首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于无人机航测黄河源弯曲河道泥沙亏损量计算
引用本文:李志威,汤韬.基于无人机航测黄河源弯曲河道泥沙亏损量计算[J].水科学进展,2020,31(1):39-50.
作者姓名:李志威  汤韬
作者单位:长沙理工大学水利工程学院,湖南长沙410114;水沙科学与水灾害防治湖南省重点实验室,湖南长沙410114;长沙理工大学水利工程学院,湖南长沙410114
基金项目:国家自然科学基金资助项目(51979012);湖南省科技重大专项经费资助项目(2018SK1010)
摘    要:弯曲河流的河道冲淤变化在长时间尺度处于动态的平衡状况,其泥沙输移部分来自于凹岸冲刷与凸岸淤积的差值。2018年采用无人机航测获取黄河源典型弯曲河流(麦曲、哈曲、格曲和兰木错曲)连续弯道的低空影像数据,通过图像技术处理后生成高精度地形,进而提取单个弯道和连续弯道的断面地形,计算弯道凸、凹两侧断面面积和相邻断面间的差值。结果表明,凹岸侵蚀崩岸产生的泥沙量与凸岸点边滩淤积的泥沙量是不平衡的,即存在一个泥沙亏损量。对于单个弯道,兰木错曲单位河长的泥沙亏损量约为0.191 m^3,麦曲、哈曲和格曲单位河长的泥沙亏损量约为0.045 m^3,且相同河段的沿程亏损量具有不均匀性,其间接反映不同弯道横向的迁移速率具有差异性。

关 键 词:弯曲河道  崩岸  点边滩  泥沙亏损量  无人机航测  黄河源
收稿时间:2019-06-12

Calculation of bend-scale sediment balance in meandering rivers of Yellow River source based on UAV aerial survey
LI Zhiwei,TANG Tao.Calculation of bend-scale sediment balance in meandering rivers of Yellow River source based on UAV aerial survey[J].Advances in Water Science,2020,31(1):39-50.
Authors:LI Zhiwei  TANG Tao
Institution:1.School of Hydraulic Engineering, Changsha University of Science&Technology, Changsha 410114, China2.Key Laboratory of Water-Sediment Sciences and Water Disaster Prevention of Hunan Province, Changsha 410114, China
Abstract:Erosion-deposition changes of meandering channels are a dynamic equilibrium process in the long-term time scale. The part of sediment load transport is roughly equal the difference between bank erosion in concave bank and point bar deposition in convex bank. In summer 2018,the Unmanned Aerial Vehicle (UAV) aerial survey was used to obtain high-resolution imagery data in four meandering rivers of Yellow River source(i.e.,Maiqu,Haqu,Gequ,and Lanmucuo Rivers),and the high-resolution topographic dataset were produced by post-processing of the Structure-for-Motion technology. Channel topography of cross sections of single bend and subsequent bends are extracted using ArcGIS. The differences of the cross-sectional area between convex and concave bank zone are calculated in single section and adjacent sections of meandering channels. Results demonstrate that sediment loss amount generated by bank collapse on concave bank and sediment deposition amount on convex bank are imbalanced,i.e.,a net loss of sediment amount existing. For a single bend,the sediment loss per unit channel length in Lanmucuoqu River is about 0.191 m3,and about 0.045 m3 on average in Maiqu,Haqu,and Gequ Rivers. Nonetheless,the sediment loss in the reach scale of meandering channel is non-uniformity that indirectly reflects the difference in lateral migration rates among different bends.
Keywords:meandering channel  bank collapse  point bar  sediment balance  UAV aerial survey  Yellow River source  
本文献已被 维普 万方数据 等数据库收录!
点击此处可从《水科学进展》浏览原始摘要信息
点击此处可从《水科学进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号