首页 | 本学科首页   官方微博 | 高级检索  
     检索      

矿床数学—经济模型及其在元江金矿的应用
引用本文:燕永锋,秦德先.矿床数学—经济模型及其在元江金矿的应用[J].矿物学报,2001,21(4):619-624.
作者姓名:燕永锋  秦德先
作者单位:昆明理工大学,国土资源工程学院,矿产地质研究所,
基金项目:云南省院省校科技合作项目 (YK980 0 8 3)
摘    要:利用地质统计学的原理和方法,编制出矿床数学-经济模型软件包,它作为一种储量计算和矿床经济评价方法。介绍了该软件包各模块的功能,并以元江金矿应用为例,展示了该软件包的功能及效果。

关 键 词:矿床数学-经济模型  储量计算  云南  金矿床  软件包  地质统计学
文章编号:1000-4734(2001)04-0619-06
修稿时间:2001年10月24

GEOSTATISTICS AND ITS APPLICATION IN YUANJIANG GOLD DEPOSIT
Yan Yongfeng,Qin Dexian.GEOSTATISTICS AND ITS APPLICATION IN YUANJIANG GOLD DEPOSIT[J].Acta Mineralogica Sinica,2001,21(4):619-624.
Authors:Yan Yongfeng  Qin Dexian
Abstract:Geostatistics is a new cross discipline subject developed in recent forty years. It was introduced into our country in 1977 and was given much attention. But it hasn't been used widely for number reasons. The program of special software has been the major reason. The researchers at Kunming University of Science & Technology programmed the Deposit Mathematics Economy Modeling software. As a method of reserve estimation and economical evaluation of the deposit, the software has been used widely for its advance and utility. In the Dachang tin mine of Guangxi, the Yuanjiang gold mine, Yimen copper mine, Dayao copper mine and Jinning Phosphorus mine of Yunnan Province, and so on, there have yielded remarkable results. In this paper, on the basis of the theory and development of geostatistics, the functions of each model of the software are discussed and the software application is introduced by taking the Yuanjiang gold mine for example. The mathematical model of the Yuanjiang gold deposit is composed of surface model, rock model and grade model. It is established by taking gold grade as regionalized variables. With the model, gold reserves and mean grades are estimated. In the Yuanjiang gold mine, primary orebody occurs in thinner vein, mining has a high povertilized rate, a low lixiviating rate and costs a lot, while oxidized ore is easily exploited and lixiviated, with low cost and good benefit on a large scale. So exploiting the oxidized ore should be in the first place. And with the improvement of technology in ore dressing and smelting and the reduction of cost, the boundary grade can be depressed. Through establishing deposit model to optimize industrial targets and recalculate reserves, the gold reserve has been increased by about 10 tons.
Keywords:Deposit Mathematics  Economy Modeling  reserve estimation  Yuanjiang gold mine  Yunnan
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号