首页 | 本学科首页   官方微博 | 高级检索  
     检索      

倾斜布管采控天然冷量的青藏铁路路基温度场演变规律
引用本文:周国庆,别小勇,刘志强,周金生,王建州.倾斜布管采控天然冷量的青藏铁路路基温度场演变规律[J].冰川冻土,2004,26(Z1):121-127.
作者姓名:周国庆  别小勇  刘志强  周金生  王建州
作者单位:School of Civil Engineering, China University of Mining and Technology, Xuzhou J iangsu 221008, China;State Key Laboratory of Frozen Soil Engineering, CAREERI, CAS, Lanzhou Gansu 730000, China
摘    要:Aiming at the stabilization of Qinghai-Tibetan Railway embankment during its construction and run, the method using tilt pipes to keep the permafrost embankment stabilization is put forward in the paper. By gathering natural cold energy in the winter and release it in the summer the tilt pipes can keep the permafrost embankment stabilizing. The temperature fields of the embankment and the stratums below are studied according to the condition of pipes diameter 250mm, length 7. 0m and tilt angle 30°,45°, 60° until the railway working for 20 years. It is shown that the embankment field using tilt pipes will eliminate the thawing core and come into subzero temperature phase ahead of 9 years compared with the original model. Different tilt angles have different efforts on the embankment and stratums, synthesis analysis of thermal income and expenses of the embankment and stratums should be carried out

关 键 词:Qinghai-Tibetan  Railway  embankment  tilt  pipe  temperature  field  gathering  and  controlling  natural  cold  energy

Temperature Field Evolvement of Qinghai-Tibetan Railway Embankment upon Gathering and Controlling Natural Cold Energy with Tilt Pipes
ZHOU Guo-qing,BIE Xiao-yong,LIU Zhi-qiang,ZHOU Jin-sheng,WANG Jiang-zhou.Temperature Field Evolvement of Qinghai-Tibetan Railway Embankment upon Gathering and Controlling Natural Cold Energy with Tilt Pipes[J].Journal of Glaciology and Geocryology,2004,26(Z1):121-127.
Authors:ZHOU Guo-qing  BIE Xiao-yong  LIU Zhi-qiang  ZHOU Jin-sheng  WANG Jiang-zhou
Abstract:Aiming at the stabilization of Qinghai-Tibetan Railway embankment during its construction and run, the method using tilt pipes to keep the permafrost embankment stabilization is put forward in the paper. By gathering natural cold energy in the winter and release it in the summer the tilt pipes can keep the permafrost embankment stabilizing. The temperature fields of the embankment and the stratums below are studied according to the condition of pipes diameter 250mm, length 7. 0m and tilt angle 30°,45°, 60° until the railway working for 20 years. It is shown that the embankment field using tilt pipes will eliminate the thawing core and come into subzero temperature phase ahead of 9 years compared with the original model. Different tilt angles have different efforts on the embankment and stratums, synthesis analysis of thermal income and expenses of the embankment and stratums should be carried out
Keywords:Qinghai-Tibetan Railway  embankment  tilt pipe  temperature field  gathering and controlling natural cold energy
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号