首页 | 本学科首页   官方微博 | 高级检索  
     检索      

辽宁省大窑湾某建筑场地岩溶发育特征及工程地质条件评价
引用本文:郭长宝,郭书泰,彭 涛,李耀刚,崔雪涛,郭 印,王树东.辽宁省大窑湾某建筑场地岩溶发育特征及工程地质条件评价[J].中国岩溶,2010,29(2):176-182.
作者姓名:郭长宝  郭书泰  彭 涛  李耀刚  崔雪涛  郭 印  王树东
作者单位:1. 中国地质科学院地质力学研究所,北京,100081;建设综合勘察研究设计院有限公司,北京,100007
2. 建设综合勘察研究设计院有限公司,北京,100007
基金项目:中国地质科学院地质力学研究所基本科研业务费、建设综合勘察研究设计院有限公司科技发展基金 
摘    要:辽宁省大窑湾地区某建筑场地内基岩为可溶性中等~强的碳酸盐岩,岩体裂隙发育,在海水入侵、潜水与岩溶裂隙水等共同作用下,岩溶发育较强烈。本场地勘察揭露溶洞的见洞率70.27%。溶洞多发育于地表下20~30 m之间,其次为30~40 m。本文根据揭露溶洞的大小将溶洞分成大型溶洞(洞高≥4 m)、中偏大型溶洞(2 m≤洞高4 m)、中型溶洞(0.5 m≤洞高2 m)和小型溶洞(洞高0.5m)等四类,分析表明本场地内溶洞以中型溶洞为主,其次为小型溶洞和中偏大型溶洞,岩溶的发育和分布对场地工程地质条件影响较大。本文围绕场地岩溶发育这一主要工程地质问题,从岩溶发育的地质背景、形成条件、分布特点等方面对场地内的岩溶发育特征进行了分析研究,认为本场地属于岩溶中等~强发育的复杂的岩溶红粘土地基,需采取CFG桩、振冲碎石桩复合地基或采用桩基等措施对地基进行处理,以保证工程安全。

关 键 词:岩溶地基  海水入侵  溶蚀作用  溶洞  地基处理  工程地质评价  辽宁大窑湾地区
收稿时间:2009/2/10 0:00:00

Appraisal of the karst development features and engineering geology conditions at a building site in Dayaowan, Liaoning Province
GUO Chang-bao,GUO Shu-tai,PENG Tao,LI Yao-gang,CUI Xue-tao,GUO Yin and WANG Shu-dong.Appraisal of the karst development features and engineering geology conditions at a building site in Dayaowan, Liaoning Province[J].Carsologica Sinica,2010,29(2):176-182.
Authors:GUO Chang-bao  GUO Shu-tai  PENG Tao  LI Yao-gang  CUI Xue-tao  GUO Yin and WANG Shu-dong
Institution:1.Institute of Geomechanics,Chinese Academy of Geological Sciences,Beijing 100081,China;2.China Institute of Geotechnical Investigation and Surveying LTD.,Beijing 100007,China)
Abstract:The major bedrocks in Dayaowan are moderate to strong soluble carbonate rock with well developed fissure,so karst is strongly developed under the impact of sea water and groundwater as well as karst fissure water.The surveying drilling proves that the karst cavity discovering rate is 70.27%.The cavities mainly distribute between 20~30 m underground,and between 30~40 m secondly.The karst cavities are divided into 4 classes according to their size(h) in this article: the large scale(h≥4 m),the medium to large scale(2 m≤h4 m),the medium(0.5 m≤h2 m) and the small(h0.5 m).The statistic result indicates that karst cavities in the location are mainly the medium ones,and secondly are the small or the medium to large scale ones.The growth and distribution of the karst cavities seriously affect the engineering geology conditions of the building site.Regarding the karsts as the major engineering geology problem,the background and forming conditions as well as distribution of karst at the building site are analyzed and evaluated in the paper.Accordingly,it is believed that the groundwork of the building site is karst laterite with moderately or strongly developed karst and the CFG and Vibratory Crushed stone composite piled foundation or some appropriate piled foundation etc.should be adopted in disposal this kind of groundwork in order to keep the engineer safe.
Keywords:karst groundwork  seawater encroachment  dissolution  karst cavity  groundwork treatment  engineering geology appraisal  Dayaowan in Liaoning
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《中国岩溶》浏览原始摘要信息
点击此处可从《中国岩溶》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号