首页 | 本学科首页   官方微博 | 高级检索  
     检索      

国道213线合作-郎木寺段改建工程路基处理技术
引用本文:辛平.国道213线合作-郎木寺段改建工程路基处理技术[J].冰川冻土,2005,27(3):449-453.
作者姓名:辛平
作者单位:甘肃省公路学会, 甘肃, 兰州, 730030
基金项目:甘肃省—中国科学院科技合作项目
摘    要:在分析国道213线合作-郎木寺段原有公路病害类型及机理基础上,总结和研究了改建工程中该路段不良路基的处理技术.季节性冻结、腐殖土、黑土及沼泽湿地是合作-郎木寺路段改造工程中遇到的主要工程问题,根据不同路段具体的工程地点特征,采用了砂砾换填、抛石挤淤、铺设土工布等相应工程措施.近2a的实践证明,这些措施不仅对于防治道路冻胀、翻浆和路基沉降病害是有效的,而且对类似地区道路工程建设具有重要借鉴意义.

关 键 词:路基  季节冻土  处理技术  软土  沼泽  
文章编号:1000-0240(2005)03-0449-05
收稿时间:2005-03-03
修稿时间:2005年3月3日

Embankment-Engineering Techniques for Rebuilding the National Highway 213 from Hezuo to Langmusi
XIN Ping.Embankment-Engineering Techniques for Rebuilding the National Highway 213 from Hezuo to Langmusi[J].Journal of Glaciology and Geocryology,2005,27(3):449-453.
Authors:XIN Ping
Institution:Gansu Highway and Transport Society, Lanzhou Gansu 730030, China
Abstract:Base on the analyses of the destroyed types and mechanisms of the National Highway 213 from Hezuo to Langmusi, which lies in a seasonal frozen soil region, the engineering techniques for solving frost heaving and frost boiling of embankment in the rebuild engineering are proposed. The average altitude of the highway is about {2 950 }~ {3 620 } m a.s.l. Meteorological data show that the maximal frozen depth in this area is 1 ^42 m. There is a large amount of soft soil, such as humus soil and black land along the highway, as well as swamp, which damage the way construction and operation. The original way had suffered heavy damages from cold weather and bad engineering geological conditions. In the rebuilding engineering of the highway 213 from Hezuo to Langmusi, designers adopted some engineering techniques in accordance with the engineering conditions of different sections of the way. Replace-filling embankment with gravel and riprap for extruding silt are built. Geotextile is also used to strengthen the embankment and obstruct moisture into the embankment. Practice shows that the engineering techniques are effective in preventing frost heaving and frost boiling of embankment. These techniques are also applicable to the areas of similar condition.
Keywords:mbankment  seasonal frozen ground  engineering technique  soft soil  swamp
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《冰川冻土》浏览原始摘要信息
点击此处可从《冰川冻土》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号