棋盘石隧道断裂破碎带地震动力响应分析
引用本文:刘子阳,曹小平,严松宏,邓稀肥,邬家林,陈涛.棋盘石隧道断裂破碎带地震动力响应分析[J].世界地震工程,2019,35(3):161-167.
作者姓名:刘子阳  曹小平  严松宏  邓稀肥  邬家林  陈涛
作者单位:1. 兰州交通大学 甘肃省道路桥梁与地下工程重点实验室, 甘肃 兰州 730070;2. 兰州交通大学 道桥工程灾害防治技术国家地方联合工程实验室, 甘肃 兰州 730070;3. 中国中铁四局集团城市轨道交通工程分公司, 安徽 合肥 230022
摘    要:以棋盘石穿越断层破碎带段隧道为背景,采用理论计算与数值模拟相结合的方法,对棋盘石隧道在汶川波作用下的地震响应分析进行了系统研究。探讨了断层破碎带衬砌在地震荷载作用下的破坏方式,并且把数值模拟结果与汶川特大地震震害的公路隧道进行对比分析。结果表明:用松动圈折减系数法估算出衬砌最大弯矩和剪力的数值与数值模拟的结果基本一致,验证了MIDAS/GTS-NX模拟隧道地震时程分析的可行性;同时根据对有限元模型进行时程分析的结果,探讨了断层破碎带处衬砌的破坏方式,并提出合理可行的防治及加固措施。

关 键 词:断层破碎带  汶川地震波  动力响应分析  MIDAS/GTS-NX

Seismic dynamic response analysis of fault fracture zonein Qipanshi Tunnel
LIU Ziyang,' target="_blank" rel="external">,CAO Xiaoping,' target="_blank" rel="external">,YAN Songhong,' target="_blank" rel="external">,DENG Xifei,WU Jialin,CHEN Tao.Seismic dynamic response analysis of fault fracture zonein Qipanshi Tunnel[J].World Information On Earthquake Engineering,2019,35(3):161-167.
Authors:LIU Ziyang  " target="_blank">' target="_blank" rel="external">  CAO Xiaoping  " target="_blank">' target="_blank" rel="external">  YAN Songhong  " target="_blank">' target="_blank" rel="external">  DENG Xifei  WU Jialin  CHEN Tao
Institution:1. Key Laboratory of Road & Bridges and Underground Engineering of Gansu Province, LanzhouJiaotong University, Lanzhou 730070, China;2. National and Provincial Joint Engineering Laboratory of Road & Bridge Disaster Prevention and Control, Lanzhou Jiaotong University, Lanzhou 730070, China;3. Urban Rail Transit Engineering Branch Co., LTD. of CTCE Group, Hefei 230041, China
Abstract:Based on the background of Qipanshi tunnel crossing fault fractured zone, the seismic response of the tunnel under Wenchuan seismic wave was systematically studied by combining theoretical calculation with numerical simulation. The failure modes of lining in fault fracture zone under seismic load were discussed, and the numerical simulation results were compared with other highway tunnels which were damaged by the Wenchuan great earthquake. The results show that the maximum bending moment and shear force of lining estimated by the method of loose-ring reduction coefficient are basically consistent with the numerical simulation results, which verifies the feasibility of acceleration time history analysis of MIDAS/GTS-NX tunnel. Meanwhile, according to the result of time history analysis of finite element model, the failure modes of lining in fault fracture zone were discussed, and the reasonable and feasible prevention and reinforcement measures were put forward.
Keywords:fault fracture zone  Wenchuan seismic wave  dynamic response analysis  MIDAS/GTS-NX