首页 | 本学科首页   官方微博 | 高级检索  
     


Proof of settlement-time curve appearing “S” shape with ramp load and its application base on stress-strain relationship
Authors:MEI Guo-xiong  ZAI Jin-min  YIN Zong-ze  ZHAO Wei-bing
Affiliation:1. College of Civil Engineering, Nanjing University of Technology, Nanjing 210009, China; 2. Department of Geotechnical Engineering, Nanjing Hydraulic Research Institute, Nanjing 210024, China; 3. Research Institute of Geotechnical Engineering, Hohai University, Nanjing 210098, China
Abstract:Based on stress-strain relationship of soil, the proof is made for that s-t curve appears “S” shape when the load is increased linearly, which is similar to construction process. A new model of forecasting the relation of settlement-time is presented. Case history shows the rationality of the method.
Keywords:stress-strain relationship  ramp load  settlement-time curve  Poisson curve  S-shape  
点击此处可从《岩土力学》浏览原始摘要信息
点击此处可从《岩土力学》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号