首页 | 本学科首页   官方微博 | 高级检索  
     

隧道测量的设计和平差
引用本文:张正禄,A. 安东诺甫罗斯. 隧道测量的设计和平差[J]. 武汉大学学报 ( 信息科学版),1985,10(2): 1-9.
作者姓名:张正禄  A.安东诺甫罗斯
摘    要:
本文对隧道洞外、洞内控制网设计的一般法则进行了简略的论述,采用S-变换通过模拟数据计算验证了这些法则。应用两期变形测量原理将数理统计检验方法用于隧道测量。指出在隧道设计和施工阶段的测量和平差方法。

收稿时间:1984-09-01

Design and Adjustment of Tunnei Surveying
Zhang Zhenglu,A. Antonopoulos. Design and Adjustment of Tunnei Surveying[J]. Geomatics and Information Science of Wuhan University,1985,10(2): 1-9.
Authors:Zhang Zhenglu  A. Antonopoulos
Abstract:
In this paper the general principles for the design of above-and underground tunnel control net heve been discussed.By means of S-transformation and Calculation of simulated dates these Principles are verified and checked.The stastics test method is applied to the tunnel surveying by using the theory of two epoches deformationsanalysis.The method of measurement and adjustment in designs and driving stages of a tunnel is also dealt with.
Keywords:
本文献已被 CNKI 等数据库收录!
点击此处可从《武汉大学学报(信息科学版)》浏览原始摘要信息
点击此处可从《武汉大学学报(信息科学版)》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号