首页 | 本学科首页   官方微博 | 高级检索  
     

西北地区某干旱河流设计情景下的年径流量预测分析
引用本文:董雯,崔保山. 西北地区某干旱河流设计情景下的年径流量预测分析[J]. 冰川冻土, 2012, 34(5): 1236-1240. DOI: 10.7522/j.issn.1000-0240.2012.0151
作者姓名:董雯  崔保山
作者单位:北京师范大学 环境学院 环境模拟与污染控制国家重点联合实验室, 北京 100875
摘    要:人类活动和气候变化对流域水文水资源的影响及由此所带来的社会、 经济和生态效应, 使得新疆精河流域出现了严重的水资源短缺和生态危机. 为此, 实施跨流域调水是解决艾比湖流域生态环境保护的必要措施, 精河上游支流是跨流域引入外水的唯一捷径河流. 根据前期研究计算的年径流量系列, 在经过论证的流域现状水平(Cv=0.12, Cs/Cv=2.00)的基础上, 采用水文频率分析方法, 设计并预测了流域规划的近期和远期目标情景下的年径流量情势. 结果显示: 为了使保证率p=75%, 近期目标要求流域的输水量为8.62×108 m3, 远期目标为14.39×108 m3. 跨流域调水可以满足流域多方面的实际用水需求.

关 键 词:径流量  预测  精河流域  跨流域调水  
收稿时间:2012-06-12
修稿时间:2012-08-18

Predictive Analysis of Annual Runoff under Design Scenarios in an Arid River, Northwest China
DONG Wen,CUI Bao-shan. Predictive Analysis of Annual Runoff under Design Scenarios in an Arid River, Northwest China[J]. Journal of Glaciology and Geocryology, 2012, 34(5): 1236-1240. DOI: 10.7522/j.issn.1000-0240.2012.0151
Authors:DONG Wen  CUI Bao-shan
Affiliation:School of Environment, State Key Joint Laboratory of Environmental Simulation and Pollution Control, Beijing Normal University, Beijing 100875, China
Abstract:The impacts of human activity and climate change on watershed hydrology and water resources, and its resulting in social, economic and ecological effects, had caused the serious water resources shortage and ecological crisis in the Jinghe River Basin, Xinjiang. To this end, the implementation of the inter-basin water transfer is necessary measures to protect the eco-environment of the Ebinur Lake Basin, and the upstream tributaries are the only shortcut river of the interbasin water transfer in the Jinghe River. According to the calculated annual runoff series in the previous studies, we designed and predicted annual runoff situation in the short-term and long-term goals scenarios of the watershed planning by means of the hydrological frequency analysis based on the demonstrated watershed present situation (Cv=0.12, Cs/Cv=2.00). Results indicated the water delivery quantity in the basin is 8.62?108 m3 for short-term goal and 14.39?108 m3 for long-term goal in order to make the guarantee rate p=75%, which showed that the interbasin water transfer may meet the actual demand water and solve the water resources shortage, seasonal water scarcity and the conflicts between ecological and economic water requirement.
Keywords:runoff prediction  Jinghe River Basin  interbasin water transfer
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《冰川冻土》浏览原始摘要信息
点击此处可从《冰川冻土》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号