汶川地震断裂带科学钻探项目WFSD-3孔泥浆技术的设计与应用
引用本文:张统得,陈礼仪,刘徐三,张文生,张正. 汶川地震断裂带科学钻探项目WFSD-3孔泥浆技术的设计与应用[J]. 探矿工程, 2012, 39(9): 41-44
作者姓名:张统得  陈礼仪  刘徐三  张文生  张正
作者单位:[1]成都理工大学地质灾害防治与地质环境保护国家重点实验室,四川成都610059 [2]安徽省地质矿产勘查局313地质队,安徽六安237010
基金项目:基金项目:科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题
摘    要:汶川科钻WFSD-3孔钻遇地层极其复杂,硬脆碎地层与强水敏性等地层交替出现,给钻进施工带来极大安全隐患。针对该孔特殊地层情况,以孔壁稳定性理论分析为指导,在室内实验研究的基础上,优选出NH4-HPAN、K—PAM、SAS和KHm等抑制剂组成的泥浆体系配方,并结合室内FA无渗透实验以及ZNP-01页岩膨胀性实验对该泥浆配方进行封堵性和抑制性评价,提出了新型泥浆体系,并得以良好应用。还对现场应用遇到的泥浆粘度与切力控制、钻头防泥包技术以及钻水泥塞钙侵处理技术等进行归纳总结,对复杂地层钻进施工具有较好的借鉴意义。

关 键 词:汶川地震  地震断裂带  科学钻探  复杂地层  孔壁稳定  泥浆体系设计  泥浆维护
收稿时间:2012-08-08
修稿时间:2012-08-08

Mud System Design and Application in the WFSD-3 of Wenchuan Earthquake Fault Scientific Drilling Project
ZHANG Tong-de,CHEN Li-yi,LIU Xu-san,ZHANG Wen-sheng and ZHANG Zheng. Mud System Design and Application in the WFSD-3 of Wenchuan Earthquake Fault Scientific Drilling Project[J]. Exploration Engineering:Rock & Soil Drilling and Tunneling, 2012, 39(9): 41-44
Authors:ZHANG Tong-de  CHEN Li-yi  LIU Xu-san  ZHANG Wen-sheng  ZHANG Zheng
Affiliation:ZHANG Tong-de , CHEN Li-yi , LIU Xu-san , ZHANG Wen-sheng2, ZHANG Ztwng2 ( 1. State Key Laboratory of Geo- hazard Prevention and Geoenvironment Protection, Cbengdu University of Technology, Cbengdu Sichuan 610059, China; 2. 313 Geological Brigade of Anhui Exploration and Development Bureau of Geology and Mineral Resources, Lu' an Anhui 237010, China)
Abstract:The drilling formation of WFSD - 3 hole is extremely complex with hard, brittle and broken formation and high water sensitivity formation appearing alternately, which brought huge hidden danger to the drilling construction. According to the special formation situation of the hole, based on the borehole stability theory analysis and the laboratory experiments, NH4 - HPAN, K - PAM, SAS and KHm inhibitors had been selected out as the optimized additives for the mud system. In addition, the laboratory sand-bed non-filtration experiments and the ZNP- 01 shale swelling experiments had been carried out to evaluate the blocking and inhibitory capacity of the mud formulations. This mud system has satisfactory application effects. The paper also summarized some treatment technologies in the application of mud maintenance, such as mud vis- cosity and gels control technique, the drill bit anti-bailing technique and calcium invasion treatment technique while drilling cement plug, which have a good reference to drilling in the complex formation.
Keywords:Wenchuan earthquake  earthquake fault  scientific drilling  complex formation  borehole stability  mud sys- tem design  mud maintenance