伊拉克哈法亚油田高压盐膏层安全钻井技术
引用本文:谢春来,王照阳,仇越,勾广洲,高军飞,尹光,吴勇.伊拉克哈法亚油田高压盐膏层安全钻井技术[J].吉林大学学报(地球科学版),2020,50(2):589-597.
作者姓名:谢春来  王照阳  仇越  勾广洲  高军飞  尹光  吴勇
作者单位:大庆钻探工程公司国际事业部, 黑龙江 大庆 163411
基金项目:国家自然科学基金项目(41472173);国土资源部杰出青年科技人才培养计划项目(201311111)
摘    要:盐膏层钻井是当前钻井技术的难题之一,钻井施工中存在盐膏层及软泥岩层安全钻进难度大、井身质量控制困难和卡钻几率较大等问题。本文针对伊拉克哈法亚油田的地层条件:改变了盐膏层段套管坐封点,使套管漏封漏失状况得到有效控制;将定向轨迹井斜角由71.29°优化为29.48°,避开了易形成岩屑床井段,有效控制定向段卡钻,提高施工效率23%;确定哈法亚油田软泥岩缩径周期为48 h左右。根据缩径规律开展钻井,有效减少了钻头泥包和泥环的形成。确定了依据石膏岩、盐岩含量变化控制饱和盐水钻井液密度的原则,形成了控制饱和盐水钻井液黏度的现场维护技术措施。

关 键 词:盐膏层  钻井  井身结构优化  钻井液体系优化  哈法亚油田  
收稿时间:2020-01-19

Safe Drilling Technology of High Pressure Salt Paste Formation in Halfaya Oilfield,Iraq
Xie Chunlai,Wang Zhaoyang,Qiu Yue,Gou Guangzhou,Gao Junfei,Yin Guang,Wu Yong.Safe Drilling Technology of High Pressure Salt Paste Formation in Halfaya Oilfield,Iraq[J].Journal of Jilin Unviersity:Earth Science Edition,2020,50(2):589-597.
Authors:Xie Chunlai  Wang Zhaoyang  Qiu Yue  Gou Guangzhou  Gao Junfei  Yin Guang  Wu Yong
Institution:International Drilling and Exploration Engineering Corporation, Daqing 163411, Heilongjiang, China
Abstract:Drilling of salt paste layers is one of the problems of current drilling technology. During the drilling construction, there are problems such as the difficulty in safe drilling of salt paste and soft mudstone layers, control of well quality, and high probability of stuck drilling, etc. Based on the formation conditions of Halfaya oilfield in Iraq, the authors changed the casing sealing point of salt-gypsum interval,effectively controlled the casing leakage,and optimized the angle of directional trajectory well from 71.29° to 29.48°, thus avoided the well sections that are easy to form rock chip beds and the well stuck in the directional sections, hereby the drilling efficiency was improved by 23%. The shrinkage period of soft mudstone in Halfaya oilfield is determined to be 48 h approximately. Drilling according to the diameter reduction law effectively reduced the formation of mud packs at the bit and mud rings. Through this study,the principle of controlling the density of saturated brine drilling fluid according to the content change of gypsum rock and salt rock is determined, and the on-site maintenance technical measure for viscosity control of saturated saline drilling fluid is formed.
Keywords:salt-gypsum formation  drilling well  wellbore configuration optimization  drilling fluid system optimization  Halfaya oilfield  
本文献已被 CNKI 等数据库收录!