首页 | 本学科首页   官方微博 | 高级检索  
     检索      

基于SD法估算东安金矿床5号矿体资源储量
引用本文:薛明轩.基于SD法估算东安金矿床5号矿体资源储量[J].地质与勘探,2011,47(6):1177-1184.
作者姓名:薛明轩
作者单位:1. 吉林大学地球科学学院,吉林长春130061/黑龙江省有色金属地质勘查七0七队,黑龙江绥化152054
2. 吉林大学地球科学学院,吉林长春,130061
3. 吉林大学地球科学学院,吉林长春130061/黑龙江省有色金属地质勘查研究总院,黑龙江哈尔滨150046
4. 黑龙江省有色金属地质勘查七0七队,黑龙江绥化,152054
5. 黑龙江省有色金属地质勘查局,黑龙江哈尔滨,150090
基金项目:黑龙江省矿产资源补偿费地质勘查项目(编号:SD2002-031)资助
摘    要:资源储量估算是矿产地质勘查工作中的一项重要任务,是估算矿床经济价值和矿山设计的基本依据。SD资源储量估算和审定方法(SD法),诞生于20世纪80年代,它是一种以SD动态分维几何学为理论,以最佳结构地质变量为基础的资源储量估算方法,适于不同矿种及矿产勘查开采各个阶段,它应用SD精度法,成功量化矿产资源储量的地质可靠程度,...

关 键 词:东安  金矿床  SD法  资源储量估算  地质可靠程度
收稿时间:2010/8/30 0:00:00
修稿时间:2011/3/11 0:00:00

Estimation of Mineral Resource Reserve Based on the SD Method for the No.5 Au Ore-body in the Dong'an Gold Deposit, Heilongjiang Province
XUE Ming-xuan.Estimation of Mineral Resource Reserve Based on the SD Method for the No.5 Au Ore-body in the Dong'an Gold Deposit, Heilongjiang Province[J].Geology and Prospecting,2011,47(6):1177-1184.
Authors:XUE Ming-xuan
Institution:College of earth sciences,Jinlin university,Changchun,Jinlin
Abstract:Abstract:Estimation of resource reserve is an important task in mineral geological exploration as well as the fundamental basis to evaluate the economic significance of a deposit and design a mine.The SD estimation and examination methods for solid mineral resource reserve(SD method)was born in the 1980s, which is based on dynamic fractal geometry and structural geologic variable theory.This method can be applied to different types of deposits and every stage from ore survey to exploration.The SD precision approach can quantify the geological assurance of mineral resource reserve, forecast engineering control extent and number of engineering implementation.This paper deals with the application of the SD method to estimation of mineral resource reserve of No.5 Au ore-body in the Dong'an gold deposit of Helongjiang Provoince, including data preparation, data processing, and data output. By comparing the SD method and the traditional geological block method in results of reserve estimation, orebody determination, estimation parameters, storm grade processing, geological assurance, and degree of engineering controlling.It is proved that the SD method is based on the traditional method, suitable for geological exploration and estimation of mineral resources in China, and has advancement and practicality.The SD method can also improve the quality and technology level of exploration reports,and guide further mineral resource exploration.
Keywords:Dong'an  gold deposit  SD method  estimation of mineral resource reserve  geological assurance
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《地质与勘探》浏览原始摘要信息
点击此处可从《地质与勘探》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号