡谷段大型崩塌滑坡坝溃决。提出了特大型泥石流的成灾模式,并以该成灾模式解释了2000年易贡巨型滑坡堵江事件。最后,提出了基于上述成灾模式的帕隆藏布江流域特大型泥石流灾害防治的原则和方法。

关 键 词:冰碛物  滑坡坝溃决  成灾模式  古乡沟泥石流  易贡滑坡  川藏公路
文章编号:1003-8035(2007)02-0027-07
收稿时间:2006-07-06
修稿时间:2006-07-062006-09-11

Hazard model and countermeasure to super-large debris-flow in Parlung River——Case study of the section from Zamu Town to Guxiang Gully
ZENG Qing-li,YANG Zhi-fa,ZHANG Xi-juan,SHANG Yan-jun,ZHANG Lu-qing.Hazard model and countermeasure to super-large debris-flow in Parlung River——Case study of the section from Zamu Town to Guxiang Gully[J].The Chinese Journal of Geological Hazard and Control,2007,18(2):27-33.
Authors:ZENG Qing-li  YANG Zhi-fa  ZHANG Xi-juan  SHANG Yan-jun  ZHANG Lu-qing
Institution:1. Key Laboratory of Engineering Geomechanics of Institute of Geology and Geophysics, Chinese Academy of Science, Beijing 100029, China; 2. Institute of Geomechanics, Chinese Academy of Geosciences, Beijing 100081, China
Abstract:Sichuan-Tibet highway has been seriously destroyed and endangering by super-large debris flows.Based on the study of the plait river of the segment from Zamu town to Guxiang gully in Parlung River,the first branch of Yarlu River,it is believed that the plait river is related to the large debris-flow fans from the tributary gullies of Parlung River.Based on the analysis to the 1953 super-large debris flow of Guxiang Gully and the super-large ancient debris flow of Dizhinongba Gully,it is discovered that the development of super-large debris flows in the segment has two important and common characteristics.That is,the large amount and huge thick glacial tills in the glacial cirque,and large avalanche and landslide dam-breach in the middle canyon of the tributaries of the Parlung River.The model of super-large debris-flow hazards is put forwards,and it is utilized to interpret Yigong Super-large Landslide in 2000 which is larger than the debris flow of Guxiang Gully in 1953 in scale.In the end,the paper puts forwards the principles and methods of preventing and countermeasure the super-large debris flow hazards in Parlung River or along Sichuan-Tibet highway.
Keywords:glacial tills  landslide dam breach  hazards model  Guxiang debris flow  Yigong Landslide  Parlung River  Sichuan-Tibet Highway
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号