首页 | 本学科首页   官方微博 | 高级检索  
     检索      

引水补源工程对黛溪河流域地下水补给效果浅析
作者姓名:万军伟  王明珠  刘志涛  杨亚宾  刘毅  赵书兴
作者单位:1.山东省地勘局第二水文地质工程地质大队,德州 253015;2.山东省鲁北地质工程勘察院,德州 253015
基金项目:邹平县水利局地方财政项目“邹平县地下水资源调查评价(编号: BZZPGP-2017-0063)”资助
摘    要:南水北调是国家级的重大水利工程,调水效果最终依赖于接收调水地区对调水的具体利用,引水补源工程是南水北调工程在邹平市的具体利用。为评价引水补源工程对黛溪河流域地下水的补给效果,在分析邹平市引水补源工程实施后黛溪河流域地下水资源的各个补给项的基础上,采用水均衡法计算各个地下水补给量,确定了黛溪河流域引水补源的总补给量。将总补给量视为本区地下水可开采资源量,将地下水可开采资源量与本区用水所需的地下水开采量相比较,对本区地下水资源可开采潜力进行了评价,论证了引水补源工程可有效缓解区内地下水超采问题。另外,还充分利用年地下水动态和多年地下水位动态变化等监测资料,揭示了引水补源工程对区内地下水的有效补充作用,为区内合理开发利用地下水资源提供了依据。

关 键 词:水均衡法  黛溪河流域  引水补源工程  地下水补给效果  地下水资源评价  
收稿时间:2020-04-28

Analysis of the effect of Water Diversion and Source Supplement Project on groundwater recharge in Daixi River Basin
Authors:WAN Junwei  WANG Mingzhu  LIU Zhitao  YANG Yabin  LIU Yi  ZHAO Shuxing
Institution:1. No.2 Hydrogeology and Engineering Geology Brigade, Shandong Exploration Bureau of Geology and Mineral Resources, Dezhou 253015, China;2. Lubei Geo-engineering Exploration Institute, Dezhou 253015, China
Abstract:The South-to-North Water Diversion Project is a major national water conservancy project, but the effect of the water transfer depends on the utilization of water in the receiving areas. Water Diversion and Source Supplement Project is a specific utilization of the South-to-North Water Diversion Project in Zouping City. In order to analyze the effect of Water Diversion and Source Supplement Project on groundwater recharge in Daixi River Basin, the authors adopted the water balance method to calculate the groundwater recharge and total recharge of water diversion sources, based on the analysis of the groundwater recharge items in Daixi River Basin after carrying out this project. The total recharge is regarded as the amount of exploitable groundwater resources. The exploitable potential of groundwater resources in this area is evaluated by the comparison of the amount of exploitable groundwater resources and the actual amount of groundwater exploitation, and the effect of Water Diversion and Source Supplement Project on the over-exploitation of groundwater on the remission area was also demonstrated. Besides, the effective replenishment effect of this project on the groundwater in the study area was also revealed based on the annual groundwater and multi-year groundwater level dynamic monitoring data, which provides some reference for the rational development and utilization of groundwater resources in this region.
Keywords:water balance method  Daixi River Basin  Water Diversion and Source Supplement Project  groundwater recharge effect  groundwater resources assessment  
点击此处可从《》浏览原始摘要信息
点击此处可从《》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号