首页 | 本学科首页   官方微博 | 高级检索  
     检索      

莱芜市破解用地瓶颈措施解析
引用本文:黄涛,孟光明,刘文鹏.莱芜市破解用地瓶颈措施解析[J].山东国土资源,2013,29(10).
作者姓名:黄涛  孟光明  刘文鹏
作者单位:芜市国土资源局;芜市国土资源局;芜市国土资源局
摘    要:当前,国家收紧地根,从严控制新增建设用地指标成为各地建设项目顺利落地的制约瓶颈。为破解这一难题,结合莱芜实际,分析了规划修编、指标利用、挖潜存量、加快供地等做法,对保障项目用地提出了建议和对策。

关 键 词:项目用地  破解  瓶颈制约  莱芜市

Study on Soluting Contradiction between Land Supply and Demand in Laiwu City
HUANG Tao,MENG Guangming and LIU Wenpeng.Study on Soluting Contradiction between Land Supply and Demand in Laiwu City[J].Land and Resources in SHANDONG Province,2013,29(10).
Authors:HUANG Tao  MENG Guangming and LIU Wenpeng
Abstract:At present, countries have tightened the foot of the land, and controlled new construction land strictly which will become the restrict of construction projects. In order to solve this problem, combining with practical conditions in Laiwu city, planning revision, index utilization, potentiality stock and land supplyand have been analyzed. Some suggestions and countermeasures are put forward to gurantee project land use.
Keywords:Project land use  crack  bottleneck  Laiwu city
点击此处可从《山东国土资源》浏览原始摘要信息
点击此处可从《山东国土资源》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号