首页 | 本学科首页   官方微博 | 高级检索  
     


Investigation on Cutting Stability of Jacket in Decommissioning Process
Authors:LI Mei-qiu  DUAN Meng-lan  HUANG Yi
Affiliation:Department of Architecture Engineering, Dalian University of Technology, Dalian 116024, China;Offshore Oil/Gas Research Center, China University of Petroleum, Beijing 102249, China;Department of Architecture Engineering, Dalian University of Technology, Dalian 116024, China
Abstract:Jacket cutting operation is one of the most complicated and highest risk operations in the process of decommissioning offshore piled platform, the security and stability of which must be assured. In this paper, the current research on offshore structure removal and jacket cutting is introduced, on the basis of which the types of load along with the load calculation method are determined. The main influences on the stability of a jacket in cutting are analyzed. The experiment test plan is drawn by using orthogonal testing method, and the formula of critical load during the cutting procedure is deduced by differential evolution algorithm. To verify the method and results of this paper, an offshore piled platform to be decommissioned in the South China Sea is taken for an example, and the detailed schedule for jacket cutting is made with the three-dimensional finite element model of the jacket established. The natural frequency, stress, strain and stability of the jacket during cutting process are calculated, which indicates that the results of finite element analysis agree well with that of the deduced formula. The result provides the scientific reference for guaranteeing the safety of jacket in cutting operation.
Keywords:stability   jacket   cutting operation   piled platforms   decommissioning
点击此处可从《海洋工程》浏览原始摘要信息
点击此处可从《海洋工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号