首页 | 本学科首页   官方微博 | 高级检索  
     检索      

交城断裂交城县城段的位置及其与地裂缝的关系
引用本文:徐扬,赵晋泉,张大卫,杨政.交城断裂交城县城段的位置及其与地裂缝的关系[J].山西地震,2006(1):1-5.
作者姓名:徐扬  赵晋泉  张大卫  杨政
作者单位:1. 山西省地震局,山西,太原,030021
2. 山西省孝义市地震局,山西,孝义,032300
摘    要:交城断裂为太原盆地西界的主控边界断裂,为查明交城断裂在这一地区的确切位置和地裂缝与交城断裂的关系,采用地震地质调查和人工地震勘探对在此范围内交城断裂的具体位置和地层错断情况进行了详细研究。结果表明,交城断裂交城县城段并不是位于基岩隆起区与盆地倾斜平原的分界处,而是位于距该分界东南约200 m处。交城县城西北侧的地裂缝与地震勘探在这一带所探查到的交城断裂的位置相当吻合,由此可以推断地裂缝的产生与交城断裂有关,属构造地裂缝。指出,在进行活动断裂附近的城市规划或重大工程建设时应对“山根”的倒退现象予以高度重视。

关 键 词:活动断裂  地裂缝  地震勘探  交城断裂
文章编号:1000-6265(2006)01-0001-05
收稿时间:2005-07-10
修稿时间:2005-07-15

Study on Location of the Segment of Urban Jiaocheng County of Jiaocheng Fault and the Relationship between It and The Terra Cracks
XU Yang,ZHAO Jin-quan,ZHANG Da-wei,YANG Zheng.Study on Location of the Segment of Urban Jiaocheng County of Jiaocheng Fault and the Relationship between It and The Terra Cracks[J].Earthquake Research in Shanxi,2006(1):1-5.
Authors:XU Yang  ZHAO Jin-quan  ZHANG Da-wei  YANG Zheng
Institution:1. Seismological Bureau of Shanxi Province, Shanxi, Taiyuan 030021, China; 2. Seismological Bureau of Xiaoyi City of Shanxi Province, Shanxi, Xiaoyi 032300,China
Abstract:Jiaocheng fault is the main control boundary fault of the west boundary of Taiyuan basin.Accurate location and stratigraphic fault of Jiaocheng fault in the range are detailedly studied by seismogeological investigation and artificial seismic(prospecting,)in order to find out true location of Jiaocheng fault in the area and the relationship between terra crack and Jiaocheng fault.The result indicates that the segment of urban Jiaocheng county of Jiaocheng fault is not located at dividing line of bedrock dome area and inclining plain of basin,but located at 200 meters south east to the boundary.Terra cracks in the north west of urban Jiaocheng county quite tally with the location of Jiaocheng fault ascertained by seismic prospecting in the area.It is concluded that the generation of terra crack is related to Jiaocheng fault and the terra crack belongs to tectonic terra crack.It is pointed that the phenomenon of "mountain foot go back" should be highly paid attention as city planning and important engineering construction near active fault are to be carried through.
Keywords:Active fault  Terra crack  Seismic prospecting  Jiaocheng fault  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号