首页 | 本学科首页   官方微博 | 高级检索  
     检索      

深埋长隧洞前期勘查中工程地质调查与CSAMT异常分析
引用本文:茅均标,伍法权,底青云,柴建峰.深埋长隧洞前期勘查中工程地质调查与CSAMT异常分析[J].现代地质,2006,20(3):513-518.
作者姓名:茅均标  伍法权  底青云  柴建峰
作者单位:1. 中国地质大学,工程技术学院,北京,100083
2. 中国科学院,地质与地球物理研究所,北京,100029
摘    要:在南水北调西线一期工程玛柯河—贾曲段工程地质勘察过程中,充分利用地球物理资料,实现地质与地球物理的有机结合。依据区域地质条件、岩石电性特征和岩层的沉积环境,按电阻率的高低范围及变化特征将13 km长的CSAMT电阻率断面划分为4个不同部分进行解译,其中,断层破碎带的解释结果与野外岩石露头所反映的地质信息吻合较好。作为一项新物探技术,CSAMT法可为分析工程地质问题提供基础资料,具有较好的应用前景。

关 键 词:南水北调西线一期工程  CSAMT  深埋长隧洞  电阻率  超前预报
文章编号:1000-8527(2006)03-0513-06
收稿时间:01 13 2006 12:00AM
修稿时间:06 13 2006 12:00AM

Application of CSAMT on the Preliminary Exploration of Deeply-lying Tunnel
MAO Jun-biao,WU Fa-quan,DI Qing-yun,CHAI Jian-feng.Application of CSAMT on the Preliminary Exploration of Deeply-lying Tunnel[J].Geoscience——Journal of Graduate School,China University of Geosciences,2006,20(3):513-518.
Authors:MAO Jun-biao  WU Fa-quan  DI Qing-yun  CHAI Jian-feng
Institution:1. School of Engineering and Technology, China University of Geosciences, Beijing 100083, China; 2. Institute of Geology and Geophysics, Chinese Academy of Sciences, Beijing 100029, China
Abstract:According to the regional geology background,sedimentary rocks mode and condition,and physical features of rocks,the characteristics of CSAMT section of the first stage of the west route of the South-to-North Water Transfer Project are analyzed to explore the strata structure,fault and groundwater condition.The CSAMT section is classified into four fragments in length of the total surveying line,which is 13 kilometers long.Results of comprehensive exploration technology of geophysics answer for the geology information of rock outcrops to fault zone and crash belt,which are verified by drilling data.CSAMT is worth popularizing in engineering of long embedded tunnel.
Keywords:the first stage of the west route of the South-toNorth Water Transfer Project  CSAMT  deeply-(lying) tunnel  resistance  forecast
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号