首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Developing new equations for TBM performance prediction in carbonate-argillaceous rocks: a case history of Nowsood water conveyance tunnel
Abstract:Nowsood water conveyance tunnel is 49 km long and has been designed for transferring 70 m3/s water from Sirvan river southward to Dashte Zahab plain in the west of Iran. This long tunnel has been divided into three sections, namely 1A, 1B and 2. By April 2008, about 5.3 km of the lot 2 of this project, with a total length of 26 km, were excavated by a double-shield TBM. The bored section of tunnel passed through different geological units of three main formations of the Zagross mountain ranges which mainly consist of weak to moderately strong argillaceous-carbonate rocks. This paper will offer an overview of the project, concentrating on the TBM operation, and review the results of the field performance of the machine. Also results of statistical analyses to evaluate correlation of TBM performance parameters with rock mass characteristics will be discussed. The results of machine performance analysis indicated that there are strong relationships between geomechanical parameters and TBM performance parameters in this particular project. In this research some empirical equations and a chart have been developed to estimate TBM performance parameters in similar cases based on common rock mass properties.
Keywords:TBM performance  penetration rate  field penetration index  rock mass boreability
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号