首页 | 本学科首页   官方微博 | 高级检索  
     

地质力学模型试验中软弱结构面内埋式位移系统的研制与应用
引用本文:杨庚鑫,马德萍,张林,陈媛,董建华. 地质力学模型试验中软弱结构面内埋式位移系统的研制与应用[J]. 岩土力学, 2014, 35(3): 901-907
作者姓名:杨庚鑫  马德萍  张林  陈媛  董建华
作者单位:1. 四川大学 水力学与山区河流开发保护国家重点实验室,成都 610065;2. 四川大学 水利水电学院,成都 610065; 3. 成都市政工程设计研究院,成都 610015
基金项目:国家自然科学基金资助项目(No.51109152,No.51379139)。
摘    要:
在高拱坝坝肩稳定地质力学模型试验研究过程中,坝肩岩体内各软弱结构面的相对位移变化趋势是判定坝肩失稳及分析坝肩整体稳定安全度的重要参考依据。目前的量测仪器,如电阻应变片、表面位移计只能对坝体应变和坝肩抗力体表面位移进行量测,而对于坝肩岩体内软弱结构面的相对位移则难以获取。因此,针对上述问题,以电阻应变技术为基础,研制了用于获取结构面相对位移的内埋式位移系统,该系统由信号采集仪器、惠斯通电桥和位移传感器组成。在模型试验中,通过内埋式位移系统,获得加载过程中相应测点的应变变化过程,再由应变-位移关系曲线,即可得出位移值。结合锦屏一级高拱坝整体稳定地质力学模型试验,将该系统安装于需量测的坝肩软弱结构面上,获得了结构面在加载过程中的位移变化过程线,同时与大坝应变和坝肩表面位移监测成果进行对比分析,验证了内埋式位移系统的可行性,其测试成果可为判定坝与地基的整体稳定提供依据。

关 键 词:坝肩稳定  地质力学模型  位移量测  内埋式位移系统  
收稿时间:2013-05-06

Design of structure inbuilt displacement measurement system in geomechanical model test and its application
YANG Geng-xin,MA De-ping,ZHANG Lin,CHEN Yuan,DONG Jian-hua. Design of structure inbuilt displacement measurement system in geomechanical model test and its application[J]. Rock and Soil Mechanics, 2014, 35(3): 901-907
Authors:YANG Geng-xin  MA De-ping  ZHANG Lin  CHEN Yuan  DONG Jian-hua
Affiliation:1. State Key Laboratory of Hydraulics and Mountain River Engineering, Sichuan University, Chengdu 610065, China;2. College of Water Resources and Hydropower, Sichuan University, Chengdu 610065, China;3. Chengdu Municipal Engineering Design and Research Institute, Chengdu 610015, China
Abstract:
In high arch dam abutment stability geomechanical model test, the relative displacement of weak structural plane is the important reference to determine dam abutment instability and analyze whole dam abutment safety degree. But the current measuring instruments, such as resistance strain gage, surface displacement meter just can measure the strain of dam body and displacement of surface dam abutment; for the relative displacement of weak structural plane which in dam abutment is difficult to obtain. So in light of this problem, based on the resistance strain gage technology, a new type of inbuilt displacement system has been developed and installed on the structural planes to obtain the relative displacement of structure. This system are composed by signal acquisition instrument, Wheatstone bridge and displacement sensor. In model test, strain changing process is got using the inbuilt displacement system; and displacement value is got through the strain-displacement curve. In integral stability geomechanical model test of Jinping high arch dam, installing this system in weak structural plane, the relative displacement is obtained efficiently during the loading process. Comparing with the strain and the abutment surface displacement monitoring results, the feasibility of inbuilt displacement system is proved. The results can provide reliable data to determine the overall stability of the dam and foundation.
Keywords:abutment stability of arch dam  geomechanical model  displacement measurement  inbuilt displacement system
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号