首页 | 本学科首页   官方微博 | 高级检索  
     检索      

山洪泥石流风险评估与风险管理理论与方法
引用本文:崔鹏,邹强.山洪泥石流风险评估与风险管理理论与方法[J].地理科学进展,2016,35(2):137-147.
作者姓名:崔鹏  邹强
作者单位:1. 中国科学院山地灾害与地表过程重点实验室/中国科学院成都山地灾害与环境研究所,成都 610041
2. 西南科技大学环境与资源学院,四川 绵阳 621010
3. 中国科学院青藏高原地球科学卓越创新中心,北京 100101
基金项目:国家自然科学基金国际合作与交流重点项目(41520104002);中国科学院重点部署项目(KZZD-EW-05-01);四川省科技计划项目(2014SZ0163)
摘    要:山洪泥石流是中国常见的自然灾害,充分认识其形成机制与潜在风险是防灾减灾的关键。本文阐述了山洪泥石流形成机理,以及风险分析与管理的方法和内容,系统认识了地表产流流量激增、土体破坏物质供给激增、沟道堵塞体级联溃决流量放大和动床侵蚀规模增大等4个山洪泥石流的形成过程,介绍了基于动力过程的山洪泥石流风险评估方法和承灾体易损性评估方法,构建了基于灾害动力过程的风险评估与风险制图方法。进而,基于风险评估结果,提出可用于具体灾害点减灾的风险管理内容和风险调控技术、灾害防治的工程与非工程措施与制技术方案。最后,重点讨论了包括灾害风险预测、临灾预案、灾害防治工程方案等内容的风险处置对策,并形成一套基于山洪泥石流动力过程的风险评估与风险管理理论与方法体系。

关 键 词:泥石流  山洪  危险性  易损性  风险评估  风险管理  动力过程  
收稿时间:2015-12-01

Theory and method of risk assessment and risk management of debris flows and flash floods
Peng CUI,Qiang ZOU.Theory and method of risk assessment and risk management of debris flows and flash floods[J].Progress in Geography,2016,35(2):137-147.
Authors:Peng CUI  Qiang ZOU
Institution:1. Key Laboratory of Mountain Hazards and Earth Surface Process/Institute of Mountain Hazards and Environment, CAS, Chengdu 610041, China
2. School of Environmental and Resource, Southwest University of Science and Technology, Mianyang 621010, Sichuan, China
3. Center for Excellence in Tibetan Plateau Earth Sciences, CAS, Beijing 100101, China
Abstract:Debris flows and flash floods are widely distributed mountain hazards in China. Effective hazard mitigation and prevention require understanding of hazards formation mechanisms and their potential risks. This article elaborates on the formation mechanism, risk analysis, and risk management of debris flows and flash floods. Surface runoff and material supply volume incensement, hazard scale amplification due to outburst of multiple channel blockages and bed erosion as hazard formation mechanism are discussed. Base on the dynamic process of debris flows and flash floods as well as vulnerability assessment of elements at risk, methods of risk assessment and mapping are proposed. Comprehensive engineering and non-engineering measures for hazards control shall be guided by the result of risk analysis that identifies the hazardous level of debris flows and flash floods and incorporates the vulnerability of different elements at risk. Finally, this article discusses strategies when facing risk of these hazards and puts forward a risk management system that involves the participation of local communities.
Keywords:debris flow  flash flood  hazard analysis  vulnerability  risk assessment  risk management  dynamic process  
本文献已被 CNKI 等数据库收录!
点击此处可从《地理科学进展》浏览原始摘要信息
点击此处可从《地理科学进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号