防震措施在给排水灾后重建中的运用 |
| |
引用本文: | 梁晓媚,胡晓东,杨素云,许艳.防震措施在给排水灾后重建中的运用[J].中国勘察设计,2014(2):64-67. |
| |
作者姓名: | 梁晓媚 胡晓东 杨素云 许艳 |
| |
作者单位: | 广东省建工设计公司 |
| |
摘 要: | 在灾后给排水重建工程中,及时总结运用各项防震措施,在科学重建中达到"小震不坏,大震不倒,震后可修"的效果。同时,还要防治因地震引发的次生灾害。
|
关 键 词: | 防震 给排水 科学重建 次生灾害 |
Applications of Shockproof Measures in the Drainage Post-earthquake Reconstruction |
| |
Abstract: | Applications of shockproof measures are sensibly summarized and utilized in the drainage post-earthquake reconstruction. Reconstruction is going on scientifically, and "no damage in small earthquake, no collapse in violent earthquake, moreover overhaul in post-earthquake" are achieved. And, secondary disasters are prevented caused by the earthquake. |
| |
Keywords: | shockproof drainage reconstruct scientifically secondary disaster |
本文献已被 CNKI 维普 等数据库收录! |
|