地震荷载作用下大坂盾构隧道管片配筋校核
引用本文:戴永浩,陈卫忠,谭贤君,黄 胜.地震荷载作用下大坂盾构隧道管片配筋校核[J].岩土力学,2010,31(Z2):236-241.
作者姓名:戴永浩  陈卫忠  谭贤君  黄 胜
作者单位:1. 中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉 430071; 2. 铁道第四勘察设计院集团有限公司,武汉 430063
基金项目:国家重点基础研究发展规划(973)(No. 2009CB724603);国家自然科学基金(No. 40772184)资助;中国科学院武汉岩土力学研究所知识创新工程领域前沿项目(No. 0714011Q01)。
摘    要:将盾构隧道管片视为分段曲梁、管片之间为铰接关系、管片与地层之间为非线性接触关系,边界采用无限元吸收地震波的反向与折射,地层服从Mohr-Coulomb弹塑性本构模型,地震波采用EI-Centro波,采用地层-结构法,应用隐式动力有限元分析地震荷载作用下管片轴力与弯矩分布情况。根据有限元计算结果,结合结构力学方法,校核管片配筋是否合理。与荷载结构法相比,其方法可模拟围岩与管片、管片与管片之间的相互关系,并可考虑锚杆等支护结构对管片受力的影响,因而,计算结果更为精确。研究为盾构隧道管片配筋优化设计,降低隧道支护成本,提供了一种管片配筋校核计算方法与设计依据。

关 键 词:地层-结构法  接触  地震荷载  盾构隧道  配筋校核  
收稿时间:2010-08-02

Reinforcement check of Daban shield tunnel segment under seismic loads
DAI Yong-hao,CHEN Wei-zhong,TAN Xian-jun,HUANG Sheng.Reinforcement check of Daban shield tunnel segment under seismic loads[J].Rock and Soil Mechanics,2010,31(Z2):236-241.
Authors:DAI Yong-hao  CHEN Wei-zhong  TAN Xian-jun  HUANG Sheng
Institution:1. State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences, Wuhan 430071,China; 2. China Railway Siyuan Survey and Design Group Co. Ltd., Wuhan 430063, China
Abstract:Taking the shield tunnel segment as a section curved beam, the segment was articulated each other and contacted nonlineariy with the rock stratum. Infinite element was used to absorb the reflection and refraction of seisminc waves in boundary; the Mohr-Coulomb elastoplastic constitutive model and EI Centro seismic wave were used; an implicit dynamic finite element analysis of axial force and bending moment distributions under seismic loads was conducted by stratum structure method. According to the finite element analysis results, the reinforcement of the segment is checked combining with structural mechanics approach. Comparing with the load-structure method, the proposed method can simulate the relationships between the segments, segment and surrounding rock; the supporting structure such as bolt can also be considered; so the method can give more accurate results. The research provides a method of checking calculation and design basis for the optimization design of the shield tunnel and reduces the cost of the support.
Keywords:stratum structure method  contact  seismic loads  shield tunnel  reinforcement check