首页 | 本学科首页   官方微博 | 高级检索  
     检索      

青藏高原上低槽与切变线动能收支的个例分析
引用本文:郁淑华,骆红.青藏高原上低槽与切变线动能收支的个例分析[J].高原气象,1993,12(3):251-256.
作者姓名:郁淑华  骆红
作者单位:成都高原气象研究所,成都高原气象研究所 四川省 成都市610072,四川省 成都市610072
摘    要:

关 键 词:动能收支  低槽  切变线  青藏高原

THE CONTRAST ANALYSIS OF KINETIC ENERGY BUDGET FOR DEVELOPING TROUGH AND SHEAR LINE OVER THE QINGHAI-XIZANG PLATEAU
Yu Shuhua Luo Hong.THE CONTRAST ANALYSIS OF KINETIC ENERGY BUDGET FOR DEVELOPING TROUGH AND SHEAR LINE OVER THE QINGHAI-XIZANG PLATEAU[J].Plateau Meteorology,1993,12(3):251-256.
Authors:Yu Shuhua Luo Hong
Abstract:The kinetic energy budget for a developing trough and a shear line over the Qinghai-Xizang Plateau, which occurred respectively in the period from 25 to 28 July 1982 and from 4 to 6 June 1982, had been studied by the diagnostic analysis. The same features are: (1) there is a process of transformation from effective potential energy into kinetic energy, and the maximum value of kinitic energy transformed appears when the trough is developing and extending southwards and the shear line is stabilizing. (2) The kinetic energy is decreased by divergence of the flux of potential energy is most obvious when the trough is developing and the shear line is stabilizing. The different features are: (1) the value of kinetic energy in shear zone is larger than that in trough zone. (2) The kinetic energy is increased by the term of energy source when the shear line forming, and the kinetic energy is decreased by the term of energy source when the trough developing.
Keywords:The kinetic energy budget  Trough  Shear line  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号