首页 | 本学科首页   官方微博 | 高级检索  
     

裸眼系列完井方式下叠式分支水平井产能预测
引用本文:陈阳,熊友明,陈宗毅,王彬,张林,刘理明. 裸眼系列完井方式下叠式分支水平井产能预测[J]. 地质科技情报, 2012, 31(3): 73-76. DOI: 10.3969/j.issn.1000-7849.2012.03.011
作者姓名:陈阳  熊友明  陈宗毅  王彬  张林  刘理明
作者单位:1.西南石油大学完井技术中心,成都,610500;2.胜利油田分公司采油工艺研究院,山东东营,257000
基金项目:国家科技重大专项子课题
摘    要:综合运用保角变换、镜像反映愿理,势的叠加原理以及等值渗流阻力等数学和渗流力学分析方法,推导出裸眼系列完井方式下叠武分支水平井的产能解析公式,当分支数目为1时,所推导的解析公式退化为著名的Borisov公式.分析了影响其产能的几个重要因素,从而为该类型分支井的完井方案设计提供参考依据.经研究发现,完井筛管挡砂精度越高,相比水平井,叠式分支水平井产能损失相对越少;叠武分支水平井的产能受其在上下封闭边界油藏中垂向位置的影响较小;相比微元段模型,解析模型预测的产能偏高,引入校正系数后可减小偏差.

关 键 词:叠式分支水平井  完井  产能  保角变换  渗流阻力

A Productivity Forecasting Method for Stacked Multilateral Horizontal Well under Open Hole Series Completion System
CHEN Yang , XIONG You-ming , CHEN Zong-yi , WANG Bin , ZHANG Lin , LIU Li-ming. A Productivity Forecasting Method for Stacked Multilateral Horizontal Well under Open Hole Series Completion System[J]. Geological Science and Technology Information, 2012, 31(3): 73-76. DOI: 10.3969/j.issn.1000-7849.2012.03.011
Authors:CHEN Yang    XIONG You-ming    CHEN Zong-yi    WANG Bin    ZHANG Lin    LIU Li-ming
Affiliation:1(1.Center of Well Completion Technology,Southwest Petroleum University,Chengdu 610500,China;2.Research Institute of Oil Production Technology in Shengli Oilfield Company,Dongying Shandong 257000,China)
Abstract:A series of productivity forecasting formulas for stacked multilateral horizontal well under open hole series completion system have been derived.Many relative mathematical analytical methods and permeation fluid mechanics are used,i.e.conformal transformation,potential superposition theory,method of mirror and equivalent filtrational resistance theory.The formula for ideal well can be simplified as the Borisov Equation when there is only one branch.The study found that stacked multilateral horizontal well will take a relatively less productivity reduction than traditional horizontal well in the case of a higher sieve-opening sine of premium screen pipe for sand control.Productivity of this type of well is almost free from its vertical location in closed boundary reservoir.A coefficient has been adopted to correct the productivity overestimated by the analytical method after comparing with infinitesimal method.
Keywords:stacked multilateral horizontal well  well completion  productivity  conformal transformation  filtrational resistance
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号