首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Drilling Technology of the M-1 Well in Hot Dry Rock of Matouying,Tangshan北大核心CSCD
引用本文:张云,高亮,刘现川,赵岩,王德,张建永.Drilling Technology of the M-1 Well in Hot Dry Rock of Matouying,Tangshan北大核心CSCD[J].地质与勘探,2022,58(1):176-186.
作者姓名:张云  高亮  刘现川  赵岩  王德  张建永
作者单位:河北省煤田地质局第二地质队,河北邢台 054001
基金项目:河北省煤田地质局一般公共预算资金项目(编号:343-0401-JBN-POPL)资助
摘    要:This paper presents the general situation and key techniques of the drilling well M-1 in Matouying dry hot rock exploration hole, Leting, Tangshan, Hebei Province. A series of problems have been studied on the sea water drilling fluid, high temperature resistant fresh water drilling fluid, screw composite drilling technique, screw hole coring technology, and high temperature, thus solving the difficulty of sea water drilling fluid well protection, poor stability of drilling fluid under high temperature, and low efficiency in hot dry rock drilling and coring drilling to ensure the safety of the borehole and improve drilling efficiency. The high temperature resistant double condensation and double density cement slurry system and relevant technical measures are adopted to ensure the quality of cementing in the high temperature environment. Through the understanding and analysis of the strata in this area, this work provides valuable experience for drilling in the same strata in the future. The final hole depth of the M-1 well in Matouying is 4502. 11m, and hot dry rock with a temperature of 150t is found at 3965 m, which is the first hot dry rock well with a temperature of more than 150°C in the Beijing-Tianjin-Hebei region so far. © 2022 Editorial Board of Geology and Exploration. All rights reserved.

关 键 词:干热岩  M-1井  海水钻井液  聚合物钻井液  螺杆复合钻进  取心  固井
收稿时间:2021/5/12 0:00:00
修稿时间:2021/7/13 0:00:00

Drilling technology of M-1 well in hot dry rock of Matouying, Tangshan
ZHANG Yun,GAO Liang,LIU Xianchuan,ZHAO Yan,WANG De,ZHANG Jianyong.Drilling technology of M-1 well in hot dry rock of Matouying, Tangshan[J].Geology and Prospecting,2022,58(1):176-186.
Authors:ZHANG Yun  GAO Liang  LIU Xianchuan  ZHAO Yan  WANG De  ZHANG Jianyong
Institution:No.2 Team, Hebei Coalfield Geological Bureau, Xingtai, Hebei
Abstract:
Keywords:dry hot rock  M-1 well  seawater drilling fluid  polymer drilling fluid  screw composite drilling    coring  well cementation
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《地质与勘探》浏览原始摘要信息
点击此处可从《地质与勘探》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号