首页 | 本学科首页   官方微博 | 高级检索  
     

人工挖孔桩施工常出现的安全问题及解决办法
引用本文:周亚利,徐伟辉,范佐虹. 人工挖孔桩施工常出现的安全问题及解决办法[J]. 吉林地质, 2008, 27(1)
作者姓名:周亚利  徐伟辉  范佐虹
作者单位:吉林省第二地质探矿工程大队,吉林,吉林市,132013;吉林省地矿建设集团公司西北分公司,吉林,长春,130012
摘    要:提出人工挖孔桩施工中由于挖桩设备、人为因素及自然因素引起的安全问题,并根据这些因素提出具体解决办法。

关 键 词:人工挖孔桩  安全问题  解决办法

Dangerous incidents often happened during hand digging pile foundation and solved their methods
ZHOU Ya-li,XU Wei-hui,FAN Zuo-hong. Dangerous incidents often happened during hand digging pile foundation and solved their methods[J]. Jilin Geology, 2008, 27(1)
Authors:ZHOU Ya-li  XU Wei-hui  FAN Zuo-hong
Affiliation:ZHOU Ya-li1,XU Wei-hui2,FAN Zuo-hong11.The Second Engineering Team of Geologic Exploration of Jilin Province,Jilin 132013,Jilin,China2.Dikuang Construction Group Company of Jilin Province,Changchun 130012,Jilin,China
Abstract:Dangerous incidents often happened during hand digging pile foundation are put forward due to digging pile equipments,artificial and natural factors,then,pointed out solving methods on the basis of the factors.
Keywords:hand digging pile foundation  existing danger  solving methods
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号