首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于时变权重组合与贝叶斯修正的中长期径流预报
引用本文:李伶杰,王银堂,胡庆芳,刘勇,刘定忠,崔婷婷.基于时变权重组合与贝叶斯修正的中长期径流预报[J].地理科学进展,2020,39(4):643-650.
作者姓名:李伶杰  王银堂  胡庆芳  刘勇  刘定忠  崔婷婷
作者单位:南京水利科学研究院水文水资源与水利工程科学国家重点实验室,南京 210029
云南龙江水利枢纽开发有限公司,云南 德宏 678400
基金项目:国家重点研发计划项目(2016YFC0400902);国家重点研发计划项目(2016YFC04009010);国家自然科学基金项目(51609140);国家自然科学基金项目(51809252)
摘    要:高精度的中长期径流预报信息是水资源规划管理与水利工程经济运行的重要基础支撑。论文在组合预报与误差修正2类径流预报后处理方法串联应用的技术框架下,考虑径流的高度非平稳与非线性等特征,提出了基于时变权重组合和贝叶斯修正的中长期径流预报方法。应用该方法开展了云南龙江水库年、月入库径流预报的实例研究,结果表明时变权重组合平衡了已建立的随机森林与支持向量机模型在建模期与检验期预报性能的差异,经贝叶斯修正后的预报精度接近或优于两阶段各自的最优单一模型。根据年径流预报结果判断水文年型的正确率达到77.2%,月预报径流的确定性系数超过0.90。因此,该方法在提升中长期径流预报精度方面具有积极效果。

关 键 词:中长期径流预报  时变权重组合  贝叶斯修正  云南龙江水库  
收稿时间:2019-11-03
修稿时间:2019-12-16

Mid- and long-term runoff prediction based on time-varying weight combination and Bayesian correction
LI Lingjie,WANG Yintang,HU Qingfang,LIU Yong,LIU Dingzhong,CUI Tingting.Mid- and long-term runoff prediction based on time-varying weight combination and Bayesian correction[J].Progress in Geography,2020,39(4):643-650.
Authors:LI Lingjie  WANG Yintang  HU Qingfang  LIU Yong  LIU Dingzhong  CUI Tingting
Institution:State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Nanjing Hydraulic Research Institute, Nanjing 210029, China
Yunnan Longjiang Water Conservancy Project Development Co., Ltd., Dehong 678400, Yunnan, China
Abstract:The mid- and long-term runoff prediction with satisfactory accuracy plays an important role as basic information in water resources planning & management and optimal operation of water conservancy projects. Combination and bias reduction are two common post-processing approaches in runoff forecast. Applying them in turn, considering the complicated non-stationary and nonlinear characteristics of runoff, a new mid- and long-term runoff prediction method by connecting time-varying weight combination and Bayesian correction is proposed. This method was used to study the annual and monthly inflow prediction of the Longjiang Reservoir in Yunnan Province. The results show that time-varying weight combination balances the performance difference of the established random forest (RF) and support vector machine (SVM) models in the modeling period and the test period. As a consequence of Bayesian correction, the prediction metrics are close to or better than the best of the predictions of the two individual stages. The proportion of correctly classified hydrological year type reaches 77.2% by employing the forecasted annual runoff, and the Nash-Sutcliffe efficiency coefficient of predicted monthly runoff series is over 0.90. Overall, the method put forward in this study has achieved positive effects in improving the forecast performance.
Keywords:mid- and long-term runoff prediction  time-varying weight combination  Bayesian correction  Longjiang Reservoir in Yunnan Province  
本文献已被 CNKI 等数据库收录!
点击此处可从《地理科学进展》浏览原始摘要信息
点击此处可从《地理科学进展》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号