首页 | 本学科首页   官方微博 | 高级检索  
     检索      

宁东煤炭基地金凤煤矿GPS地面变形监测研究
引用本文:王国瑞,徐友宁,程霞,张佳.宁东煤炭基地金凤煤矿GPS地面变形监测研究[J].地质通报,2018,37(12):2199-2207.
作者姓名:王国瑞  徐友宁  程霞  张佳
作者单位:宁夏回族自治区国土资源调查监测院, 宁夏 银川 750002;中国矿业大学(北京), 北京 100083,中国地质调查局西安地质调查中心, 陕西 西安 710054,宁夏回族自治区国土资源调查监测院, 宁夏 银川 750002,宁夏回族自治区国土资源调查监测院, 宁夏 银川 750002
基金项目:中国地质调查局项目《秦岭及宁东矿产资源集中开采区地质环境调查》(编号:DD20160336)和《青海矿业开发地质环境效应调查》(编号:121201122024)
摘    要:掌握采空区地面变形规律是科学预防和治理地面塌陷的前提与基础,是煤矿地质环境动态变化的重要监测内容。以宁东煤炭基地金凤煤矿为例,在收集、了解金凤煤矿0110202和011805工作面开采时间、开采深度、开采煤厚、工作面长度、工作面宽度、工作面走向等参数的基础上,建立工作面地表自动化GPS监测点,将工作面开采进程与地面变形时间、空间统一起来,研究工作面地面变形时间和变形量的规律。结果表明,金凤煤矿011202工作面地面变形一般在采后13个月左右进入变形活跃阶段,从开始变形到地面开始稳定的持续时间为16~19个月,最大累积变形量约为3300mm;011805工作面采空区地面变形一般在采后10~11个月进入变形活跃阶段,从开始变形到地面开始稳定的持续时间为13~16个月,最大累积变形量约为2600mm。研究结果为金凤煤矿后续工作面开采地表变形规律及类似开采条件下采空塌陷的预防与治理提供了定量化的依据。

关 键 词:煤矿采空区  地面变形  GPS监测  变形规律  金凤煤矿
收稿时间:2018/1/10 0:00:00
修稿时间:2018/6/20 0:00:00

A study of GPS ground deformation monitoring of Jinfeng coal mine in Ningdong coal base
WANG Guorui,XU Youning,CHENG Xia and ZHANG Jia.A study of GPS ground deformation monitoring of Jinfeng coal mine in Ningdong coal base[J].Geologcal Bulletin OF China,2018,37(12):2199-2207.
Authors:WANG Guorui  XU Youning  CHENG Xia and ZHANG Jia
Institution:Ningxia Survey and Monitor Institute of Land and Resources, Yinchuan 750002 Ningxia, China;China University of Mining and Technology(Beijing), Beijing 100083, China,Xi''an Center of Geological Survey, CGS, Xi''an 710054, Shaanxi, China,Ningxia Survey and Monitor Institute of Land and Resources, Yinchuan 750002 Ningxia, China and Ningxia Survey and Monitor Institute of Land and Resources, Yinchuan 750002 Ningxia, China
Abstract:To master the law of ground deformation in the goaf is the prerequisite and foundation for scientific prevention and control of ground collapse, and also an important monitoring content for the dynamic change of the geological environment of the mine. With Jinfeng coal mine in Ningdong coal base as a study case and on the basis of collecting and understanding the mining time, mining depth, mining coal thickness, length of working face, width of working face and direction of working face, the authors set up the automatic GPS monitoring point on the surface of the working face of Jinfeng coal mine. The mining process is unified with the time and space of ground deformation. The authors tried to study the law of ground deformation time and deformation under mining and similar mining conditions. The result shows that the ground deformation of 011202 working face was usually subjected to severe deformation about 13 months after mining and reached the stability 15-17 months after the beginning of deformation, with the maximum cumulative variable being about 3300mm. The ground deformation in the goaf of 011805 working face usually occurred violently 10-11 months after mining and reached the stability 13-16 months after the beginning of deformation, with the maximum cumulative variable being about 2600mm. The research results provide quantitative basis for the prevention of surface subsidence and the prevention and treatment of gob collapse under similar mining conditions.
Keywords:coal-mining area  ground deformation  GPS monitoring  deformation law  Jinfeng coal mine
本文献已被 CNKI 等数据库收录!
点击此处可从《地质通报》浏览原始摘要信息
点击此处可从《地质通报》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号