首页 | 本学科首页   官方微博 | 高级检索  
     检索      

青岛市后海岸滩填海造地工程的动态管理
引用本文:王莉.青岛市后海岸滩填海造地工程的动态管理[J].海岸工程,1997(3).
作者姓名:王莉
作者单位:青岛市岸滩建设开发公司!266032
摘    要:青岛市后海岸滩建设开发改造工程,在建设过程中,对一些重大项目实行了动态管理,从而缩短了工期,提高了工程质量,减少了工程投资,提高了经济效益,实现了多快好省的建设目标。依据参与该动态管理的实践,介绍了就工程实行动态管理及需注意的问题。

关 键 词:青岛市后海  岸滩开发  动态管理

THE DYNAMIC MANAGEMENT IN CONSTRUCTION OF SEA-FILLING AND LAND MAKING IN THE BACK BEACH OF QINGDAO
Wang Li.THE DYNAMIC MANAGEMENT IN CONSTRUCTION OF SEA-FILLING AND LAND MAKING IN THE BACK BEACH OF QINGDAO[J].Coastal Engineering,1997(3).
Authors:Wang Li
Abstract:During the transformation and development of the back beach of Qingdao,some important projects were executed by dynamic management, so that the period of construction was shortened, the construction quality was improved, the investment was reduced and better economic benifit was achieved. The constrution goal-more, quicker,better, and cheaper-was realized.Based on the practical experience in taking the dynamic management, the author introduced this method as well as some problems worthwhile to pay attention to.
Keywords:the back beach of Qingdao the development of beach dynamic management
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号